{"id":39381,"date":"2025-07-02T14:54:51","date_gmt":"2025-07-02T11:54:51","guid":{"rendered":"https:\/\/new80.usm.md\/?p=39381"},"modified":"2025-07-02T14:54:51","modified_gmt":"2025-07-02T11:54:51","slug":"plan-de-management-social-si-de-mediu-specific-amplasamentului","status":"publish","type":"post","link":"https:\/\/new80.usm.md\/?p=39381","title":{"rendered":"[:ro]PLAN DE MANAGEMENT SOCIAL \u0218I DE MEDIU SPECIFIC AMPLASAMENTULUI[:]"},"content":{"rendered":"<p>[:ro]<strong>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/strong><\/p>\n<p style=\"text-align: center\"><strong>Ministerul Educa\u021biei \u0219i Cercet\u0103rii<\/strong><\/p>\n<p style=\"text-align: center\"><strong>\u00a0<\/strong><\/p>\n<p style=\"text-align: center\"><strong>Proiectul \u00cenv\u0103\u021b\u0103m\u00e2ntul Superior din Moldova<\/strong><\/p>\n<p style=\"text-align: center\">\n<p style=\"text-align: center\"><strong>PLAN DE MANAGEMENT SOCIAL \u0218I DE MEDIU<\/strong><\/p>\n<p style=\"text-align: center\"><strong>SPECIFIC AMPLASAMENTULUI<\/strong><\/p>\n<p style=\"text-align: center\"><strong><u>C\u0103minul nr.2 din a Universit\u0103\u021bii de Stat din Moldova <\/u><\/strong><\/p>\n<p style=\"text-align: center\"><strong><u>Municipiul Chi\u0219in\u0103u, str. Tighina 2<\/u><\/strong><\/p>\n<p style=\"text-align: center\"><strong>\u00a0<\/strong><\/p>\n<p style=\"text-align: center\"><strong>Martie 2025<\/strong><\/p>\n<p style=\"text-align: center\"><strong>\u00a0<\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p>Cuprins<\/p>\n<ol>\n<li><a href=\"#_Toc184731078\"> INTRODUCERE \u0218I CONTEXT. 8<\/a><\/li>\n<\/ol>\n<p><a href=\"#_Toc184731079\">1.1.\u00a0\u00a0\u00a0\u00a0 Introducere. 8<\/a><\/p>\n<p><a href=\"#_Toc184731080\">1.2.\u00a0\u00a0\u00a0\u00a0 Descrierea General\u0103 a Proiectului 8<\/a><\/p>\n<p><a href=\"#_Toc184731081\">1.3.\u00a0\u00a0\u00a0\u00a0 Scopul \u0219i Obiectivele PMMS. 9<\/a><\/p>\n<p><a href=\"#_Toc184731082\">1.4.\u00a0\u00a0\u00a0\u00a0 Descrierea subproiectului 10<\/a><\/p>\n<p><a href=\"#_Toc184731083\">2.. POTEN\u021aIALE RISCURI \u0218I IMPACTURI DE MEDIU \u0218I SOCIALE.. 15<\/a><\/p>\n<ol start=\"3\">\n<li><a href=\"#_Toc184731084\"> CADRUL LEGAL \u0218I INSTITU\u021aIONAL. 17<\/a><\/li>\n<\/ol>\n<p><a href=\"#_Toc184731085\">1.1.\u00a0\u00a0\u00a0\u00a0 Cadrul Legal Na\u021bional 18<\/a><\/p>\n<p><a href=\"#_Toc184731086\">1.2.\u00a0\u00a0\u00a0\u00a0 Cerin\u021bele \u0219i Standardele B\u0103ncii Mondiale. 21<\/a><\/p>\n<p><a href=\"#_Toc184731087\">1.3.\u00a0\u00a0\u00a0\u00a0 Cadrul Institu\u021bional Na\u021bional 23<\/a><\/p>\n<p><a href=\"#_Toc184731088\">2.. M\u0102SURI DE EVITARE \u0218I MINIMIZARE A RISCURILOR \u0218I IMPACTRUILOR DE MEDIU \u0218I SOCIALE\u00a0\u00a0 23<\/a><\/p>\n<p><a href=\"#_Toc184731089\">2.1.\u00a0\u00a0\u00a0\u00a0 Recomand\u0103ri Generale Privind Impactul Asupra Mediului 23<\/a><\/p>\n<p><a href=\"#_Toc184731090\">2.2.\u00a0\u00a0\u00a0\u00a0 S\u0103n\u0103tatea \u0219i Securitatea la Locul de Munc\u0103. 25<\/a><\/p>\n<p><a href=\"#_Toc184731091\">2.3.\u00a0\u00a0\u00a0\u00a0 S\u0103n\u0103tatea \u0219i Securitatea Comunit\u0103\u021bii 25<\/a><\/p>\n<ol start=\"5\">\n<li><a href=\"#_Toc184731092\"> CADRU DE IMPLEMENTARE.. 38<\/a><\/li>\n<\/ol>\n<p><a href=\"#_Toc184731093\">5.1. Cadrul Institu\u021bional al Implement\u0103rii Subproiectului 38<\/a><\/p>\n<p><a href=\"#_Toc184731094\">5.2. Consolidarea Competen\u021belor \u0219i Instruirea personalului 40<\/a><\/p>\n<p><a href=\"#_Toc184731095\">6.. MONITORIZAREA \u0218I RAPORTAREA PMMS. 40<\/a><\/p>\n<p><a href=\"#_Toc184731096\">7.. IMPLICAREA P\u0102R\u021aILOR INTERESATE \u0218I PUBLICAREA INFORMA\u021aIILOR.. 48<\/a><\/p>\n<p><a href=\"#_Toc184731097\">7.1. Identificarea P\u0103r\u021bilor Interesate a Subproiectului 48<\/a><\/p>\n<p><a href=\"#_Toc184731098\">7.2. Implicarea P\u0103r\u021bilor Interesate a Subproiectului 49<\/a><\/p>\n<p><a href=\"#_Toc184731099\">8.. MECANISMUL DE SOLU\u021aIONARE A RECLAMA\u021aIILOR.. 50<\/a><\/p>\n<p><a href=\"#_Toc184731100\">9.. CONSULTAREA PUBLIC\u0102 \u0218I PUBLICAREA INFORMA\u021aIILOR.. 52<\/a><\/p>\n<ol start=\"10\">\n<li><a href=\"#_Toc184731101\"> ANEXE.. 53<\/a><\/li>\n<\/ol>\n<p><a href=\"#_Toc184731102\">ANEXA 1. CADRUL GENERAL \u0218I DIREC\u021aII PRIVIND PROTEC\u021aIA MEDIULUI. 54<\/a><\/p>\n<p><a href=\"#_Toc184731103\">ANEXA 2. CADRUL JURIDIC \u0218I DE REGLEMENTARE NA\u021aIONAL.. 57<\/a><\/p>\n<p><a href=\"#_Toc184731104\">ANEXA 3. GHID DE MEDIU PENTRU CONTRACTE DE LUCR\u0102RI CIVILE.. 58<\/a><\/p>\n<p><a href=\"#_Toc184731105\">ANEXA 4. CERIN\u021aE \u0218I M\u0102SURI\u00a0 DE MANIPULARE A AZBESTULUI. 59<\/a><\/p>\n<p>&nbsp;<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>ABREVIERI<\/strong><\/p>\n<table width=\"690\">\n<tbody>\n<tr>\n<td width=\"194\">MEC<\/td>\n<td width=\"496\">Ministerul Educa\u021biei \u0219i Cercet\u0103rii<\/td>\n<\/tr>\n<tr>\n<td width=\"194\">EM<\/td>\n<td width=\"496\">Evaluarea de mediu<\/td>\n<\/tr>\n<tr>\n<td width=\"194\">EIM<\/td>\n<td width=\"496\">Evaluarea impactului asupra mediului<\/td>\n<\/tr>\n<tr>\n<td width=\"194\">ESIA<\/td>\n<td width=\"496\">Evaluarea impactului social \u0219i de mediu<\/td>\n<\/tr>\n<tr>\n<td width=\"194\">CMMS<\/td>\n<td width=\"496\">Cadrul de management de mediu \u0219i social<\/td>\n<\/tr>\n<tr>\n<td width=\"194\">PMMS<\/td>\n<td width=\"496\">Plan de Management Social \u0219i de Mediu<\/td>\n<\/tr>\n<tr>\n<td width=\"194\">PAMS<\/td>\n<td width=\"496\">Planul de Angajament de Mediu \u0219i Social<\/td>\n<\/tr>\n<tr>\n<td width=\"194\">CMS<\/td>\n<td width=\"496\">Cadrul de mediu \u0219i Social<\/td>\n<\/tr>\n<tr>\n<td width=\"194\">PMMS-C<\/td>\n<td width=\"496\">Planul de Management de Mediu \u0219i Social al Constructorului<\/td>\n<\/tr>\n<tr>\n<td width=\"194\">SMS<\/td>\n<td width=\"496\">Standarde de Mediu \u0219i Social<\/td>\n<\/tr>\n<tr>\n<td width=\"194\">EMP<\/td>\n<td width=\"496\">Echipa de Management al Proiectului<\/td>\n<\/tr>\n<tr>\n<td width=\"194\">MM<\/td>\n<td width=\"496\">Ministerul Mediului<\/td>\n<\/tr>\n<tr>\n<td width=\"194\">MC<\/td>\n<td width=\"496\">Ministerul Culturii<\/td>\n<\/tr>\n<tr>\n<td width=\"194\">USM<\/td>\n<td width=\"496\">Universitatea de Sat a Moldovei<\/td>\n<\/tr>\n<tr>\n<td width=\"194\">PGM<\/td>\n<td width=\"496\">Procedura de Gestionare a For\u021bei de Munc\u0103<\/td>\n<\/tr>\n<tr>\n<td width=\"194\">SEP<\/td>\n<td width=\"496\">Planul de Implicare a P\u0103r\u021bilor Interesate<\/td>\n<\/tr>\n<tr>\n<td width=\"194\">ODP<\/td>\n<td width=\"496\">Obiectivul de Dezvoltare a Proiectului<\/td>\n<\/tr>\n<tr>\n<td width=\"194\">SSM<\/td>\n<td width=\"496\">Securitate \u0219i S\u0103n\u0103tate \u00een Munc\u0103<\/td>\n<\/tr>\n<tr>\n<td width=\"194\">UIP<\/td>\n<td width=\"496\">Unitatea de implementare a proiectului<\/td>\n<\/tr>\n<tr>\n<td width=\"194\">BM<\/td>\n<td width=\"496\">Banca Mondial\u0103<\/td>\n<\/tr>\n<tr>\n<td width=\"194\">CNC<\/td>\n<td width=\"496\">Cadrul Na\u021bional al Calific\u0103rilor<\/td>\n<\/tr>\n<tr>\n<td width=\"194\">ANACEC<\/td>\n<td width=\"496\">Agen\u021bia Na\u021bional\u0103 pentru Asigurarea Calit\u0103\u021bii \u00een Educa\u021bie \u0219i Cercetare<\/td>\n<\/tr>\n<tr>\n<td width=\"194\">EPP<\/td>\n<td width=\"496\">Echipament de protec\u021bie Personal\u0103<\/td>\n<\/tr>\n<tr>\n<td width=\"194\">GRM<\/td>\n<td width=\"496\">Mecanismul de solu\u021bionare a reclama\u021biilor<\/td>\n<\/tr>\n<tr>\n<td width=\"194\">PSSM<\/td>\n<td width=\"496\">Planul de s\u0103n\u0103tate \u0219i securitate \u00een munc\u0103<\/td>\n<\/tr>\n<tr>\n<td width=\"194\">PSU<\/td>\n<td width=\"496\">Planul pentru situa\u021bii de urgen\u021b\u0103<\/td>\n<\/tr>\n<tr>\n<td width=\"194\">MCA<\/td>\n<td width=\"496\">Materiale cu con\u021binut de azbest<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><a name=\"_Toc147737855\"><\/a><strong>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 SUMAR EXECUTIV<\/strong><\/p>\n<p><strong>Cadrul General<\/strong><\/p>\n<p>Acest plan de management social s\u0326i de mediu (PMMS) prezinta\u0306 impacturile de mediu s\u0326i sociale s\u0326i m\u0103surile de atenuare legate de <strong>Repara\u021bia capital\u0103 a<\/strong> <strong>cl\u0103dirii c\u0103minului nr.2 din mun Chi\u0219in\u0103u. str. Tighina 2, a Universit\u0103\u021bii de Stat din Moldova (USM), <\/strong>ca parte a proiectului de investi\u021bii finan\u021bat de Banca Mondiala\u0306, <strong>Proiectul \u00cenv\u0103\u021b\u0103m\u00e2ntul Superior in Moldova <\/strong>(P167790). Aceasta\u0306 investi\u021bie va implica repara\u021bia capital\u0103 \u0219i modernizarea cl\u0103dirii actuale pentru a asigura condi\u021bii de trai i\u0302mbuna\u0306ta\u0306t\u0326ite pentru studen\u021bii USM, caracteristici eficiente din punct de vedere energetic \u0219i facilita\u021bi destinate incluziunii persoanelor cu dizabilit\u0103\u021bi s\u0326i a tratamentului nediscriminatoriu fa\u021b\u0103\u0306 de femei.<\/p>\n<p>Acest PMMS are la baz\u0103 <strong>Cadrul de Management Social \u0219i de Mediu (CMSM)<\/strong> care a fost elaborat \u00een la etapa de preg\u0103tire a Proiectului \u00cenv\u0103\u021b\u0103m\u00e2ntul Superior \u00een Moldova \u0219i cuprinde analiza poten\u021bialelor riscuri \u0219i impacturi de mediu, cadrul legal na\u021bional aplicabil \u0219i standardele de mediu \u0219i sociale ale B\u0103ncii Mondiale relevante subproiectului. Totodat\u0103, include planuri de m\u0103suri de evitare \u0219i atenuare a riscurilor de mediu \u0219i sociale \u0219i de monitorizare a implement\u0103rii acestui PMMS, \u00een vederea gestion\u0103rii corespunz\u0103toare a impacturilor de mediu \u0219i sociale poten\u021biale care pot fi generate \u00een etapele de pre-construc\u021bie \u0219i construc\u021bie asupra comunit\u0103\u021bii din zona subproiectului, asupra lucr\u0103torilor implica\u021bi \u0219i\u00a0 asupra mediului.<\/p>\n<p><strong>Loca\u021bia \u0219i caracteristicile amplasamentului <\/strong><\/p>\n<p>C\u0103minul nr 2 (nr.cad.0100208.268.01) este amplasat \u00een nucleul istoric a municipiului Chi\u0219in\u0103u, strada Tighina 2, monument de importan\u021b\u0103 na\u021bional\u0103, inclus cu nr.308 \u00een Registrul monumentelor RM ocrotite de stat, aprobat prin Hot\u0103r\u00e2rea Parlamentului RM nr. 1531-XII din 22.06.1993.<\/p>\n<p>Terenul pe care este amplasat\u0103 cl\u0103direa este identificat cu nr. cadastral 0100208.268, const\u00e2nd \u00een suprafa\u021ba de 2423 mp de teren. Teritoriul este u\u0219or \u00eenclinat, f\u0103r\u0103 fenomene fizico-geologice nefavorabile, iar conform h\u0103r\u021bii de zonare seismic\u0103 a Republicii Moldova, zona este atribuit\u0103 intensit\u0103\u021bii seismice de 7 grade.<\/p>\n<p>Construc\u021bia cl\u0103dirii a fost executat\u0103 \u00een anii 50 al secolului trecut (dat\u0103 \u00een exploatare \u00een anul 1953) \u0219i utilizat\u0103 pe parcurs pentru cazarea a 180 studen\u021bi (dup\u0103 repara\u021bie pentru 172 studen\u021bi) .<\/p>\n<p><strong>Descrierea zonei \u00eenvecinate<\/strong><\/p>\n<p>C\u0103minul este situat \u00een zona reziden\u021bial\u0103, \u00een apropiere de mai multe institu\u021bii \u0219i cl\u0103diri de uz comun. Astfel, la circa 30 m spre strada Mihail Kog\u0103lniceanu, cl\u0103direa c\u0103minului s\u0103 m\u0103rgine\u0219te cu cartierul studen\u021besc (palatul sporturilor), vizavi, spre strada Pantelimon Halippa, se afl\u0103 o frizerie \u0219i o benzin\u0103rie. \u00cen partea de vest, la circa 30 m se reg\u0103se\u0219te penitenciarul 13.<\/p>\n<p><strong>\u00cencadrarea evalu\u0103rii de mediu a subproiectului<\/strong><\/p>\n<p>Proiectul a fost \u00eencadrat \u00een Categoria B aferent\u0103 evalu\u0103rii impactului asupra mediului \u0219i social\u0103 derulat\u0103 \u00een cadrul proiectelor B\u0103ncii Mondiale cu risc de mediu \u0219i social moderat. \u00cen acest caz, este necesar\u0103 realizarea unei evalu\u0103ri a impactului de mediu \u0219i preg\u0103tirea unui PMMS, pornind de la politicile \u0219i standardele de mediu \u0219i sociale (SMS), aplicabile de BM , precum \u0219i celor na\u021bionale aferente evalu\u0103rii impactului de mediu. Acest PMMS este un instrument de asistare a Antreprenorului \u00een cadrul riscurilor\/impacturilor de mediu \u0219i sociale definite \u0219i m\u0103surilor de atenuare\/adaptare specifice pentru abordarea impacturilor identificate \u00een timpul repara\u021biei capitale a cl\u0103dirii c\u0103minului. Acest PMMS va fi ata\u0219at la documenta\u021bia tehnic\u0103 \u0219i de licita\u021bie necesar\u0103 investi\u021biei.<\/p>\n<p><strong>Impacturi \u0219i riscuri de mediu identificate la nivelul subproiectului<\/strong><\/p>\n<p>Concluziile generale ale PMMS relev\u0103 posibilitatea producerii unor impacturi negative, pe termen scurt, asupra aerului, solului, apei \u0219i mediului acustic, \u00een special \u00een timpul lucr\u0103rilor de construc\u021bii civile. Aspectele legate de mediu care pot fi asociate cu activit\u0103\u021bile subproiectului includ: generarea zgomotului; impactul asupra solului \u0219i asupra apei \u00een urma scurgerilor aferente lucr\u0103rilor de renovare; perturbarea traficului \u00een timpul lucr\u0103rilor de renovare; praf \u0219i de\u0219euri rezultate \u00een timpul lucr\u0103rilor \u0219i siguran\u021ba lucr\u0103torilor. Cu toate acestea, aceste impacturi negative vor fi temporare \u0219i specifice amplasamentului\u00a0 \u0219i ar putea fi u\u0219or atenuate prin implementarea unor m\u0103suri adecvate de atenuare \u0219i prevenire a acestora.<\/p>\n<p><strong>Impacturile \u0219i riscurile sociale identificate la nivelul subproiectului<\/strong><\/p>\n<p>Evaluarea ini\u021bial\u0103 identific\u0103 un nivel redus al riscurilor sociale. Lucr\u0103rile de consolidare \u0219i modernizare nu vor implica achizi\u021bia de terenuri private sau producerea unor pierderi economice la nivelul propriet\u0103\u021bilor private din vecin\u0103tatea obiectivului de investi\u021bii.<\/p>\n<p>Subproiectul va genera, \u00een preponderen\u021b\u0103, un impact social pozitiv la nivelul comunit\u0103\u021bii prin: asigurarea unui mediu s\u0103n\u0103tos \u0219i sigur de trai pentru studen\u021bii caza\u021bi \u00een c\u0103minul Universit\u0103\u021bii.<\/p>\n<p>\u00cen ceea ce prive\u0219te posibilitatea producerii unor impacturi sociale negative, acestea sunt temporare \u0219i sunt legate de perturb\u0103ri \u0219i disconfort urmare lucr\u0103rilor de construc\u021bii la nivelul propriet\u0103\u021bilor \u0219i institu\u021biilor din vecin\u0103tatea \u0219antierului \u0219i de condi\u021biile de munc\u0103 pentru lucr\u0103torii implica\u021bi \u00een lucr\u0103ri.<\/p>\n<p>Acestea pot include: disconfortul vecinilor cauzat de poluarea temporar\u0103 datorit\u0103 prafului \u0219i nivelului de zgomot, posibile \u00eentreruperi ale utilit\u0103\u021bilor pentru propriet\u0103\u021bile \u00eenvecinate la momentul conect\u0103rii cl\u0103diri la gaz, ap\u0103, canalizare, electricitate, posibile daune la nivelul propriet\u0103\u021bilor private \u00een eventualitatea producerii unor accidente \u00een timpul lucr\u0103rilor de consolidare \u0219i modernizare; riscurile pentru s\u0103n\u0103tate \u0219i siguran\u021b\u0103 a comunit\u0103\u021bii \u0219i lucr\u0103torilor, cre\u0219terea temporar\u0103 a congestion\u0103rii traficului \u0219i a riscurilor de accidente rutiere \u00een timpul transportului de\u0219eurilor de construc\u021bii \u0219i al materialelor necesare.<\/p>\n<p>Planificarea adecvat\u0103, informarea public\u0103, consult\u0103rile cu p\u0103r\u021bile afectate, mecanismele solu\u021bionare a reclama\u021biilor \u0219i de interac\u021bionare cu p\u0103r\u021bile interesate \u0219i procedurile de monitorizare vor fi aplicate \u00een vederea evit\u0103rii \u0219i men\u021binerii poten\u021bialelor efecte la scara minim\u0103.<\/p>\n<p><strong>M\u0103suri de atenuare a efectelor asupra mediului<\/strong>.<\/p>\n<p>PMMS stipuleaz\u0103 c\u0103 toate impacturile negative asupra mediului asociate cu proiectul vor fi prevenite, eliminate sau reduse la un nivel acceptabil. Acest lucru poate fi realizat prin perfec\u021bionarea continu\u0103 \u0219i implementarea eficient\u0103 a m\u0103surilor de atenuare a efectelor asupra mediului, inclusiv prin selectarea atent\u0103 a interven\u021biilor subproiectului care ar evita sau minimiza poten\u021bialele efecte negative asupra mediului \u00eenconjur\u0103tor din zonele urbane \u00eenvecinate, inclusiv consolidarea \u0219i modernizare cl\u0103dirii \u00eentr-un mod care s\u0103 previn\u0103 pe c\u00e2t posibil t\u0103ierea arborilor, distrugerea peisajului aferent spa\u021biilor verzi de pe amplasament, poluarea aerului \u0219i a solului; asigurarea securit\u0103\u021bii muncii \u0219i a impactului asupra s\u0103n\u0103t\u0103\u021bii \u00een timpul opera\u021biunilor de sudur\u0103 etc.<\/p>\n<p><strong>M\u0103suri de atenuare social\u0103<\/strong><\/p>\n<p>PMMS include m\u0103suri de atenuare menite s\u0103 evite sau s\u0103 reduc\u0103 impactul negativ pe care implementarea subproiectului le poate avea asupra comunit\u0103\u021bii locale, din preajma \u0219antierului \u00een lucru.<\/p>\n<p>\u00cen ceea ce prive\u0219te lucr\u0103rile de consolidare \u0219i modernizare, echipele de implementare a subproiectului se vor asigura c\u0103 activit\u0103\u021bile de planificare sunt sensibile la aspectele ce \u021bin de securitatea \u0219i s\u0103n\u0103tatea \u00een munc\u0103, s\u0103n\u0103tatea \u0219i securitatea comunit\u0103\u021bii din vecin\u0103tatea \u0219antierului, exploatarea sexual\u0103 \u0219i abuz \u0219i agresiunea sexual\u0103. \u00a0\u00cen scopul identific\u0103rii \u0219i comunic\u0103rii cu posibilele persoane afectate, preg\u0103tirea investi\u021biei implic\u0103 un proces intens de consultare cu p\u0103r\u021bile interesate, organizarea de \u00eent\u00e2lniri directe cu comunitatea \u0219i lucr\u0103torii \u0219i asigurarea unui sistem func\u021bional de primire \u0219i solu\u021bionare a reclama\u021biilor venite din partea posibilelor persoane afectate.<\/p>\n<p><strong>Monitorizarea aspectelor sociale \u0219i de mediu <\/strong><\/p>\n<p>Monitorizarea aspectelor sociale \u0219i de mediu pe parcursul implement\u0103rii subproiectului va asigura un flux de informa\u021bii despre impactul social \u0219i de mediu al lucr\u0103rilor \u0219i despre eficacitatea m\u0103surilor de atenuare. Aceste informa\u021bii permit clientului \u0219i B\u0103ncii s\u0103 evalueze succesul m\u0103surilor de evitare\/reducere a impacturilor negative \u0219i permite luarea de m\u0103suri corective atunci c\u00e2nd este cazul. Sec\u021biunea de monitorizare a PMMS ofer\u0103: (a) detalii despre m\u0103surile de monitorizare, inclusiv parametrii care trebuie m\u0103sura\u021bi, metodele de utilizat, loca\u021biile de e\u0219antionare, frecven\u021ba monitoriz\u0103rii; \u0219i (b) proceduri de monitorizare \u0219i raportare care s\u0103 (i) asigure depistarea timpurie a condi\u021biilor care necesit\u0103 m\u0103suri speciale de atenuare a impacturilor \u0219i (ii) s\u0103 furnizeze informa\u021bii despre progresul \u0219i rezultatele ac\u021biunilor prev\u0103zute \u00een acest PMMS.<\/p>\n<p>Implementarea m\u0103surilor prev\u0103zute \u00een acest PMMS va fi supervizat\u0103 periodic de consultan\u021bii sociali \u0219i de mediu din cadrul Echipei de Management a Proiectului (EMP), conform graficului de monitorizare, precum \u0219i de c\u0103tre BM (\u00een timpul misiunilor sale de supervizare) \u0219i de Inspectoratul pentru Protec\u021bia Mediului. Rapoartele de progres lunare ale Contractorului \u0219i semestriale ale EMP c\u0103tre Banca Mondial\u0103 vor include informa\u021bii privind implementarea PMMS.<\/p>\n<p><strong>Cadrul institu\u021bional de implementare a PMMS-ului<\/strong><\/p>\n<p>Speciali\u0219tii de mediu \u0219i social din cadrul EMP vor fi responsabili de coordonarea \u0219i supravegherea m\u0103surilor cuprinse \u00een planurile de mediu \u0219i sociale, precum \u0219i de gestionarea riscurilor de mediu \u0219i sociale asociate. Antreprenorul va fi responsabil pentru dezvoltarea PMMS a Contractorului pe baza acestui PMMS \u0219i \u00eel va implementa.<\/p>\n<p><strong>Implicarea p\u0103r\u021bilor interesate \u0219i informarea public\u0103<\/strong><\/p>\n<p>Principalele p\u0103r\u021bi interesate de subproiectul USM sunt comunitatea studen\u021beasc\u0103 a USM \u0219i personalul care utilizeaz\u0103 complexele USM din apropiere, precum \u0219i de\u021bin\u0103torii \u0219i utilizatorii propriet\u0103\u021bilor \u00eenvecinate, precum \u0219i institu\u021biile din zon\u0103.<\/p>\n<p>Ac\u021biunile de implicare prev\u0103zute \u00een cadrul acestui PMMS includ proceduri de informare public\u0103, consult\u0103ri publice, informare prin mass media \u0219i interac\u021biune virtual\u0103 sau direct\u0103 cu p\u0103r\u021bile afectate. De asemenea, se vor organiza \u00eent\u00e2lniri directe cu lucr\u0103torii contractorului \u0219i comunitatea din zon\u0103.<\/p>\n<p><strong>Mecanismul de solu\u021bionare a peti\u021biilor\/reclama\u021biilor din cadrul proiectului<\/strong><\/p>\n<p>Se va utiliza mecanismul de solu\u021bionare a reclama\u021biilor \u0219i de interac\u021bionare cu p\u0103r\u021bile interesate existent \u00een cadrul proiectului, care se implementeaz\u0103 la nivel de proiect \u0219i subproiect. Toate sugestii \u0219i reclama\u021biile pot fi depuse la nivel de proiect <a href=\"https:\/\/www.mec.gov.md\/ro\/content\/proiecte-0\">https:\/\/www.mec.gov.md\/ro\/content\/proiecte-0<\/a> \u0219i la nivel de subproiect\u00a0 <a href=\"https:\/\/new80.usm.md\/?page_id=26463\">https:\/\/new80.usm.md\/?page_id=26463<\/a>. Detalii privind acest mecanism \u0219i datele de contact ale contractorului vor fi plasate adi\u021bional pe paginile web ale subproiectului \u0219i pe panoul informativ care urmeaz\u0103 a fi instalat pe \u0219antier. Reclama\u021biile pot fi depuse anonim \u00een cutia de sugestii acre va fi instalat\u0103 pe \u0219antier \u0219i la num\u0103rul de telefon +373068055297.<\/p>\n<p><strong>Informarea \u0219i consultarea public\u0103 privind Managementul de mediu \u0219i social<\/strong> (<strong>MMS<\/strong>)<\/p>\n<p>Aspectele de mediu \u0219i sociale ce \u021bin de Managementul de mediu \u0219i social, Standardele de mediu \u0219i social (SMS), precum posibilele riscuri \u0219i impasturi de mediu \u0219i de ordin socal au fost abordate \u00een cadrul Consultarilor\u00a0 Publice organizate la etapa de lansare SP a P\u00ceSM, care s-au desf\u0103\u0219urat la data de 22.02.2023 \u0219i au participat 44 persoane. Concomitent s-a vorbit despre CMMS, LMP, SEP \u0219i PAMS, ca parte componente\u00a0 a MMS.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<ol>\n<li><a name=\"_Toc147737856\"><\/a><a name=\"_Toc184731078\"><\/a><strong> INTRODUCERE \u0218I CONTEXT<\/strong>\n<ul>\n<li><a name=\"_Toc184731079\"><\/a><a name=\"_Toc147737857\"><\/a><strong>I<\/strong><strong>ntroducere<\/strong><\/li>\n<\/ul>\n<\/li>\n<\/ol>\n<p>Proiectul \u00cenv\u0103\u021b\u0103m\u00e2ntul Superior din Moldova (P\u00ceSM), finan\u021bat de Banca Mondial\u0103 (P167790), a fost preg\u0103tit \u00een anul 2019, c\u00e2nd a fost elaborate \u0219i documentele cadru de mediu \u0219i sociale, care includ Cadrul de Management de Mediu \u0219i Social (CMMS), Procedura de gestionare a for\u021bei de munc\u0103 (PGM) \u0219i Planul de implicare a p\u0103r\u021bilor interesate (eng. SEP). La acea etap\u0103 P\u00ceSM include activit\u0103\u021bi cu impact minor de mediu \u0219i social, \u00een mod specific renov\u0103ri minore, pentru care s-a aplicat Lista de screening de mediu \u0219i social\u0103 \u00een vederea identific\u0103rii riscurilor \u0219i gestion\u0103rii corespunz\u0103toare a acestora.<\/p>\n<p>\u00cen anul 2024, au fost ini\u021biat procesul de restructurare a Proiectului, urmare evalu\u0103rii de mijloc de termen , prin includerea unei noi componente ce \u021bine de interna\u021bionalizarea \u00eenv\u0103\u021b\u0103m\u00e2ntului superior, care include de asemenea renovarea c\u0103minelor pentru a oferi spa\u021biu de locuit confortabil studen\u021bilor interna\u021bionali. Au fost selectate dou\u0103 c\u0103mine a dou\u0103 universit\u0103\u021bi a c\u0103ror lucr\u0103ri de renovare capital\u0103 vor fi finan\u021bate din P\u00ceSM.<\/p>\n<p>\u00cen acest context, prezentul Plan de Management de Mediu \u0219i Social (PMMS) specific amplasamentului s-a elaborat \u0219i prezint\u0103 impactul social \u0219i de mediu \u0219i m\u0103surile aferente de reducere a riscurilor generate de repara\u021bia capital\u0103 a cl\u0103dirii c\u0103minului nr.2 a Universit\u0103\u021bii de Stat din Moldova (USM), din municipiul Chi\u0219in\u0103u, din str. Tighina 2.<\/p>\n<ul>\n<li><a name=\"_Toc184731080\"><\/a><strong>Descrierea General\u0103 a Proiectului<\/strong><\/li>\n<\/ul>\n<p><strong><u>Obiectivul de dezvoltare al proiectului (ODP) este de a \u00eembun\u0103t\u0103\u021bi orientarea c\u0103tre pia\u021ba muncii, interna\u021bionalizarea, cercetarea \u0219tiin\u021bific\u0103 \u0219i transferul de tehnologie \u00een \u00eenv\u0103\u021b\u0103m\u00e2ntul superior.<\/u><\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>Componenta 1 \u2013 \u00cembun\u0103t\u0103\u021birea Mecanismelor de Asigurare a Calit\u0103\u021bii. <\/strong>Aceast\u0103 component\u0103 urm\u0103re\u0219te \u00eembun\u0103t\u0103\u021birea mecanismului de asigurare a calit\u0103\u021bii sistemului de \u00eenv\u0103\u021b\u0103m\u00e2nt superior din Moldova, ceea ce ar contribui \u0219i la \u00eembun\u0103t\u0103\u021birea orient\u0103rii acestuia pe pia\u021ba muncii.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>Componenta 2 \u2013 \u00cembun\u0103t\u0103\u021birea orient\u0103rii pie\u021bei muncii \u0219i cercetare \u0219i inovare<\/strong><strong>. <\/strong>Aceast\u0103 component\u0103 ar finan\u021ba proiectarea \u0219i implementarea unui program bazat pe institu\u021bii \u0219i nevoi (Programul de \u00eembun\u0103t\u0103\u021bire a \u00eenv\u0103\u021b\u0103m\u00e2ntului superior &#8211; P\u00ce\u00ceSM<a href=\"#_ftn1\" name=\"_ftnref1\"><sup>[1]<\/sup><\/a>) a avut ca scop \u00eembun\u0103t\u0103\u021birea orient\u0103rii c\u0103tre pia\u021ba muncii a institu\u021biilor de \u00eenv\u0103\u021b\u0103m\u00e2nt superior din Moldova.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Componenta 3 \u2013 <\/strong><strong>Managementul proiectelor, coordonarea reformelor \u0219i monitorizarea \u0219i evaluarea (finan\u021bare suplimentar\u0103).<\/strong> Obiectivul componentei este stabilirea unui mecanism institu\u021bional sustenabil pentru coordonarea strategic\u0103 a reformelor \u00een sectorul \u00eenv\u0103\u021b\u0103m\u00e2ntului superior \u0219i managementul eficient al proiectelor.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Componenta 4 \u2013 Interna\u021bionalizarea \u00eenv\u0103\u021b\u0103m\u00e2ntului superior. <\/strong>Aceast\u0103 component\u0103 extinde componenta de proiect existent\u0103 ad\u0103ugat\u0103 prin prima restructurare a Proiectului, care urm\u0103re\u0219te (i) cre\u0219terea num\u0103rului de studen\u021bi interna\u021bionali \u00een programele selectate, care vor fi adapta\u021bi \u0219i comercializa\u021bi pentru interna\u021bionalizare, (ii) crearea unui brand interna\u021bional pentru studiile superioare moldovene\u0219ti, pentru a face ofertele atractive \u0219i consolidarea birourilor interna\u021bionale la nivel universitar, (iii) interna\u021bionalizarea mediului de predare prin calificarea personalului didactic \u0219i nedidactic \u00een limba englez\u0103 \u0219i (iv) renovarea c\u0103minelor pentru a oferi spa\u021biu de locuit confortabil studen\u021bilor interna\u021bionali.<\/p>\n<p>&nbsp;<\/p>\n<p><em>O Subcomponenta important\u0103 este 4.2. privind \u00cembun\u0103t\u0103\u021birea experien\u021bei de via\u021b\u0103 a studen\u021bilor la campus. <\/em>Implementarea acestei subcomponente este \u00een responsabilitatea universit\u0103\u021bilor. MEC va selecta maximum dou\u0103 c\u0103mine pentru studen\u021bi pe criterii obiective dintre universit\u0103\u021bile \u0219i colegiile care implementeaz\u0103 deja subproiectele finan\u021bate prin proiect pentru \u00eembun\u0103t\u0103\u021birea calit\u0103\u021bii \u0219i relevan\u021bei programelor lor de renovare \u0219i renovare a c\u0103minelor. Natura lucr\u0103rilor de renovare este de a\u0219teptat s\u0103 fie executat\u0103 minor, f\u0103r\u0103 a implica modific\u0103ri structurale majore ale cl\u0103dirilor existente.<\/p>\n<p>MEC, \u00een colaborare cu universit\u0103\u021bile selectate, vor angaja consultan\u021bi pentru a le sprijini \u00een realizarea evalu\u0103rii instala\u021biilor, preg\u0103tirea schi\u021belor, proiectelor \u0219i calculelor cantit\u0103\u021bilor. Pe baza acestor documente, Universit\u0103\u021bile vor preg\u0103ti documentele de licita\u021bie. Evaluarea ofertelor \u0219i atribuirea contractelor vor fi, de asemenea, gestionate de Universit\u0103\u021bile\/Colegiile, cu suport tehnic din partea MEC. Universit\u0103\u021bile vor fi responsabile de gestionarea \u0219i monitorizarea implement\u0103rii contractelor. \u00cen cazul \u00een care lucr\u0103rile r\u0103m\u00e2n incomplete, MEC va finan\u021ba lucr\u0103rile r\u0103mase din alte resurse. Subcomponenta va finan\u021ba toate lucr\u0103rile, bunurile \u0219i serviciile necesare pentru planificarea, execu\u021bia \u0219i monitorizarea activit\u0103\u021bilor de renovare. Renovarea \u0219i reamenajarea c\u0103minelor selectate pentru studen\u021bi va fi efectuat\u0103 \u00een conformitate cu codurile de renovare \u0219i legile \u00een vigoare din Republica Moldova \u0219i vor \u00eencorpora \u00een mod adecvat accesibilitatea universal\u0103, siguran\u021b\u0103, considera\u021bii de gen \u0219i cerin\u021be de eficien\u021b\u0103 energetic\u0103. Lucr\u0103rile vor fi conforme cu ESMF al proiectului.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Componenta 5: Componenta de r\u0103spuns la situa\u021bii de urgen\u021b\u0103 (CERC)<\/strong>. Aceast\u0103 component\u0103 este inclus\u0103 \u00een conformitate cu Politica IPF a B\u0103ncii Mondiale, r\u0103spuns de urgen\u021b\u0103 contingent prin furnizarea unui r\u0103spuns imediat la o criz\u0103 sau o urgen\u021b\u0103 eligibil\u0103, dup\u0103 cum este necesar.<\/p>\n<ul>\n<li><a name=\"_Toc184731081\"><\/a><strong>Scopul \u0219i Obiectivele PMMS<\/strong><\/li>\n<\/ul>\n<p>P\u00ceSM se implementeaz\u0103 \u00een conformitate cu legisla\u021bia na\u021bional\u0103 \u0219i standardele de mediu \u0219i sociale ale b\u0103ncii Mondiale, a\u0219a cum este precizat \u00een Planul de Angajament de Mediu \u0219i Social (PAMS) \u0219i \u00een CMMS.<\/p>\n<p>Respectiv, toate subproiectele finan\u021bate \u00een cadrul P\u00ceSM, sunt supuse conformit\u0103\u021bii at\u00e2t cu cerin\u021bele \u0219i regulamentele aplicative la nivel na\u021bional, c\u00e2t \u0219i cu cerin\u021bele \u0219i standardele B\u0103ncii Mondiale, \u00een baza contractelor de grant semnate \u00eentre MEC \u0219i universit\u0103\u021bile selectate.<\/p>\n<p>Lucr\u0103rile de renovare planificate ale c\u0103minului nr. 2 al USM, care includ renovarea capital\u0103 a cl\u0103dirii, \u00een vederea \u00eembun\u0103t\u0103\u021bii eficien\u021bei energetice a cl\u0103dirii (repara\u021bii interioare, \u00eenlocuire u\u0219i \u0219i ferestre, repara\u021bie acoperi\u0219, replanific\u0103ri interioare, lucr\u0103ri exterioare la fa\u021bad\u0103 etc.), oferirii accesului universal utilizatorilor, amenajarea spa\u021biului adiacent, necesit\u0103 m\u0103suri de evitare \u0219i minimizare specifice lucr\u0103rilor planificate \u0219i reie\u0219ind din amplasarea obiectivului. <strong>Se cunoa\u0219te c\u0103 la momentul desf\u0103\u0219ur\u0103rii lucr\u0103rilor de renovare nu se vor afla studen\u021bi \u00een cl\u0103dire sau \u00een apropiere.<\/strong><\/p>\n<p>Astfel, acest PMMS descrie cerin\u021bele legale na\u021bionale \u0219i cerin\u021bele B\u0103ncii Mondiale aplicabile subproiectului, \u00een baza acestora propune m\u0103suri specifice care urmeaz\u0103 a fi implementate \u00een etapele de preg\u0103tire a \u0219antierului \u0219i de renovare, inclusiv m\u0103suri de monitorizare a implement\u0103rii ac\u021biunilor propuse.\u00a0 \u00cen mod specific, PMMS include m\u0103suri propuse de minimizare a riscurilor \u0219i impacturilor asupra mediului, asupra lucr\u0103torilor implica\u021bi \u00een lucr\u0103rile de renovare \u0219i asupra comunit\u0103\u021bii din apropierea \u0219antierului planificat.<\/p>\n<p>Obiectivele specifice ale acestui document includ urm\u0103toarele:<\/p>\n<ol>\n<li>Identificarea problemelor\/riscurilor de mediu \u0219i sociale asociate cu condi\u021biile existente;<\/li>\n<li>Elaborarea unui plan pentru atenuarea riscurilor de mediu \u0219i sociale asociate cu lucr\u0103rile de renovare capital\u0103 \u0219i operare a c\u0103minului, consultarea acestuia cu institu\u021biile publice \u0219i guvernamentale relevante precum \u0219i cu toate p\u0103r\u021bile interesate ce vor fi afectate;<\/li>\n<li>Identificarea m\u0103surilor fezabile \u0219i eficiente din punct de vedere al costurilor care pot reduce impactul negativ asupra mediului \u0219i comunit\u0103\u021bii la niveluri acceptabile;<\/li>\n<li>Identificarea obiectivelor de monitorizare \u0219i specificarea metodelor de monitorizare, raportate la impacturile evaluate \u0219i la m\u0103surile de atenuare men\u021bionate mai sus;<\/li>\n<li>Descrierea aranjamentelor institu\u021bionale: institu\u021biile responsabile de efectuarea m\u0103surilor de atenuare \u0219i monitorizare (de ex. pentru operarea, supravegherea, executarea, monitorizarea implement\u0103rii \u0219i a ac\u021biunilor de remediere, raportarea \u0219i formarea personalului) \u0219i a aranjamentelor contractuale pentru asigurarea performan\u021bei fiec\u0103rei entit\u0103\u021bi implicate \u00een implementare;\n<ul>\n<li><a name=\"_Toc184731082\"><\/a><strong>Descrierea subproiectului<\/strong><\/li>\n<\/ul>\n<\/li>\n<\/ol>\n<p><strong><em>Denumire subproiect:<\/em><\/strong> Repara\u021bia capital\u0103 a c\u0103minului nr.2 (nr. cadastral 0100208.268.01) pe terenul cu nr. cadastral 0100208.268, mun. Chi\u0219in\u0103u, str. Tighina nr. 2.<\/p>\n<p><strong><em>USM:<\/em><\/strong> Universitatea de Stat din Moldova (USM)<\/p>\n<p><strong><em>Loca\u021bie \u0219i date generale despre cl\u0103dire:<\/em><\/strong> Amplasamentul este situat pe str. Tighina 2, mun. Chi\u0219in\u0103u, Republica Moldova. Accesul principal \u00een incinta se va realiza din zona de Vest (str. Alexandru Bernardazzi).<\/p>\n<p>&nbsp;<\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"387\"><\/td>\n<td width=\"303\">&nbsp;<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<table width=\"100%\">\n<tbody>\n<tr>\n<td><strong>Suprafa\u021ba terenului care urmeaz\u0103 a fi amenajat: 1275 m.p.<\/strong><\/p>\n<p><strong>Suprafa\u021b\u0103 cu construc\u021bii: 935 m.p.<\/strong><\/p>\n<p><strong>Suprafa\u021ba total\u0103 a subproiectului: 2423 m.p.<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Cl\u0103direa este cu 4 nivele (S\/par\u021bial+P+2E); cu un volum de renovare de 10382 m3. Suprafa\u021ba util\u0103 existent\u0103 -2423.1 m2.<\/p>\n<p>Construc\u021bia cl\u0103dirii a fost executat\u0103 \u00een anii 50 al secolului trecut (dat\u0103 \u00een exploatare \u00een anul 1953) \u0219i utilizat\u0103 pe parcurs pentru cazarea a 180 studen\u021bi (dup\u0103 repara\u021bie pentru 172 studen\u021bi) .<\/p>\n<p>Expertiza tehnic\u0103 a constatat c\u0103 starea tehnic\u0103 a elementelor de renovare, din limita volumului de baz\u0103, se caracterizeaz\u0103 prin defectele ap\u0103rute din lipsa lucr\u0103rilor \u0219i m\u0103surilor\u00a0 de \u00eentre\u021binere, totodat\u0103 de la ac\u021biunile climaterice, condi\u021biilor de exploatare \u0219i uzur\u0103 \u00een timp a materialelor.<\/p>\n<p>Lucr\u0103rile planificate includ lucr\u0103ri de demontare a ferestrelor \u0219i u\u0219ilor vechi, a acoperi\u0219ului, replanificarea camerelor prin demolarea \u0219i construc\u021bia unor noi pere\u021bi interiori, lucr\u0103ri de finisaje interioare \u0219i exterioare, instalarea u\u0219ilor, ferestrelor \u0219i acoperi\u0219ului noi. De asemenea, vor fi instalate sisteme interne noi de aprovizionare cu energie electric\u0103 \u0219i termic\u0103 \u0219i de aprovizionare cu ap\u0103 \u0219i canalizare.<\/p>\n<p>Lucr\u0103rile de renovare vor asigura condi\u021bii optime de trai pentru studen\u021bii caza\u021bi \u00een c\u0103min \u0219i personalului auxiliar \u0219i de mentenan\u021b\u0103 a cl\u0103dirii, vor fi create condi\u021bii de acces pentru persoanele cu dezabilit\u0103\u021bi, prin construc\u021bia unei rampe de acces \u00een cl\u0103dire.<\/p>\n<p>Lucr\u0103rile se vor executa \u00een stric\u0103 dependen\u021b\u0103 \u0219i \u00een conformitate cu documenta\u021bia de proiect a lucr\u0103rilor de repara\u021bie capital\u0103 a c\u0103minului elaborat\u0103, coordonat\u0103 \u0219i avizat\u0103 cu autorit\u0103\u021bile respective de specialitate \u00een condi\u021biile legisla\u021biei na\u021bionale \u0219i cerin\u021belor BM.<\/p>\n<p>\u00cen plus, cl\u0103direa va corespunde celor mai noi cerin\u021be de eficien\u021b\u0103 energetic\u0103 \u0219i va fi dotat\u0103 conform standardelor \u00eenalte de trai ( blocuri sanitare, buc\u0103t\u0103rie, sp\u0103l\u0103torie, mobilier) pentru personalul de deservire \u0219i studen\u021bii caza\u021bi \u00een c\u0103min.\u00a0 Av\u00e2nd \u00een vedere c\u0103 cl\u0103direa este un monument arhitectural, proiectul tehnic a fost coordonat cu Ministerul Culturii. Drept urmare. Supraveghetorii tehnici \u0219i inginerul civil din cadrul EMP vor monitoriza asigurarea respect\u0103rii proiectului \u0219i p\u0103strarea valorii culturale \u0219i arhitecturale a cl\u0103dirii.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<table width=\"100%\">\n<tbody>\n<tr>\n<td><strong>Conform Planului urbanistic general al ora\u0219ului Chi\u0219in\u0103u, imobilul este amplasat \u00een nucleul istoric a Chi\u0219in\u0103ului, monument de importan\u021b\u0103 na\u021bional\u0103, inclus cu nr.308 Chi\u0219in\u0103u \u00een Registrul monumentelor Republicii Moldova ocrotite de stat.<\/strong> <strong>Astfel lucr\u0103rile de renovare se vor desf\u0103\u0219ura prin aplicarea solu\u021biilor arhitectural -planimetrice ale cl\u0103dirii conform destina\u021biei func\u021bionale, prelungirea durabilit\u0103\u021bii construc\u021biei conform cerin\u021belor Consiliului Na\u021bional al Monumentelor Istorice <u>(Proces verbal nr. 04 din 27.03.2024)<\/u><\/strong><\/p>\n<p>&nbsp;<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Lucr\u0103rile de repara\u021bie capital\u0103 vor necesita amplasarea de instala\u021bii temporare pe \u0219antier. Instalarea acestor facilit\u0103\u021bi va permite realizarea diverselor func\u021bii ale \u0219antierului, inclusiv depozitarea materialelor de renovare, amenajarea loca\u021biei \u0219i asigurarea s\u0103n\u0103t\u0103\u021bii \u0219i securit\u0103\u021bii pe \u0219antier. Vor fi instalate dou\u0103 toalete ecologice, iar con\u021binutul acestora va fi golit \u00een mod constant de c\u0103tre furnizor. Documenta\u021bia tehnic\u0103 de proiectare include toate standardele \u0219i cerin\u021bele aplicabile contractorului pentru a asigura s\u0103n\u0103tatea \u0219i securitatea \u00een munc\u0103 la fa\u021ba locului, incluz\u00e2nd sesiuni de instruire, furnizarea de echipamente de protec\u021bie, identificarea riscurilor de accidente \u0219i a m\u0103surilor de atenuare, \u00eemp\u0103r\u021birea clar\u0103 a sarcinilor de lucru la fa\u021ba locului, etc. Amenajarea tuturor facilit\u0103\u021bilor necesare pe \u0219antier vor fi agreate cu Contractorul responsabil de lucr\u0103ri dup\u0103 semnarea contractului. Contractorul va include in PMMS al Contractorului detaliile privind amplasare facilit\u0103\u021bilor necesare pentru asigurarea condi\u021biilor de munc\u0103 a lucr\u0103torilor \u0219i respectarea cerin\u021belor de s\u0103n\u0103tate \u0219i siguran\u021b\u0103.<\/p>\n<p>La intrarea pe amplasament va fi instalat un panou dedicat mecanismului de primire a peti\u021biilor\/reclama\u021biilor cu o cutie po\u0219tal\u0103 aferent\u0103, iar lucr\u0103torii vor fi informa\u021bi cu privire la posibilitatea de a contacta unitatea de implementare sau de a depune o reclama\u021bie anonim\u0103 \u00een leg\u0103tur\u0103 cu condi\u021biile de munc\u0103 \u0219i cu prevederile de s\u0103n\u0103tate \u0219i siguran\u021b\u0103 la fa\u021ba locului.<\/p>\n<p>Facilit\u0103\u021bile temporare necesare \u00een timpul lucr\u0103rilor de construire vor lua \u00een calcul desemnarea de spa\u021bii destinate depozit\u0103rii de materiale, garduri \u0219i puncte de control pentru asigurarea accesului controlat pe amplasament, puncte de control a contamin\u0103rii, toalete ecologice, servicii de epurare a apelor uzate\u00a0 \u0219i iluminat pe timp de noapte.<\/p>\n<p><strong><em>Amplasare fa\u021b\u0103 de alte obiective din zon\u0103: <\/em><\/strong>Cl\u0103direa c\u0103minului \u0219i terenul adiacent este amplasat \u00eentr-o zon\u0103 aglomerat\u0103, \u00een zona centru a ora\u0219ului Chi\u0219in\u0103u, vizavi de o strad\u0103 principal\u0103 din Chi\u0219in\u0103u (strada Ismail), care \u00eencepe de la intersec\u021bia cu str. Alexandru Bernardazzi, intersect\u00e2nd alte 14 artere, cu flux major de transport spre mai multe sectoare ale ora\u0219ului (<em>cu ro\u0219u este marcat c\u0103minul, cu albastru strada Ismail<\/em>).<\/p>\n<p>&nbsp;<\/p>\n<p>De asemenea, \u00een apropierea cl\u0103dirii c\u0103minului, se afla complexul sportiv al USM, care include un bazin de \u00eenot deschis (suprafa\u021ba total\u0103 a complexului sportiv constituie 2346 m2, fapt care permite organizarea nu doar a orelor de educa\u021bie fizic\u0103, dar \u0219i a multiplelor activit\u0103\u021bi sportive na\u021bionale \u0219i interna\u021bionale) \u0219i Casa de Cultur\u0103 a USM care are ca obiect de activitate organizarea \u0219i desf\u0103\u0219urarea ac\u021biunilor cultural-artistice, educative, de informare \u0219i de divertisment, precum \u0219i alte servicii pentru studen\u021bi (<em>obiective marcate cu ro\u0219u \u00een scrennprintul de mai jos<\/em>).<\/p>\n<p>De asemenea, \u00een regiune dintre strada Alexandru Bernardazzi \u0219i strada Ismail sunt amplasate mici afaceri care \u00ee\u0219i desf\u0103\u0219oar\u0103 activitatea la moment, printre care \u0219i o benzin\u0103rie (<em>c\u0103minul este marcat cu ro\u0219u, afacerile sunt marcate mai jos cu albastru). <\/em>Se vor utiliza c\u0103ile de acces pentru transportarea materialelor \u0219i echipamentelor din curtea cl\u0103dirii, \u00een orele c\u00e2nd traficul e mai pu\u021bin aglomerat (diminea\u021ba devreme sau seara t\u00e2rziu). Planul de trafic privind transportul materialelor \u0219i echipamentelor va fi discutat \u0219i agreat cu Contractorul p\u00e2n\u0103 la ini\u021bierea lucr\u0103rilor de construc\u021bie.<\/p>\n<p>&nbsp;<\/p>\n<ol start=\"2\">\n<li><a name=\"_Toc184731083\"><\/a> <strong>POTEN\u021aIALE RISCURI \u0218I IMPACTURI DE MEDIU \u0218I SOCIALE<\/strong><\/li>\n<\/ol>\n<p>Aceast\u0103 sec\u021biune include identificarea poten\u021bialelor riscuri \u0219i impacturi de mediu \u0219i sociale reie\u0219ind din specificul lucr\u0103rilor necesare, descrierea \u0219i amplasarea obiectivului.<\/p>\n<ul>\n<li><a name=\"_Toc147737870\"><\/a><strong>Impacturi \u0219i Riscuri de Mediu<\/strong><\/li>\n<\/ul>\n<p>Analiza impactului asupra mediului implic\u0103 faptul c\u0103 se a\u0219teapt\u0103 s\u0103 aib\u0103 un impact pozitiv net asupra mediului prin reducerea riscului de deteriorare \u0219i pr\u0103bu\u0219ire a cl\u0103dirii ca urmare a cutremurelor.<\/p>\n<p>Poten\u021bialele efectele adverse, generate la implementarea subproiectului, vor avea un caracter limitat \u0219i temporar, fiind preponderent corelate cu lucr\u0103rile de construc\u021bii \u0219i includ:<\/p>\n<ul>\n<li>cre\u0219terea polu\u0103rii datorit\u0103 gener\u0103rii de\u0219eurilor din lucr\u0103rile de repara\u021bie capital\u0103<\/li>\n<li>cre\u0219terea nivelului de zgomot \u0219i emisii \u00een aer, \u00een special praf, \u00een timpul lucr\u0103rilor de repara\u021bie capital\u0103 (demol\u0103ri)<\/li>\n<li>generarea de emisii \u00een aer \u0219i praf, zgomot \u0219i vibra\u021bii din cauza deplas\u0103rii vehiculelor \u0219i utilajelor pentru construc\u021bii;<\/li>\n<\/ul>\n<p>Riscurile identificate sunt:<\/p>\n<ul>\n<li>riscuri de poluare a apei, a solului \u0219i a subsolului ca urmare a elimin\u0103rii necorespunz\u0103toare a de\u0219eurilor de renovare, a azbestului \u0219i a materialelor care con\u021bin azbest sau a scurgerilor opera\u021bionale minore sau accidentale de combustibil \u0219i lubrifian\u021bi de la utilajele de renovare;<\/li>\n<li>cre\u0219terea traficului \u00een timpul renovarei, care ar putea avea un impact asupra comunit\u0103\u021bii;<\/li>\n<li>impactul asupra s\u0103n\u0103t\u0103\u021bii \u0219i siguran\u021bei lucr\u0103torilor \u0219i a comunit\u0103\u021bii \u00een timpul activit\u0103\u021bilor de renovare;<\/li>\n<li>refacerea necorespunz\u0103toare a \u0219antierelor dup\u0103 finalizarea lucr\u0103rilor<\/li>\n<li>practici necorespunz\u0103toare \u00een timpul exploat\u0103rii cl\u0103dirii<\/li>\n<li>t\u0103ierea copacilor \u0219i a altor tipuri de vegeta\u021bie local\u0103.<\/li>\n<\/ul>\n<p>Riscurile enumerate mai sus sunt anticipate anterior implement\u0103rii proiectului, iar m\u0103surile de atenuare vor fi proiectate, implementate, monitorizate \u0219i evaluate \u00een timpul proiect\u0103rii, renov\u0103rii \u0219i func\u021bion\u0103rii \u00een concordan\u021b\u0103 cu legisla\u021bia na\u021bional\u0103, cu standardele B\u0103ncii Mondiale \u0219i cu bunele practici interna\u021bionale.<\/p>\n<p>Nu este permis\u0103 utilizarea de materiale de renovare care sunt periculoase pentru s\u0103n\u0103tatea uman\u0103. Posibilele de\u0219euri din materiale cu con\u021binut de azbest vor fi colectate, transportate \u0219i eliminate prin respectarea unor m\u0103suri speciale de protec\u021bie \u00een conformitate cu standardele de manipulare a de\u0219eurilor periculoase.<\/p>\n<ul>\n<li><strong>Impacturi \u0219i Riscuri Sociale<\/strong><\/li>\n<\/ul>\n<p>Analiza impactului social implic\u0103 beneficiile \u0219i riscurile la nivelul comunit\u0103\u021bii locale, a personalului angajat la lucr\u0103rile de repara\u021bie capital\u0103 a c\u0103minului, a propriet\u0103\u021bilor, institu\u021biilor \u0219i persoanelor \u00eenvecinate.<\/p>\n<p>Se a\u0219teapt\u0103 ca proiectul s\u0103 aib\u0103 un impact social pozitiv la nivelul comunit\u0103\u021bii prin:<\/p>\n<ul>\n<li>Asigurarea unui mediu sigur \u0219i s\u0103n\u0103tos pentru viitorii studen\u021bi caza\u021bi \u00een c\u0103min.<\/li>\n<li>Reducerea riscurilor de pr\u0103bu\u0219ire \u0219i de accidente umane \u00een caz de cutremur, asigur\u00e2nd astfel servicii de urgen\u021b\u0103 pentru comunitate \u00eentr-o astfel de situa\u021bie;<\/li>\n<li>Contribu\u021bia la procesul de adaptare la schimb\u0103rile climatice, prin reducerea presiunii asupra resurselor naturale \u0219i crearea unui exemplu de bune practici \u00een ceea ce prive\u0219te cl\u0103dirile publice eficiente din punct de vedere energetic;<\/li>\n<li>Asigurarea egalit\u0103\u021bii de gen \u0219i a accesului universal \u00een facilit\u0103\u021bile nou construite, promov\u00e2nd tratamentul egal al tuturor membrilor actuali \u0219i viitori ai personalului \u0219i studen\u021bi caza\u021bi \u00een c\u0103min.<\/li>\n<\/ul>\n<p>\u00cen ceea ce prive\u0219te poten\u021bialele efecte negative \u0219i riscuri identificate \u00een procesul de efectuare a lucr\u0103rilor de repara\u021bie capital\u0103, putem men\u021biona urm\u0103toarele:<\/p>\n<p><strong>Relocare involuntar\u0103 \u0219i achizi\u021bionare de teren:<\/strong> Nu este necesar de achizi\u021bionat teren adi\u021bional. Lucr\u0103rile se vor desf\u0103\u0219ura pe terenul proprietatea USM. Studen\u021bii (circa 180 la num\u0103r) nu se vor fi caza\u021bi \u00een cl\u0103direa supus\u0103 lucr\u0103rilor. Studen\u021bii vor fi distribui\u021bi \u00een alte c\u0103mine din proprietatea USM.<\/p>\n<p><strong>S\u0103n\u0103tate \u0219i securitatea comunit\u0103\u021bii:<\/strong> Pe durata lucr\u0103rilor de renovare exist\u0103 risc minor de asupra s\u0103n\u0103t\u0103\u021bii \u0219i securit\u0103\u021bii studen\u021bilor care viziteaz\u0103 complexul sportiv sau complexul cultural din apropiere \u0219i asupra lucr\u0103torilor \u0219i vizitatorilor micilor faceri din zon\u0103. Astfel, respectarea tuturor cerin\u021belor privind s\u0103n\u0103tatea \u0219i securitatea este obligatorie.<\/p>\n<p><strong>S\u0103n\u0103tatea \u0219i securitatea lucr\u0103torilor:<\/strong> Pot exista riscuri ce \u021bin de s\u0103n\u0103tatea \u0219i securitatea ocupa\u021bional\u0103 \u00een lipsa aplic\u0103rii echipamentelor \u0219i m\u0103surilor de precau\u021bie \u00een dependen\u021b\u0103 de lucr\u0103rile \u00een care sunt implica\u021bi echipamentul utilizat. Astfel, contractorul va asigura \u0219i supraveghetorii tehnici vor monitoriza ca to\u021bi lucr\u0103torii s\u0103 utilizeze echipamente de protec\u021bie \u0219i s\u0103 aplice m\u0103surile necesare pe durata desf\u0103\u0219ur\u0103rii lucr\u0103rilor, inclusiv \u00een utilizarea ma\u0219in\u0103riilor sau utilajelor. Se va elabora \u0219i propune lucr\u0103torilor un plan pentru cazurile de urgen\u021b\u0103, care va include asigurarea m\u0103surilor necesare pentru primul ajutor pe \u0219antier, modul de adresare institu\u021biilor medicale, informarea imediat\u0103 a institu\u021biilor ide stat responsabile \u0219i a echipei universit\u0103\u021bii \u0219i EMP. Banca Mondial\u0103 va fi informat\u0103 despre cazurile de urgen\u021b\u0103 ap\u0103rute \u0219i despre planul de m\u0103suri propus \u00een numai mai mult dec\u00e2t de 48 ore de la ora incidentului.<\/p>\n<p><strong>Disconfort:<\/strong> Pe durata lucr\u0103rilor de renovare ar putea fie creat un disconfort din cauza zgomotului, prafului \u0219i aglomera\u021biei. Restric\u021bii de acces. Poten\u021biale \u00eentreruperi de utilit\u0103\u021bi pentru propriet\u0103\u021bile \u00eenvecinate, \u00een momentul racord\u0103rii cl\u0103dirii la gaz, ap\u0103, canalizare, electricitate.<\/p>\n<p><strong>Transportul de materiale, echipamente \u0219i de\u0219euri:<\/strong> Cre\u0219terea temporar\u0103 a congestion\u0103rii traficului \u0219i a riscului de accidente rutiere \u00een timpul transportului de\u0219eurilor \u0219i al materialelor de renovare. Contractorul va delega persoane pentru direc\u021bionarea \u0219i gestionarea transportului c\u00e2nd va fi necesar pentru a evita eventualele congestion\u0103ri sau re\u021bineri \u00een trafic.<\/p>\n<p><strong>Conflict dintre lucr\u0103tori \u0219i persoanele care locuiesc sau lucreaz\u0103 \u00een apropierea \u0219antierului: <\/strong>Lucr\u0103torii ar putea s\u0103 nu respecte regulile agreate de organizare a \u0219antierului \u0219i coordonare a activit\u0103\u021bilor cu institu\u021biile \u0219i persoanele din vecin\u0103tate. Totodat\u0103, lucr\u0103torii ar putea \u00eenc\u0103lca anumite norme legate de etic\u0103 \u0219i comportament. \u00cen acest context, at\u00e2t EMP, c\u00e2t \u0219i Contractorul vor fi responsabili de instruirea personalului privind modul de organizare a lucr\u0103rilor, comportatul \u0219i regulile de comunicare \u0219i informare a persoanelor din zon\u0103. Totodat\u0103, personalul implicat \u00een lucr\u0103ri va semna Codul de conduit\u0103 aplicabil lucr\u0103rilor.<\/p>\n<p><strong>Impactul asupra infrastructurii \u0219i drumurilor de acces:<\/strong> Pe durata transport\u0103rii materialelor \u0219i echipamentelor, transportarea de\u0219eurilor \u0219i alte lucr\u0103ri majore planificate ar putea fi accesul \u00eengreunat sau restric\u021bionat \u00een cl\u0103dirile din apropiere \u0219i pentru a circula pe drumurile adiacente cl\u0103dirii c\u0103minului. Astfel, programul de lucru \u0219i activit\u0103\u021bile planificate vor fi discutate cu Contractorul s\u0103pt\u0103m\u00e2nal pentru a putea informa \u0219i planifica circula\u021bia cu minim impact asupra utiliz\u0103rii infrastructurii existente \u0219i a drumurilor de acces.<\/p>\n<p><strong>Exploatarea sexual\u0103 \u0219i abuzul \u0219i agresiunea sexual\u0103:<\/strong> Nu se a\u0219teapt\u0103 ca lucr\u0103torii implica\u021bi \u00een lucr\u0103rile de renovare s\u0103 fie caza\u021bi pe \u0219antier sau \u00een apropierea acestuia. Studen\u021bi se vor afla \u00een apropiere doar \u00een timpul orelor de activitate a complexelor sportive \u0219i culturale din zon\u0103. Totu\u0219i, lucr\u0103torii implica\u021bi \u00een renov\u0103ri ar trebui s\u0103 fie instrui\u021bi privind aceste aspecte \u0219i informa\u021bi corespunz\u0103tor, inclusiv \u0219i prin semnarea unui cod de conduit\u0103. Pe durata consult\u0103rilor se vor informa toate p\u0103r\u021bile interesate \u0219i comunitatea din zon\u0103 privind\u00a0 mecanismul de reclama\u021bii existent \u00een cadrul proiectului.<\/p>\n<p>\u00cen linii generale, impacturile poten\u021bial a\u0219teptate sunt corelate lucr\u0103rilor de renovare planificate \u0219i \u00een cea mai mare parte pe durata lucr\u0103rilor de renovare.<\/p>\n<p><a name=\"_Toc147737861\"><\/a><a name=\"_Toc125385809\"><\/a><a name=\"_Toc184731084\"><\/a><strong>\u00a0<\/strong><\/p>\n<ol start=\"3\">\n<li><strong> CADRUL LEGAL \u0218I INSTITU\u021aIONAL<\/strong>\n<ul>\n<li><a name=\"_Toc184731085\"><\/a> <strong>Cadrul Legal Na\u021bional<\/strong><\/li>\n<\/ul>\n<\/li>\n<\/ol>\n<p>Aceast\u0103 sec\u021biune descrie pe scurt principalele reglement\u0103ri ale legisla\u021biei na\u021bionale pe domeniu \u00a0de mediu \u0219i social, relevante pentru implementarea subproiectului \u0219i se refer\u0103 la institu\u021biile de la nivel local \u0219i na\u021bional care sunt responsabile cu eliberarea autoriza\u021biilor \u0219i avizelor \u0219i cu aplicarea standardelor de mediu \u0219i sociale. O list\u0103 mai cuprinz\u0103toare a cadrului juridic \u0219i institu\u021bional este prev\u0103zut\u0103 \u00een Anexa 2.<\/p>\n<p>Principalele acte juridice na\u021bionale se g\u0103sesc \u00een tabelul de mai jos:<\/p>\n<p><a name=\"_Toc147738297\"><\/a><strong>Tabel <\/strong><strong>1<\/strong><strong>: Cadrul legal na\u021bional<\/strong><\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"230\">Denumirea actului juridic<\/td>\n<td width=\"230\">Descriere general\u0103<\/td>\n<td width=\"230\">Relevan\u021ba pentru sub-proiect<\/td>\n<\/tr>\n<tr>\n<td width=\"230\"><strong>Legea privind protec\u021bia mediului nr. 1515 din 16 iunie 1993 cu modific\u0103rile ulterioare<\/strong><\/td>\n<td width=\"230\">stabile\u0219te cadrul legal de baz\u0103 pentru redactarea actelor normative speciale \u0219i a instruc\u021biunilor privind protec\u021bia mediului<\/td>\n<td width=\"230\">reguli de baz\u0103 privind condi\u021biile de calitate, drepturile \u0219i \u00eendatoririle fiec\u0103rui actor cu activit\u0103\u021bi cu impact poten\u021bial asupra mediului<\/td>\n<\/tr>\n<tr>\n<td width=\"230\"><strong>\u00a0<\/strong><\/p>\n<p><strong>Legea privind evaluarea impactului asupra mediului nr. 86 din 29.05.2014cu modific\u0103rile ulterioare<\/strong><\/td>\n<td width=\"230\">stabile\u0219te obiectivul preg\u0103tirii documenta\u021biei privind Evaluarea impactului asupra mediului (EIM), procedura, coordonarea \u0219i aprobarea acesteia \u0219i include Lista obiectelor \u0219i tipurilor de activit\u0103\u021bi pentru care EIM este obligatorie \u00eenainte de proiectarea lor<\/td>\n<td width=\"230\">nu este relevant\u0103, deoarece proiectul nu va sus\u021bine nicio activitate de infrastructur\u0103 la scar\u0103 mare<\/td>\n<\/tr>\n<tr>\n<td width=\"230\"><strong>\u00a0<\/strong><\/p>\n<p><strong>Legea privind spa\u021biile verzi din localit\u0103\u021bile urbane \u0219i rurale nr. 591 din23.09.1999 <\/strong><\/td>\n<td width=\"230\">reglementeaz\u0103 rela\u021biile \u00een domeniul dezvolt\u0103rii \u0219i protec\u021biei spa\u021biilor verzi din localit\u0103\u021bile urbane \u0219i rurale, pentru a asigura dreptul fiec\u0103rui individ la un mediu s\u0103n\u0103tos \u0219i estetic<\/td>\n<td width=\"230\">identificarea \u0219i delimitarea zonelor verzi din apropierea c\u0103minului studen\u021besc<\/p>\n<p>&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"230\"><strong>Legea apelor nr. 272 din 23.12.2012<\/strong><\/td>\n<td width=\"230\">par\u021bial armonizat\u0103 cu directivele UE \u00een domeniul politicii de ap\u0103, stabile\u0219te cadrul legal necesar pentru gestionarea, protec\u021bia \u0219i utilizarea apei<\/td>\n<td width=\"230\">ar putea fi relevant\u0103 \u00een cazul renov\u0103rii re\u021belelor de aprovizionare cu ap\u0103, \u00een alte cazuri nu este relevant\u0103<\/td>\n<\/tr>\n<tr>\n<td width=\"230\"><strong>Codul funciar nr. 828 din 25.12.91; modificat 22 din 15.02.2024 \u00een vigoare 07.03.2025<\/strong><\/td>\n<td width=\"230\">stabile\u0219te rela\u021biile \u0219i drepturile de proprietate asupra terenurilor \u0219i cadrul de baz\u0103 al utiliz\u0103rii terenurilor<\/td>\n<td width=\"230\">pentru stabilirea procedurilor, \u00eendatoririlor \u0219i obliga\u021biilor \u00een administrarea terenului<\/td>\n<\/tr>\n<tr>\n<td width=\"230\"><strong>Legea privind calitatea aerului atmosferic, nr. 98 din 14.04.2022<\/strong><\/p>\n<p>&nbsp;<\/td>\n<td width=\"230\">legea transpune par\u021bial Directiva 2008\/50\/CE a Parlamentului European \u0219i a Consiliului din 21 mai 2008 privind calitatea aerului \u00eenconjur\u0103tor \u0219i un aer mai curat pentru Europa \u0219i const\u0103 \u00een crearea cadrului juridic \u00een vederea consolid\u0103rii capacit\u0103\u021bilor institu\u021bionale de monitorizare \u0219i de evaluare a calit\u0103\u021bii aerului atmosferic pentru identificarea \u0219i punerea \u00een aplicare a m\u0103surilor eficiente de reducere a emisiilor de poluan\u021bi atmosferici la niveluri care s\u0103 minimizeze efectele nocive asupra s\u0103n\u0103t\u0103\u021bii umane \u0219i a mediului ca \u00eentreg.<\/td>\n<td width=\"230\">relevant\u0103 pentru asigurarea calit\u0103\u021bii aerului pentru activit\u0103\u021bile legate de lucr\u0103rile de renovare\u00a0 \u0219i, de asemenea, pentru asigurarea cerin\u021belor legale pentru zgomot \u00een timpul lucr\u0103rilor de renovare<\/td>\n<\/tr>\n<tr>\n<td width=\"230\"><strong>Legea privind de\u0219eurile nr. 209 din 29.07.2016<\/strong><\/td>\n<td width=\"230\">reglementeaz\u0103 metodele de gestionare a de\u0219eurilor, astfel \u00eenc\u00e2t acestea s\u0103 nu pun\u0103 \u00een pericol mediul, s\u0103n\u0103tatea oamenilor \u0219i alte organisme vii. Autorit\u0103\u021bile responsabile autorizeaz\u0103 activit\u0103\u021bi de colectare, transport, exploatare \u0219i evacuare a de\u0219eurilor, evit\u00e2nd apa, solul, flora, fauna, poluarea fonic\u0103 \u0219i a aerului. Noile metode nu trebuie s\u0103 pun\u0103 \u00een pericol peisajele sau ariile protejate.<\/td>\n<td width=\"230\">relevant\u0103 pentru asigurarea gestion\u0103rii de\u0219eurilor la nivelul fiec\u0103rei institu\u021bii pentru de\u0219euri toxice, echipamente electrice \u0219i electronice pentru de\u0219euri solide<\/td>\n<\/tr>\n<tr>\n<td width=\"230\"><strong>Codul Urbanismului \u0219i Constrc\u021biilor nr. 434 din 28.12.2023; modificat prin LP 203 din 25.07.2024 \u00een vigoare 30. 01.2025<\/strong><\/td>\n<td width=\"230\">Prevederile codului se aplic\u0103 construc\u021biilor \u0219i instala\u021biilor aferente, denumite \u00een continuare industria construc\u021biilor, \u00een proiectarea, edificarea \u0219i construirea,\u00a0 precum \u0219i \u00een etapele de exploatare \u0219i interven\u021bii la cl\u0103dirile existente \u0219i dup\u0103 utilizarea acestora, indiferent de forma lor de proprietate, destina\u021bie, categorie \u0219i clas\u0103 sau surs\u0103 de finan\u021bare, pentru a proteja via\u021ba \u0219i bunurile oamenilor, societatea \u0219i mediul \u00eenconjur\u0103tor.<\/td>\n<td width=\"230\">relevant\u0103 pentru lucr\u0103rile de renovare<\/td>\n<\/tr>\n<tr>\n<td width=\"230\"><strong>Legea nr. 1530 din 22.06.1993 modificat\u0103 prin legea nr,132 din 26.05.2023<\/strong><\/td>\n<td width=\"230\">Legea privind protec\u021bia monumentelor istorice din Republica Moldova este similar\u0103 cu Legea nr. 422\/2001 din Rom\u00e2nia, care reglementeaz\u0103 regimul juridic general al monumentelor istorice.\u00a0<a href=\"https:\/\/legislatie.just.ro\/Public\/DetaliiDocument\/29761\">Aceasta include m\u0103suri pentru identificarea, cercetarea, inventarierea, clasarea, conservarea, restaurarea \u0219i punerea \u00een valoare a monumentelor istorice<\/a><\/td>\n<td width=\"230\">Relevant\u0103 lucr\u0103rilor de renovare pentru c\u0103minul inclus \u00een Registrul monumentelor istorice<\/td>\n<\/tr>\n<tr>\n<td width=\"230\"><strong>\u00a0<\/strong><\/p>\n<p><strong>Legea privind accesul la informa\u021bie nr. 982-XIV din 11.05.2000<\/strong><\/td>\n<td width=\"230\">reglementeaz\u0103 drepturile de acces la informa\u021bie de importan\u021b\u0103 public\u0103 de\u021binute de autorit\u0103\u021bile publice, \u00een vederea exercit\u0103rii \u0219i protej\u0103rii interesului public de a cunoa\u0219te \u0219i a ob\u021bine o ordine democratic\u0103 liber\u0103 \u0219i o societate deschis\u0103<\/td>\n<td width=\"230\">relevant\u0103 pentru asigurarea modului activ \u0219i pasiv de diseminare a informa\u021biilor despre implementarea proiectului \u0219i a lucr\u0103rilor de renovare\/renovare executate \u00een cadrul proiectului<\/td>\n<\/tr>\n<tr>\n<td width=\"230\"><strong>Legea cu privire la supravegherea de stat a s\u0103n\u0103t\u0103\u021bii publice #10-XVI din 03 februarie 2009<\/strong><\/td>\n<td width=\"230\">Prezenta lege reglementeaz\u0103 organizarea supravegherii de stat a s\u0103n\u0103t\u0103\u021bii publice, stabilind cerin\u021be generale pentru s\u0103n\u0103tatea public\u0103, drepturile \u0219i obliga\u021biile persoanelor fizice \u0219i juridice, procedura de organizare a sistemului de supraveghere de stat a s\u0103n\u0103t\u0103\u021bii publice.<\/td>\n<td width=\"230\">Este relevant\u0103 lucr\u0103rilor de renovare din cadrul subproiectului.<\/td>\n<\/tr>\n<tr>\n<td width=\"230\"><strong>Cod Administrativ al Republicii Moldova, #116\/2018<\/strong><\/td>\n<td width=\"230\">Codul administrativ stabile\u0219te procedura de examinare a peti\u021biilor cet\u0103\u021benilor RM adresate autorit\u0103\u021bilor\/organismelor competente \u00een scopul asigur\u0103rii protec\u021biei drepturilor \u0219i intereselor legitime ale peti\u021bionarilor.<\/td>\n<td width=\"230\">Relevant\u0103 \u00een cazul expedierii peti\u021biilor \u00eenafara mecanismului stabilit \u00een cadrul proiectului.<\/td>\n<\/tr>\n<tr>\n<td width=\"230\"><strong>Codul Muncii #154 din 13 martie 2003<\/strong><\/td>\n<td width=\"230\">Codul Muncii reglementeaz\u0103 toate rela\u021biile individuale \u0219i colective de munc\u0103, controlul aplic\u0103rii reglement\u0103rilor \u00een domeniul rela\u021biilor de munc\u0103, jurisdic\u021bia muncii, precum \u0219i alte rela\u021bii direct legate de rela\u021biile de munc\u0103. Codul Muncii cuprinde prevederi privind nediscriminarea la locul de munc\u0103, v\u00e2rsta angaj\u0103rii, munca for\u021bat\u0103 etc.<\/td>\n<td width=\"230\">Aplicabil\u0103 lucr\u0103torilor proiectului, inclusiv celor implica\u021bi \u00een lucr\u0103rile de renovare.<\/td>\n<\/tr>\n<tr>\n<td width=\"230\"><strong>Cod penal #98 din 18 aprilie 2022<\/strong><\/td>\n<td width=\"230\">Pentru a fi aplicabil pentru h\u0103r\u021buirea sexual\u0103 la locul de munc\u0103.<\/td>\n<td width=\"230\">Se aplic\u0103 pentru h\u0103r\u021buirea sexual\u0103.<\/td>\n<\/tr>\n<tr>\n<td width=\"230\"><strong>Legea privind s\u0103n\u0103tatea \u0219i securitatea \u00een munc\u0103 #no.186\/2008<\/strong><\/td>\n<td width=\"230\">(1) Prezenta lege reglementeaz\u0103 raporturile juridice referitoare la stabilirea m\u0103surilor privind securitatea \u0219i s\u0103n\u0103tatea lucr\u0103torilor la locul de munc\u0103.<\/p>\n<p>(2) Prezenta lege stabile\u0219te principiile generale privind prevenirea riscurilor profesionale, protec\u021bia lucr\u0103torilor la locul de munc\u0103, eliminarea factorilor de risc \u0219i accidente, informarea, consultarea, participarea echilibrat\u0103, instruirea lucr\u0103torilor \u0219i a reprezentan\u021bilor acestora, precum \u0219i liniile directoare generale privind aplicarea principiilor men\u021bionate.<\/td>\n<td width=\"230\">Este aplicabil privind s\u0103n\u0103tatea \u0219i securitatea ocupa\u021bional\u0103 a lucr\u0103torilor direc\u021bi \u0219i contracta\u021bi identifica\u021bi \u00een Procedurile de gestionare a muncii.<\/p>\n<p>&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"230\"><strong>Legea privind incluziunea social\u0103 a persoanelor cu dizabilit\u0103\u021bi, nr. 60 din 30.03.2012<\/strong><\/td>\n<td width=\"230\">reglementeaz\u0103 drepturile persoanelor cu dizabilit\u0103\u021bi la incluziune social\u0103, garant\u00e2nd posibilitatea particip\u0103rii lor la toate domeniile vie\u021bii f\u0103r\u0103 discriminare, la un nivel identic cu ceilal\u021bi membri ai societ\u0103\u021bii, av\u00e2nd ca baz\u0103 respectul drepturilor \u0219i libert\u0103\u021bilor fundamentale ale omului.<\/td>\n<td width=\"230\">Aplicabil\u0103 pe durata proiect\u0103rii \u0219i gestion\u0103rii c\u0103minului.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<ul>\n<li><a name=\"_Toc184731086\"><\/a><strong>Cerin\u021bele \u0219i Standardele B\u0103ncii Mondiale<\/strong><\/li>\n<\/ul>\n<p>Politicile de salvgardare ale BM au fost \u00eenlocuite \u00een 2018 cu Cadrul de mediu \u0219i social (CMS). \u00cen cadrul CMS, zece standarde de mediu \u0219i sociale stabilesc responsabilit\u0103\u021bile debitorilor. Standardele sunt concepute pentru a ajuta \u00cemprumuta\u021bii s\u0103 gestioneze riscurile \u0219i impactul Proiectului, precum \u0219i s\u0103 \u00eembun\u0103t\u0103\u021beasc\u0103 performan\u021ba de mediu \u0219i social\u0103, \u00een concordan\u021b\u0103 cu bunele practici interna\u021bionale \u0219i cu obliga\u021biile na\u021bionale \u0219i interna\u021bionale.<\/p>\n<p>\u00cen tabelul de mai jos sunt incluse standardele B\u0103ncii Mondiale aplicabile pentru acest subproiect.<\/p>\n<table width=\"100%\">\n<thead>\n<tr>\n<td width=\"23%\"><strong>Standarde de mediu \u0219i sociale<\/strong><\/td>\n<td width=\"40%\"><strong>Cerin\u021be<\/strong><\/td>\n<td width=\"36%\"><strong>Aplicabilitatea pentru subproiect <\/strong><\/td>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td width=\"23%\"><strong><em>1. Evaluarea \u0219i managementul riscurilor \u0219i impacturilor de mediu \u0219i sociale<\/em><\/strong><\/td>\n<td width=\"40%\">Standardul stabile\u0219te m\u0103suri \u0219i responsabilit\u0103\u021bi pentru evaluarea, gestionarea \u0219i monitorizarea riscurilor \u0219i impacturilor de mediu \u0219i sociale asociate cu ciclul de via\u021b\u0103 al Proiectului, pentru a ob\u021bine rezultate de mediu \u0219i sociale \u00een concordan\u021b\u0103 cu standardele BM.<\/td>\n<td width=\"36%\"><strong>Standardul este aplicabil pentru toat\u0103 durata de implementare a P\u00ceSM. <\/strong><\/p>\n<p>CMMS este elaborate conform SSM1. Drept urmare, acest PMMS specific amplasamentului este elaborate la etapa de proiectare a subproiectului.<\/td>\n<\/tr>\n<tr>\n<td width=\"23%\"><strong><em>2. Condi\u021bii de munc\u0103<\/em><\/strong><\/td>\n<td width=\"40%\">Standardul stabile\u0219te m\u0103suri \u0219i responsabilit\u0103\u021bi pentru a proteja for\u021ba de munc\u0103 direct\u0103 \u0219i indirect\u0103 specifice ciclului de via\u021b\u0103 al Proiectului, inclusiv riscurile legate de munc\u0103 (i) riscuri de securitate pentru lucr\u0103torii proiectului, (ii) probleme de trafic \u0219i siguran\u021b\u0103 rutier\u0103, (iii) termeni \u0219i condi\u021bii inadecvate de angajare \u0219i (iv) riscuri de SSM.<\/td>\n<td width=\"36%\">Cerin\u021bele fa\u021b\u0103 de condi\u021biile de munc\u0103 se aplic\u0103 pentru toate entit\u0103\u021bile de implementare, inclusiv pentru contractorii care vor realiza lucr\u0103rile de renovare.<\/td>\n<\/tr>\n<tr>\n<td width=\"23%\"><strong><em>3. Eficien\u021ba resurselor, prevenirea \u0219i managementul polu\u0103rii<\/em><\/strong><\/td>\n<td width=\"40%\">Standardul stabile\u0219te m\u0103suri \u0219i responsabilit\u0103\u021bi pentru a aborda eficien\u021ba resurselor \u0219i prevenirea \u0219i gestionarea polu\u0103rii pe tot parcursul ciclului de via\u021b\u0103 al proiectului, inclusiv (i) consumul de resurse, (ii) prevenirea polu\u0103rii \u0219i (iii) ac\u021biuni de gestionare a aspectelor semnificative de mediu etc.<\/td>\n<td width=\"36%\">Riscurile \u0219i impacturile specifice amplasamentului vor fi identificate \u00een faza de proiectare \u00een timpul procesului de screening de mediu \u0219i social, iar m\u0103surile de atenuare vor fi aplicate conform PMMS specific amplasamentului elaborat la nivel de subproiect.<\/td>\n<\/tr>\n<tr>\n<td width=\"23%\"><strong><em>4. S\u0103n\u0103tatea \u0219i Securitatea Comunit\u0103\u021bii<\/em><\/strong><\/td>\n<td width=\"40%\">Standardul stabile\u0219te m\u0103suri \u0219i responsabilit\u0103\u021bi pentru abordarea riscurilor de s\u0103n\u0103tate \u0219i siguran\u021b\u0103 pentru comunitate, inclusiv securitatea activit\u0103\u021bilor proiectului, echipamentelor \u0219i infrastructurii la riscurile \u0219i impactul asupra comunit\u0103\u021bilor afectate de proiect.<\/td>\n<td width=\"36%\">M\u0103surile de atenuare vor fi aplicate conform PMMS specific amplasamentului elaborate la nivel de subproiect.<\/td>\n<\/tr>\n<tr>\n<td width=\"23%\"><strong><em>10. Implicarea p\u0103r\u021bilor interesate \u0219i dezv\u0103luirea informa\u021biilor<\/em><\/strong><\/td>\n<td width=\"40%\">Standardul asigur\u0103 un angajament cu p\u0103r\u021bile interesate de-a lungul ciclului de via\u021b\u0103 al proiectului, \u00eencep\u00e2nd o astfel de implicare c\u00e2t mai devreme posibil \u00een procesul de preg\u0103tire a proiectului \u0219i \u00eentr-un interval de timp care permite consult\u0103ri semnificative cu p\u0103r\u021bile interesate cu privire la proiectarea proiectului.<\/td>\n<td width=\"36%\">Planul de Implicare a P\u0103r\u021bilor Interesate se va implementa \u0219i pe durata desf\u0103\u0219ur\u0103rii lucr\u0103rilor de renovare.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<ul>\n<li><a name=\"_Toc184731087\"><\/a><strong>Cadrul Institu\u021bional Na\u021bional<\/strong><\/li>\n<\/ul>\n<p>Conform reformei guvernamentale recente la nivel central, a fost format <strong><em>Ministerul Mediului<\/em><\/strong>, care elaboreaz\u0103 politici publice eficiente \u00een domeniile de competen\u021b\u0103 (protec\u021bia mediului \u0219i schimb\u0103rile climatice; resurse naturale), iar pentru a realiza reforma institu\u021bional\u0103 \u0219i consolidarea capacit\u0103\u021bilor \u00een sectorul mediului, au fost create <strong><em>Agen\u021bia de Mediu <\/em><\/strong><em>\u0219i<strong> Inspectoratul pentru Protec\u021bia Mediului<\/strong><\/em><strong>,<\/strong> ambele institu\u021bii fiind func\u021bionale.<\/p>\n<p><strong><em>Ministerul S\u0103n\u0103t\u0103\u021bii \u00a0<\/em><\/strong>are misiunea de a analiza situa\u021bia \u0219i problemele din domeniile s\u0103n\u0103t\u0103\u021bii, de a elabora politici publice eficiente \u00een domeniu, de a monitoriza calitatea politicilor \u0219i actelor normative \u0219i de a propune interven\u021bii justificate ale statului care va oferi solu\u021bii eficiente \u00een domeniile de competen\u021b\u0103, asigur\u00e2nd cel mai bun raport \u00eentre rezultatele preconizate \u0219i costurile a\u0219teptate.<\/p>\n<p><strong><em>Inspectoratul de Stat al Muncii<\/em><\/strong> duce controlul \u0219i monitorizeaz\u0103 rapoartele \u0219i condi\u021biilor de munc\u0103.<a name=\"_Toc147750063\"><\/a><strong>\u00a0 <\/strong><\/p>\n<ol start=\"2\">\n<li><a name=\"_Toc184731088\"><\/a> <strong>M\u0102SURI DE EVITARE \u0218I MINIMIZARE A RISCURILOR \u0218I IMPACTRUILOR DE MEDIU \u0218I SOCIALE<\/strong><\/li>\n<\/ol>\n<p>\u00cen contextul poten\u021bialelor riscuri \u0219i cerin\u021belor na\u021bionale \u0219i ale B\u0103ncii Mondiale men\u021bionate \u00een sec\u021biunile de mai sus, au fost elaborate \u0219i propuse spre implementare m\u0103suri specifice pentru prevenirea \u0219i minimizarea impactului negativ privind activit\u0103\u021bile planificate ale proiectului. Trebuie remarcat faptul c\u0103, pentru a face mai eficiente m\u0103surile propuse, poten\u021bialele efecte \u0219i ac\u021biunile adecvate de prevenire \u0219i minimizare vor fi actualizate \u00een mod regulat \u00een timpul implement\u0103rii subproiectului.<\/p>\n<ul>\n<li><a name=\"_Toc147737873\"><\/a><a name=\"_Toc184731089\"><\/a><strong>Recomand\u0103ri Generale Privind Impactul Asupra Mediului<\/strong><\/li>\n<\/ul>\n<p>Aceast\u0103 sec\u021biune detaliaz\u0103 specifica\u021biile care trebuie evaluate \u00een timpul demol\u0103rii \u0219i se refer\u0103 la manipularea de\u0219eurilor din construc\u021bii, colectarea separat\u0103 a\u00a0 materialelor de renovare \u0219i metodele de renovare cu impact limitat asupra mediului \u0219i metodele de reducere a consumului de energiei (Anexa 1). <strong>Contractorul va elabora un plan de management de mediu \u0219i social care va lua \u00een considerare urm\u0103toarele aspecte: <\/strong><\/p>\n<p><strong>Amplasamentul<\/strong><\/p>\n<p>Analiza \u0219i evaluare specifice amplasamentului trebuie s\u0103 ia \u00een considerare urm\u0103toarele aspecte:<\/p>\n<ul>\n<li>Praful \u0219i zgomotul datorat lucr\u0103rilor de repara\u021bie capital\u0103;<\/li>\n<li>Eliminarea de\u0219eurilor din construc\u021bii, scurgeri accidentale de ulei de ma\u0219in\u0103, lubrifian\u021bi etc;<\/li>\n<li>Manipularea necorespunz\u0103toare a materialelor periculoase, cum ar fi azbestul \u0219i vopseaua pe baz\u0103 de plumb, \u00een etapele de transport \u0219i de manipulare aferente lucr\u0103rilor de construc\u021bii, se va minimiza prin utilizarea apei \u0219i prin alte mijloace, cum ar fi \u00eemprejmuirea \u0219antierelor.<\/li>\n<li>Pentru a reduce zgomotul, lucr\u0103rile de construc\u021bii vor fi restric\u021bionate \u00een anumite intervale de ore.<\/li>\n<li>Toate de\u0219eurile din construc\u021bii \u0219i de\u0219eurile de lemn vor fi depozitate pe \u0219antier.<\/li>\n<li>De\u0219eurile din lemn vor fi depozitate separat \u0219i se vor face demersuri pentru a fi reciclate, \u0219i nu eliminate.<\/li>\n<li>Este interzis\u0103 arderea \u00een are liber \u0219i eliminarea ilegal\u0103 a de\u0219eurilor;<\/li>\n<li>Se vor stabili locuri adecvate pentru depozitarea materialelor \u0219i nisipului, \u0219i se va ob\u021bine aprobarea prealabil\u0103 a autorit\u0103\u021bii competente pentru eliminarea acestora.<\/li>\n<li>Se va evita acumularea de stocuri de de\u0219euri din construc\u021bii pe \u0219antier, iar de\u0219eurile vor fi eliminate \u00een mod regulat la o groap\u0103 de gunoi autorizat\u0103 \u00een acest sens. Vor fi furnizate jgheaburi\/ utilizate topogane pentru a transfera de\u0219eurile de la etajele superioare la sol.<\/li>\n<\/ul>\n<p><strong>Selectarea materialelor de renovare \u0219i a metodelor de construire<\/strong><\/p>\n<p>Se vor selecta bunuri \u0219i servicii ecologice. Se va acorda prioritate produselor care \u00eendeplinesc standardele aplicabile pentru simboluri interna\u021bionale sau na\u021bionale recunoscute. Se va acorda prioritate materialelor \u0219i metodelor tradi\u021bionale, consacrate, \u0219i nu tehnicilor noi \u0219i necunoscute. \u0218antierul de construc\u021bii ar trebui s\u0103 fie \u00eengr\u0103dit pentru a preveni intrarea publicului \u0219i trebuie impuse m\u0103suri generale de siguran\u021b\u0103. Inconvenientele temporare datorate lucr\u0103rilor de construire ar trebui reduse la minimum prin opera\u021biuni de planificare \u0219i coordonare cu Contractan\u021bii, vecinii \u0219i autorit\u0103\u021bile. activit\u0103\u021bile zgomotoase sau generatoare de vibra\u021bii ar trebui limitate, \u00een sensul realiz\u0103rii strict pe timpul zilei.<\/p>\n<p><strong>Gestionarea de\u0219eurilor<\/strong><\/p>\n<p>Manipularea de\u0219eurilor din activit\u0103\u021bile de construire se va face \u00een conformitate cu reglement\u0103rile Legii de\u0219eurilor, nr.209\/2016, conform specifica\u021biilor din PMMS \u0219i descrierii de mai sus cu privire la \u0219antier. Monitorizarea va c\u0103dea \u00een responsabilitatea dirigintelui de \u0219antier. Pentru azbest \u0219i materiale care con\u021bin azbest, a se vedea Anexa 4. \u00cen toate cazurile specifice \u00een care contractantul trebuie s\u0103 demoleze sau s\u0103 elimine materiale care con\u021bin azbest, aceste categorii de lucr\u0103ri vor fi realizate numai cu personal calificat \u0219i \u00een deplin\u0103 conformitate cu legisla\u021bia specific\u0103 \u00een acest domeniu.<\/p>\n<p>Principalele materiale rezultate \u00een urma opera\u021biunilor de repara\u021bie capital\u0103 sunt de\u0219eurile din construc\u021bii, praful \u0219i piatra. Acestea nu pun probleme speciale \u00een ceea ce prive\u0219te poten\u021bialul de contaminare. Aceste de\u0219euri vor fi transportate la groapa de gunoi a ora\u0219ului. De\u0219eurile menajere \u0219i de\u0219euri similare vor fi colectate \u00een interiorul \u0219antierului \u00een punctele de colectare a de\u0219eurilor prev\u0103zute cu containere de gunoi echipate \u0219i etichetate corespunz\u0103tor. Periodic, acestea vor fi transportate \u00een siguran\u021b\u0103 \u00eentr-o zon\u0103 de colectare a de\u0219eurilor.<\/p>\n<p>De\u0219eurile de lemn vor fi selectate, colectate \u00een recipiente etichetate corespunz\u0103tor \u0219i eliminate\/reutilizate.<\/p>\n<p>Materialele cu poten\u021bial toxic deosebit de ridicat, vor fi depozitate \u00een mod corespunz\u0103tor \u00een recipiente\/containere\/butoaie inscrip\u021bionate \u00een func\u021bie de natura de\u0219eurilor, \u00een spa\u021biul de depozitare amenajat la fa\u021ba locului (de exemplu: hal\u0103\/barac\u0103 pentru depozitarea de\u0219eurilor rezultate din lucr\u0103rile de repara\u021bie, cu un regim de renovare temporar\u0103, pe durata existen\u021bei \u0219antierului, care urmeaz\u0103 s\u0103 fie demontat\u0103 dup\u0103 finalizarea lucr\u0103rilor de repara\u021bie).<\/p>\n<p>Vopselele, diluan\u021bii \u0219i alte substan\u021be periculoase vor fi depozitate \u00een recipiente\/butoaie bine sigilate, rezistente la \u0219ocuri mecanice sau termice, etichetate corespunz\u0103tor, depozitate \u00eentr-un spa\u021biu adecvat amenajat \u00een incinta amplasamentului, \u00eemprejmuite\/betonate \u0219i securizate CIP, pentru a preveni curgerile necontrolate sau eventuale incendii \u0219i tratate cu siguran\u021b\u0103 maxim\u0103 de c\u0103tre personalul instruit pentru \u00eenc\u0103rcarea\/transportul\/desc\u0103rcarea containerelor\/butoaielor \u00een condi\u021bii de siguran\u021b\u0103 \u0219i pentru interven\u021bie \u00een caz de accidente.<\/p>\n<p><strong>NOT\u0102:<\/strong> <em>Eviden\u021ba de\u0219eurilor rezultate \u00een urma demol\u0103rii\/renov\u0103rii trebuie f\u0103cut\u0103 pe baza unui plan de gestionare a de\u0219eurilor din activit\u0103\u021bile de repara\u021bie preg\u0103tit de contractant, care va eviden\u021bia pentru fiecare activitate desf\u0103\u0219urat\u0103 cantit\u0103\u021bile de de\u0219euri generate pentru fiecare tip de de\u0219eu, identificate conform Legii de\u0219eurilor nr 209\/2016.<\/em><\/p>\n<p>Transportul de\u0219eurilor periculoase \u0219i nepericuloase generate va fi efectuat conform prevederilor Legii de\u0219eurilor nr 209\/2016.<\/p>\n<ul>\n<li><a name=\"_Toc147737874\"><\/a><a name=\"_Toc184731090\"><\/a><strong>S\u0103n\u0103tatea \u0219i Securitatea la Locul de Munc\u0103<\/strong><\/li>\n<\/ul>\n<p>Pericolele privind s\u0103n\u0103tate \u0219i securitatea la locul de munc\u0103 pot ap\u0103rea \u00een timpul renov\u0103rii, \u00eentre\u021binerii \u0219i exploat\u0103rii unor noi instala\u021bii \u0219i echipamente \u0219i trebuie gestionate cu aten\u021bie.<\/p>\n<p>Contractorul va elabora un cod de conduit\u0103 pentru lucr\u0103tori \u0219i va desf\u0103\u0219ura instruiri \u00een conformitate cu ESS2 al BM \u0219i cu LMP al Proiectului. Contractorul va lua toate m\u0103surile de siguran\u021b\u0103 a muncii pe \u0219antierul proiectului \u00een conformitate cu legisla\u021bia na\u021bional\u0103 \u0219i cele mai bune practici interna\u021bionale.<\/p>\n<p>Mul\u021bi lucr\u0103tori vor fi expu\u0219i riscurilor de securitate \u0219i s\u0103n\u0103tate \u00een munc\u0103, incluz\u00e2nd \u00een principal, dar f\u0103r\u0103 a se limita la:<\/p>\n<ul>\n<li>Lipsa con\u0219tientiz\u0103rii \u0219i inform\u0103rii cu privire la cerin\u021bele de securitate \u0219i s\u0103n\u0103tate \u00een munc\u0103, cum ar fi utilizarea echipamentului de protec\u021bie personal\u0103 (EPP) \u0219i practicile de siguran\u021b\u0103 la locul de munc\u0103;<\/li>\n<li>Lucr\u0103ri electrice;<\/li>\n<li>Expunerea la substan\u021be chimice (ca vopsele, solven\u021bi, lubrifian\u021bi \u0219i combustibili);<\/li>\n<li>Accidente rutiere;<\/li>\n<li>Ridicarea structurilor grele;<\/li>\n<li>Expunerea la agen\u021bi aerieni de renovare (praf, azbest);<\/li>\n<li>Pericole de sudur\u0103 (vapori, arsuri \u0219i radia\u021bii).<\/li>\n<\/ul>\n<p>\u00cen special, trebuie s\u0103 se asigure m\u0103suri de prevenire \u0219i control lucr\u0103torilor instrui\u021bi \u0219i certifica\u021bi s\u0103 acceseze instala\u021bii sau orice zon\u0103 care ar putea prezenta riscuri pentru s\u0103n\u0103tatea \u0219i securitatea muncii, cu dispozitivele de siguran\u021b\u0103 necesare \u0219i respectarea distan\u021belor minime de retragere.<\/p>\n<ul>\n<li><a name=\"_Toc184731091\"><\/a><strong>S\u0103n\u0103tatea \u0219i Securitatea Comunit\u0103\u021bii<\/strong><\/li>\n<\/ul>\n<p>Contractorul va elabora un Plan de Management de Mediu \u0219i Social, \u00een baza acestui plan, care va include m\u0103suri specifice de minimizare a impacturilor asupra comunit\u0103\u021bii, cum ar fi transportarea echipamentelor, materialelor \u0219i de\u0219eurilor \u00een ore mai pu\u021bin aglomerate. Evitarea bloc\u0103rii unor anumite por\u021biuni de drum care ar putea duce la blocaje \u00een trafic sau la restric\u021bion\u0103ri de trafic de lung\u0103 durat\u0103. Informarea permanent\u0103 a comunit\u0103\u021bii din zon\u0103 privind programul de lucr\u0103ri \u0219i punerea la dispozi\u021bie a unor canale active de interac\u021bionare cu comunitatea.<\/p>\n<p>Mai jos sunt detaliate m\u0103surile de atenuare \u0219i minimizare a riscurilor \u0219i impacturilor de mediu \u0219i sociale pentru etapele de\u00a0 organizarea a \u0219antierului \u0219i de renovare.<\/p>\n<p>Num\u0103rul \u0219i tipul de lucr\u0103tori se va stabili cu Contractorul p\u00e2n\u0103\u00a0 la ini\u021bierea lucr\u0103rilor de construc\u021bie.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Riscuri de mediu \u0219i sociale \u0219i m\u0103suri de atenuare la etapa de planificare \u0219i proiectare<\/strong><\/p>\n<p>&nbsp;<\/p>\n<table width=\"889\">\n<thead>\n<tr>\n<td width=\"123\"><strong>Activitatea<\/strong><\/td>\n<td colspan=\"2\" width=\"151\"><strong>Risc \u0219i impact poten\u021bial<\/strong><\/td>\n<td colspan=\"2\" width=\"404\"><strong>M\u0103surile de prevenire \u0219i minimizare propuse<\/strong><\/td>\n<td colspan=\"2\" width=\"113\"><strong>Responsabil de m\u0103suri<\/strong><\/td>\n<td colspan=\"2\" width=\"96\"><strong>Perioada<\/strong><\/td>\n<td width=\"1\">&nbsp;<\/td>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td rowspan=\"2\" width=\"123\">Planificarea \u0219i elaborarea documenta\u021biei de proiect<\/td>\n<td colspan=\"2\" width=\"151\">Impact general poten\u021bial asupra componentelor de mediului \u00eenconjur\u0103tor \u015fi social din zona de proiect<\/td>\n<td colspan=\"2\" width=\"404\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Realizarea studiilor necesare (de expertiz\u0103 tehnic\u0103 \u0219.a.) la obiectivul selectat pentru proiectare<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Efectuarea evalu\u0103rii de mediu \u0219i sociale prealabile a activit\u0103\u021bii planificate (procedura de \u201e<em>screening\u201d<\/em>), incl. evaluarea st\u0103rii actuale a obiectivului (func\u021bionalitatea, siguran\u021ba \u0219.a.), identificarea riscurilor poten\u021biale de mediu \u0219i sociale \u0219i schi\u021barea m\u0103surilor preventive<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Coordonarea \u015fi avizarea ini\u021bierii activit\u0103\u021bilor de proiectare conform cerin\u021belor \u015fi procedurilor na\u021bionale \u00een vigoare (aviz tehnic, certificat de urbanism \u0219.a. dup\u0103 caz)<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Elaborarea <em>Proiectului de execu\u021bie<\/em> conform normativelor \u00een construc\u021bii existente, inclusiv solu\u021bii de organizare a \u0219antierului\/lucr\u0103rilor, gestionarea de\u0219eurilor de construc\u021bii, eficien\u0163\u0103 energetic\u0103 etc. <strong>(Materiale care con\u021bin azbest NU vor fi utilizate \u00een construc\u021bii noi! \u2013 g\u0103si\u021bi anexate <em>\u00cendrum\u0103ri privind materialele care con\u021bin azbest<\/em>)<\/strong><\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Elaborarea planurilor de m\u0103suri \u015fi de monitorizare de mediu \u0219i sociale pentru etapele de proiectarea \u0219i renovare<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Verificarea, coordonarea \u0219i aprobarea Proiectului de execu\u0163ie, \u0219i autorizarea activit\u0103\u0163ilor de construire conform procedurilor na\u0163ionale \u00een vigoare<\/td>\n<td colspan=\"2\" width=\"113\">USM, compania de proiectare<\/td>\n<td colspan=\"2\" width=\"96\">P\u00een\u0103 la demararea lucr\u0103rilor de renovare<\/td>\n<td width=\"1\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td colspan=\"2\" width=\"151\">Eficien\u021ba energetic\u0103<\/td>\n<td colspan=\"2\" width=\"404\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Proiectarea izol\u0103rii termice\/climatiz\u0103rii adecvate a \u00eenc\u0103perilor renovate<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Proiectarea instala\u0163iilor \u015fi echipamentului de \u00eenalt\u0103 eficien\u0163\u0103 energetic\u0103<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Proiectarea ilumin\u0103rii optimale \u0219i de \u00eenalt\u0103 eficien\u0163\u0103 \u0219.a.<\/td>\n<td colspan=\"2\" width=\"113\">USM, compania de proiectare<\/td>\n<td colspan=\"2\" width=\"96\">P\u00een\u0103 la demararea lucr\u0103rilor de renovare<\/td>\n<td width=\"1\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"123\"><strong>\u00a0<\/strong><\/td>\n<td colspan=\"2\" width=\"151\">Acces universal<\/td>\n<td colspan=\"2\" width=\"404\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Autorit\u0103\u021bile responsabile au obliga\u021bia de a autoriza exploatarea obiectelor de utilitate public\u0103 numai \u00een condi\u021biile respect\u0103rii reglement\u0103rilor \u00een domeniu, astfel \u00eenc\u00e2t persoanele cu handicap s\u0103 aib\u0103 acces ne\u00eengr\u0103dit la acestea conform Art. 18 Legea cu privire la incluziunea social\u0103 a persoanelor cu dizabilit\u0103\u021bi \u00een Republica Moldova cu modific\u0103rile nr. 60 din 30.03.2013<\/td>\n<td colspan=\"2\" width=\"113\">USM, compania de proiectare<\/td>\n<td colspan=\"2\" width=\"96\">P\u00een\u0103 la demararea lucr\u0103rilor de renovare<\/td>\n<td width=\"1\">&nbsp;<\/td>\n<\/tr>\n<tr>\n<td colspan=\"2\" width=\"125\">Planificarea \u0219antierului \u0219i lucr\u0103rilor de renovare<\/td>\n<td colspan=\"2\" width=\"151\">Pl\u00e2ngeri \u0219i nemul\u021bumiri din partea locuitorilor din apropiere \u0219i din partea angaja\u021bilor<\/td>\n<td colspan=\"2\" width=\"404\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Implementarea Planului de Implicare a p\u0103r\u021bilor Interesate (SEP), inclusiv informarea \u0219i consultarea p\u0103r\u021bilor interesate \u00eenc\u0103 de la etapa de proiectare.<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Consultarea PMMS cu p\u0103r\u021bile interesate.<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Oferire informa\u021bii despre lucr\u0103rile planificate, termenele de realizare, modul de organizare a \u0219antierului, condi\u021bii de s\u0103n\u0103tate \u0219i siguran\u021b\u0103 \u0219i mecanismele de feedback \u0219i reclama\u021bii disponibile.<\/td>\n<td colspan=\"2\" width=\"113\">USM,<\/p>\n<p>EMP,<\/p>\n<p>compania de proiectare<\/td>\n<td colspan=\"2\" width=\"94\">P\u00een\u0103 la demararea lucr\u0103rilor de renovare<\/td>\n<\/tr>\n<tr>\n<td colspan=\"2\" width=\"125\">Preg\u0103tire pentru lucr\u0103ri de construc\u021bie sau renovare<\/td>\n<td colspan=\"2\" width=\"151\">S\u0103n\u0103tatea \u0219i securitatea \u00een munc\u0103<\/td>\n<td colspan=\"2\" width=\"404\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00cenainte de \u00eenceperea lucr\u0103rilor, Contractorul va elabora \u0219i va conveni cu Ministerul Educa\u021biei asupra propriului Plan de management de mediu \u0219i social (C-ESMP), care va include, printre altele:<\/p>\n<p>&#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Instruc\u021biuni de securitate \u0219i s\u0103n\u0103tate \u00een munc\u0103 pentru lucr\u0103tori.<\/p>\n<p>&#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Se va institui un mecanism de reclama\u021bie pentru angaja\u021bi.<\/p>\n<p>&#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Va fi disponibil un Cod de conduit\u0103 pentru angaja\u021bi semnat to\u021bi angaja\u021bii.<\/p>\n<p>&#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Personalul Contractorului va include un specialist responsabil cu implementarea C-ESMP.<\/td>\n<td colspan=\"2\" width=\"113\">Contractor<\/td>\n<td colspan=\"2\" width=\"94\">P\u00een\u0103 la demararea lucr\u0103rilor de renovare<\/td>\n<\/tr>\n<tr>\n<td width=\"123\"><\/td>\n<td width=\"2\"><\/td>\n<td width=\"149\"><\/td>\n<td width=\"2\"><\/td>\n<td width=\"402\"><\/td>\n<td width=\"2\"><\/td>\n<td width=\"111\"><\/td>\n<td width=\"2\"><\/td>\n<td width=\"94\"><\/td>\n<td width=\"1\"><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Riscuri de mediu \u0219i sociale \u0219i m\u0103suri de atenuare la etapa de renovare<\/strong><\/p>\n<p>&nbsp;<\/p>\n<table width=\"907\">\n<thead>\n<tr>\n<td width=\"152\"><strong>Activitatea<\/strong><\/td>\n<td width=\"151\"><strong>Risc \u0219i impact potential<\/strong><\/td>\n<td width=\"404\"><strong>M\u0103surile de prevenire \u0219i minimizare propuse<\/strong><\/td>\n<td width=\"113\"><strong>Responsabil de m\u0103suri<\/strong><\/td>\n<td width=\"86\"><strong>Perioada<\/strong><\/td>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td width=\"152\">Organizarea \u0219antierului<\/td>\n<td width=\"151\">\u0218antier neconform<\/td>\n<td width=\"404\">Elaborarea Proiectului pentru organizarea de \u0219antier trebuie s\u0103 includ\u0103 prevederi privind:<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Aspecte sociale: toalete separate pe \u0219antier pentru femei, garduri \u0219i control ala accesului, panou de identificare a investi\u021biei, cutie pentru peti\u021bii, asigurarea condi\u021biilor minime \u00een containerele utilizate de lucr\u0103tori (vestiare, zon\u0103 de servit masa, spa\u021bii de dormit) stabilirea de reguli privind s\u0103n\u0103tatea si siguran\u021ba lucr\u0103torilor;<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Mediu: marcarea corespunz\u0103toare a depozitului de de\u0219euri pe \u0219antier, reducerea efectelor \u0219antierului asupra vegeta\u021biei existente, sistem de gestionare a apelor uzate pe \u0219antier, sta\u021bie de sp\u0103lare a vehiculelor de construc\u021bii, sistem de udare pentru reducerea prafului;<\/td>\n<td width=\"113\">Compania de construc\u021bii<\/td>\n<td width=\"86\">P\u00e2n\u0103 la ini\u021bierea lucr\u0103rilor<\/td>\n<\/tr>\n<tr>\n<td rowspan=\"5\" width=\"152\">Lucr\u0103ri de demolare, finisare, instalare<\/td>\n<td width=\"151\">Impact general asupra locului\/zonei de interven\u021bie<\/td>\n<td width=\"404\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Conformarea Proiectului de execu\u021bie cu normele \u0219i cerin\u021bele \u00een vigoare (de mediu, renovare, arhitectur\u0103, tehnologie, s\u0103n\u0103tate public\u0103 \u0219.a.)<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Organizarea optimal\u0103 a \u0219antierului pentru a minimiza zon\u0103 de renovare, fluxul de materiale \u0219i de\u0219euri<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00cengr\u0103direa \u0219i limitarea accesului \u00een zona de renovare<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Instruirea personalului angajat privind bunele practici de comportament pe \u0219antierul de renovare<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Organizarea programului de lucru \u00een coordonare cu alte activit\u0103\u021bi din zon\u0103 f\u0103r\u0103 perturbarea regimului primit\/obi\u0219nuit (de ex., se va evita blocarea drumurilor de c\u0103tre vehiculele cu materiale de renovare, se va evita blocarea c\u0103ilor de acces interne, se va evita c\u00e2t este posibil deconectarea de la energie \u0219i facilit\u0103\u021bi comunale \u0219.a.)<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00cen scopul comunic\u0103rii continu\u0103 cu public va fi instalat un <em>panou informativ<\/em> la intrarea pe \u0219antier, \u00een care se va informa comunitatea despre proiect \u0219i persoane responsabile<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Semnalizarea \u0219i marcaj pentru angaja\u021bii \u0219i persoanele din vecin\u0103tate privind c\u0103ile de acces alternative\/temporare, pericole \u0219i siguran\u021ba, anun\u021buri necesare \u0219.a.<\/td>\n<td width=\"113\">Compania de construc\u021bii<\/td>\n<td width=\"86\">Lucr\u0103ri de renovare<\/td>\n<\/tr>\n<tr>\n<td width=\"151\">Poluarea fonic\u0103 (zgomotul)<\/td>\n<td width=\"404\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Program de lucru: Lucr\u0103rile de construc\u021bie vor fi programate de luni p\u00e2n\u0103 vineri, de la 07:00 la 19:00. Aceast\u0103 regul\u0103 trebuie s\u0103 fie comunicat\u0103 \u00een mod clar \u00eentregului personal al Antreprenorului \u00een timpul briefing-urilor pentru a preveni lucr\u0103rile neautorizate la ore nespecificate.<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Nivelul de zgomot la \u0219antier nu trebuie s\u0103 dep\u0103\u0219easc\u0103 nivelurile specificate \u00een standardele na\u021bionale.<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Motoarele vehiculelor \u0219i ma\u0219inilor de construc\u021bii vor fi oprite atunci c\u00e2nd nu sunt utilizate.<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00cen cazul \u00een care munca trebuie efectuat\u0103 \u00een weekend sau \u00een afara orelor stabilite, popula\u021bia local\u0103 \u0219i conducerea c\u0103minului \u0219i institu\u021biilor de \u00eenv\u0103\u021b\u0103m\u00e2nt trebuie informate \u00een prealabil. Urm\u0103toarele ar trebui comunicate \u0219i discutate:<\/p>\n<p>&#8211; Lucr\u0103ri de construc\u021bii \u00een afara programului stabilit;<\/p>\n<p>&#8211; Lucr\u0103ri unice pe termen scurt, cu niveluri ridicate de zgomot;<\/p>\n<p>&#8211; Lucru zgomotos \u00een imediata apropiere a zonelor sensibile la zgomot (cl\u0103diri reziden\u021biale);<\/p>\n<p>&#8211; Informa\u021biile ar trebui furnizate publicului de c\u0103tre:<\/p>\n<p>&#8211; Afi\u0219area informa\u021biilor detaliate pe avizier \u00een locuri vizibile la intrarea \u00een \u0219antier;<\/p>\n<p>&#8211; Actualizarea informa\u021biilor \u0219i a programelor de lucru pe site-ul consiliului local.<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Cerin\u021be pentru func\u021bionarea vehiculului:<\/p>\n<p>&#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Toate echipamentele \u0219i vehiculele trebuie men\u021binute \u00een stare de func\u021bionare;<\/p>\n<p>&#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Clientul poate interzice utilizarea anumitor echipamente si vehicule din cauza nivelurilor excesive de zgomot;<\/p>\n<p>&#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Defec\u021biunile care conduc la cre\u0219terea zgomotului trebuie remediate imediat.<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Cerin\u021be pentru func\u021bionarea sculelor \u0219i echipamentelor:<\/p>\n<p>&#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Acolo unde este posibil, utiliza\u021bi unelte \u0219i echipamente care func\u021bioneaz\u0103 \u00een lini\u0219te;<\/p>\n<p>&#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Clientul poate interzice utilizarea anumitor unelte \u0219i echipamente din cauza zgomotului excesiv;<\/p>\n<p>&#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Uneltele \u0219i echipamentele trebuie men\u021binute \u00een stare de func\u021bionare;<\/p>\n<p>&#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00cen timpul func\u021bion\u0103rii, capacele generatoarelor, compresoarelor \u0219i altor echipamente vor fi \u00eenchise, iar echipamentul trebuie pozi\u021bionat c\u00e2t mai departe de cl\u0103dirile reziden\u021biale;<\/p>\n<p>&#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Defec\u021biunile care conduc la cre\u0219terea polu\u0103rii fonice trebuie remediate imediat.<\/td>\n<td width=\"113\">Compania de construc\u021bii<\/td>\n<td width=\"86\">Lucr\u0103ri de renovare<\/td>\n<\/tr>\n<tr>\n<td width=\"151\">Poluarea aerului zonei de renovare<\/td>\n<td width=\"404\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00cen timpul activit\u0103\u021bilor de renovare este necesar de a reduce praful prin pulverizare cu ap\u0103 \u0219i\/sau folosirea dispozitivelor pentru absorb\u021bia prafului<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Pentru transportarea oric\u0103rui alt material plin de praf la locul unde se desf\u0103\u0219oar\u0103 lucr\u0103ri, e necesar de a umezi sau acoperi \u00eenc\u0103rc\u0103tura<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Asigurarea cu mijloace \u0219i haine de protec\u021bie individual\u0103 adecvate \u0219.a.<\/td>\n<td width=\"113\">Compania de construc\u021bii<\/td>\n<td width=\"86\">Lucr\u0103ri de renovare<\/td>\n<\/tr>\n<tr>\n<td width=\"151\">Generarea de\u0219eurilor<\/td>\n<td width=\"404\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Identificarea \u0219i optimizarea c\u0103ilor \u015fi locurilor de colectare \u015fi depozitare pentru toate tipurile de de\u015feuri a\u015fteptate de la activit\u0103\u0163ile de demolare \u0219i renovare<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 De\u015feurile minerale de renovare vor fi separate de alte de\u015feuri \u015fi depozitate \u00een locuri\/containere adecvate, (!) \u00een special materiale ce con\u021bin azbest (MCA \u2013 g\u0103si\u021bi anexate <em>\u00cendrum\u0103ri privind materialele care con\u021bin azbest<\/em>)<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 De\u015feurile de renovare vor fi colectate \u015fi eliminate \u00een mod corespunz\u0103tor de c\u0103tre doar organiza\u0163iile autorizate<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00cenregistr\u0103rile de eliminare a de\u015feurilor vor fi men\u0163inute ca dovad\u0103 de bun\u0103 gestionare a de\u015feurilor<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Ori de c\u00e2te ori este posibil se recomand\u0103 re-utilizarea \u015fi reciclarea materialelor adecvate \u015fi viabile<\/td>\n<td width=\"113\">Compania de construc\u0163ii<\/td>\n<td width=\"86\">Lucr\u0103ri de renovare<\/td>\n<\/tr>\n<tr>\n<td width=\"151\">Impactul asupra siguran\u021bei \u0219i s\u0103n\u0103t\u0103\u021bii lucr\u0103torilor implica\u021bi \u00een lucr\u0103rile de renovare<\/td>\n<td width=\"404\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Organizarea \u0219antierului de renovare conform normelor \u0219i cerin\u021belor \u00een vigoare; Asigurarea condi\u021biilor (incl., facilit\u0103\u021bilor) privind siguran\u021ba \u0219i s\u0103n\u0103tatea ocupa\u021bional\u0103<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Instruirea angaja\u021bilor privind securitatea \u0219i s\u0103n\u0103tatea \u00een munc\u0103, asigurarea cu haine speciale de lucru \u0219i mijloace individuale de protec\u021bie<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Asigurarea instruirii subcontractorilor corespunz\u0103tor sarcinilor \u00eendeplinite la obiect<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Asigurarea marcajului special, instalarea semnelor informa\u021bionale \u015fi de avertizare \u00een zona de renovare \u015fi adiacent\u0103<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Asigurarea cu persoan\u0103 responsabil\u0103 de securitatea \u0219i s\u0103n\u0103tatea \u00een munc\u0103 pe \u0219antier; men\u021binerea registrelor \/documenta\u021biei de eviden\u021b\u0103 \u0219i control privind instruirile individuale \u0219i colective, accidente de produc\u021bie \u0219.a.<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Amenajarea de facilit\u0103\u021bi sanitare adecvate \u015fi locurilor de colectare a de\u0219eurilor menajere pentru lucr\u0103tori<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Asigurarea cu truse \u0219i mijloace de prim ajutor<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Asigurarea semnaliz\u0103rii efective pentru public \u0219i limitarea\/blocarea accesului \u00een zon\u0103 de lucr\u0103ri<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Asigurarea func\u021bion\u0103rii unui mecanism de reclama\u021bii pentru lucr\u0103tori, despre care vor fi informa\u021bi \u00een timpul instruirilor<\/td>\n<td width=\"113\">Compania de construc\u0163ii<\/td>\n<td width=\"86\">Lucr\u0103ri de renovare<\/td>\n<\/tr>\n<tr>\n<td width=\"152\"><strong>\u00a0<\/strong><\/td>\n<td width=\"151\">Impactul asupra securit\u0103\u021bii \u0219i s\u0103n\u0103t\u0103\u021bii lucr\u0103torilor din c\u0103minul renovat \u0219i studen\u021bilor.<\/td>\n<td width=\"404\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Asigurarea c\u0103 \u00een timpul lucr\u0103rilor de renovare \u0219i p\u00e2n\u0103 la finalizarea acestora to\u021bi lucr\u0103torii \u0219i studen\u021bii vor fi muta\u021bi temporar \u00eentr-un alt sediu.<\/td>\n<td width=\"113\">Managementul institu\u021biei de \u00eenv\u0103\u021b\u0103m\u00e2nt<\/td>\n<td width=\"86\">Lucr\u0103ri de renovare<\/td>\n<\/tr>\n<tr>\n<td width=\"152\">Lucr\u0103rile de construc\u021bii civile la scar\u0103 mic\u0103<\/td>\n<td width=\"151\">Impact privind condi\u021biile de munc\u0103<\/td>\n<td width=\"404\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Promovarea atitudinii echitabile \u0219i nediscriminatorii, \u0219i oportunit\u0103\u021bilor egale pentru to\u021bi lucr\u0103torii<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Stabilirea, men\u021binerea \u0219i \u00eembun\u0103t\u0103\u021birea managementului adecvat al personalului<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Respectarea \u0219i promovarea legisla\u021biei muncii<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Asigurarea condi\u021biilor sigure de munc\u0103 \u0219i protec\u021bie a lucr\u0103torilor implica\u021bi<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Evitarea utiliz\u0103rii muncii for\u021bate, interzicerea implic\u0103rii \u00een munc\u0103 a persoanelor cu v\u00e2rsta sub 18 ani<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Desemnarea persoanei responsabile pentru implementarea ac\u021biunilor de mediu \u0219i sociale \u0219i primirea \u00eendrum\u0103rilor \u0219i a instruc\u021biunilor din partea inginerului sau autorit\u0103\u021bilor<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Posibilitatea de a depune reclama\u021bii sau a de remite feedback de c\u0103tre lucr\u0103tori privind condi\u021biile de munc\u0103<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Toate contractele pentru lucr\u0103rile civile vor con\u021bine prevederi privind cerin\u021be de munc\u0103 \u00een conformitate cu legisla\u021bia na\u021bional\u0103 \u0219i cu ESS2 a B\u0103ncii Mondiale (g\u0103si\u021bi <em>\u00cendrum\u0103ri pentru contractele de lucr\u0103ri de construc\u021bii <\/em>anexate).<\/td>\n<td width=\"113\">Compania de construc\u0163ii<\/td>\n<td width=\"86\">Lucr\u0103ri de renovare<\/td>\n<\/tr>\n<tr>\n<td rowspan=\"3\" width=\"152\">Lucr\u0103rile de construc\u021bii civile la scar\u0103 mic\u0103<\/td>\n<td width=\"151\">Impactul asupra s\u0103n\u0103t\u0103\u021bii \u0219i siguran\u021bei comunit\u0103\u021bii<\/td>\n<td width=\"404\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Organizarea \u0219antierului conform normelor \u0219i cerin\u021belor \u00een vigoare; Asigurarea condi\u021biilor (incl., facilit\u0103\u021bilor) privind siguran\u021ba \u0219i s\u0103n\u0103tatea ocupa\u021bional\u0103<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Asigurarea semnaliz\u0103rii efective pentru public \u0219i limitarea\/blocarea accesului \u00een zon\u0103 de lucr\u0103ri<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Informarea privind normele de s\u0103n\u0103tate \u0219i securitate \u00een zona lucr\u0103rilor \u0219i \u00een apropierea \u0219antierului<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Plasarea informa\u021biilor despre lucr\u0103rile planificate, perioad\u0103 \u0219i m\u0103suri de atenuare propuse \u00een locurile vizibile sau panourile informative din zon\u0103<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 !!! \u00cen timpul lucr\u0103rilor de fa\u021bad\u0103 \u00een interiorul teritoriului \u0219i \u00een special \u00een zona intr\u0103rii principale, este necesar s\u0103 se instaleze semne de avertizare (sau un gard portabil u\u0219or din plas\u0103 de renovare de culoare str\u0103lucitoare) pentru siguran\u021ba oamenilor.<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u015eantierul va fi \u00eengr\u0103dit pentru a preveni accesul neautorizat. Munca muncitorilor din construc\u021bii va fi organizat\u0103 astfel \u00eenc\u00e2t s\u0103 se evite crearea de obstacole \u00een calea siguran\u021bei at\u00e2t a lucr\u0103torilor, c\u00e2t \u0219i a publicului.<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Oferirea unui mecanism de reclama\u021bii, propuneri, solicit\u0103ri de informa\u021bie etc. Datele de contact al acestui mecanism vor fi plasate pe panoul informativ de la \u0219antier.<\/td>\n<td width=\"113\">Compania de construc\u0163ii, EMP,<\/p>\n<p>USM<\/td>\n<td width=\"86\">Lucr\u0103ri de renovare<\/td>\n<\/tr>\n<tr>\n<td width=\"151\">Incidente \u0219i accidente<\/td>\n<td width=\"404\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Contractorul va informa \u00een aceea\u0219i zi Universitatea, care la r\u00e2ndul s\u0103u va informa EMP despre orice incidente sau accidente pe \u0219antier.<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 EMP va informa Banca Mondial\u0103 \u00een termen de nu mai mult de 48 de privind incidentul sau accidentul \u00eent\u00e2mplat \u0219i m\u0103surile propuse a fi \u00eentreprinse.<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Se va efectua raportarea incidentelor, investigarea \u0219i solu\u021bionarea neconformit\u0103\u021bii.<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Elaborarea \u0219i implementarea\u00a0 ac\u021biunilor necesare pentru minimizarea sau \u00eenl\u0103turarea efectelor incidentelor sau accidentelor produse, cum ar fi:<\/p>\n<p>&#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Toate lucr\u0103rile vor fi efectuate \u00een conformitate cu cerin\u021bele de securitate a muncii.<\/p>\n<p>&#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 For\u021ba de munc\u0103 va fi instruit\u0103 cu privire la ac\u021biunile de \u00eentreprins \u00een caz de urgen\u021b\u0103.<\/p>\n<p>&#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Se vor furniza materiale de prim ajutor la fa\u021ba locului, iar lucr\u0103torii vor fi familiariza\u021bi cu procedurile de prim ajutor.<\/p>\n<p>&#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Echipamentele mobile cu vizibilitate limitat\u0103 \u00een spate trebuie s\u0103 fie echipate cu alarme sonore de rezerv\u0103.<\/p>\n<p>&#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Fiecare operator de echipament mobil va lucra cu un semnalizator pentru a gestiona mi\u0219carea echipamentului.<\/p>\n<p>&#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Contractorul va marca toate dispozitivele electrice \u0219i liniile sub tensiune cu semne de avertizare.<\/p>\n<p>&#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Contractorul trebuie s\u0103 marcheze rutele de evacuare a incendiilor \u0219i s\u0103 instruiasc\u0103 lucr\u0103torii cu privire la evacuarea de urgen\u021b\u0103 din terminal \u00een cazul unui incendiu.<\/p>\n<p>&#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Antrenamentele \u0219i exerci\u021biile vor fi efectuate \u00een mod regulat.<\/p>\n<p>&#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Specialistul \u00een securitate \u0219i s\u0103n\u0103tate \u00een munc\u0103 angajat de Antreprenor va fi responsabil pentru implementarea m\u0103surilor de atenuare.<\/td>\n<td width=\"113\">Compania de construc\u0163ii, EMP,<\/p>\n<p>USM<\/td>\n<td width=\"86\">Lucr\u0103ri de renovare<\/td>\n<\/tr>\n<tr>\n<td width=\"151\">Violen\u021b\u0103 bazat\u0103 pe gen \u0219i agresiune verbal\u0103 sau sexual\u0103<\/td>\n<td width=\"404\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Instruirea lucr\u0103torilor privind aspectele de violen\u021b\u0103 \u0219i h\u0103r\u021buire<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Adoptarea unui cod de conduit\u0103 de c\u0103tre lucr\u0103tori (poate fi utilizat modelul din <em>Procedurile de gestionare a for\u021bei de munc\u0103, <\/em>elaborate pentru proiect)<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Instruirea lucr\u0103torilor privind codul de conduit\u0103 \u0219i etic\u0103<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Punere la dispozi\u021bie a mecanismului de reclama\u021bii pentru lucr\u0103torii implica\u021bi \u00een renovare \u0219i pentru comunitate.<\/td>\n<td width=\"113\">Compania de construc\u0163ii, USM, EMP,<\/td>\n<td width=\"86\">Lucr\u0103ri de renovare<\/td>\n<\/tr>\n<tr>\n<td width=\"152\">&nbsp;<\/td>\n<td width=\"151\">Conflicte sociale<\/td>\n<td width=\"404\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Dac\u0103 va fi necesar, \u00eentreruperea temporar\u0103 a aliment\u0103rii cu energie electric\u0103 \u0219i\/sau alimentarea centralizat\u0103 cu ap\u0103 la \u0219antier, iar \u00een cazul \u00een care aceasta impune suspendarea temporar\u0103 a serviciilor c\u0103tre alte cl\u0103diri, popula\u021bia local\u0103 din zonele cu sisteme inginere\u0219ti conectate trebuie informat\u0103 (avertizat) \u00een mod corespunz\u0103tor \u00een prealabil. Reziden\u021bii \u0219i reprezentan\u021bii \u00eentreprinderilor, institu\u021biilor \u0219i organiza\u021biilor trebuie s\u0103 aib\u0103 suficient timp pentru a se preg\u0103ti pentru suspendarea temporar\u0103 a utilit\u0103\u021bilor.<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Asigurarea implement\u0103rii adecvate a Mecanismului de solu\u021bionare a pl\u00e2ngerilor la nivel local.<\/td>\n<td width=\"113\">Compania de construc\u021bii<\/td>\n<td width=\"86\">Lucr\u0103ri de renovare<\/td>\n<\/tr>\n<tr>\n<td width=\"152\">Transport materiale \u0219i utilaj<\/td>\n<td width=\"151\">Impact urmare aglomer\u0103rii traficului \u0219i acces \u00eengreunat sau restric\u021bionat<\/td>\n<td width=\"404\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Identificarea \u0219i stabilirea c\u0103ilor de trafic\/acces specializat \u00een aria obiectivului; instalarea barierelor \u0219i indicatoarelor de trafic; c\u0103ile de transport vor fi clar vizibile, iar publicul va fi avertizat de toate pericolele poten\u021biale prin semne speciale instalate<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Implementarea m\u0103surilor de management adecvat al traficului; instruirea personalului angajat \u00een trafic, \u00een special pentru accesul pe \u0219antier \u0219i traficul de tonaj mare \u00een apropierea locului; amenajarea de pasaje \u0219i treceri sigure pentru pietoni<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Ajustarea programului de transport materiale la programul local de trafic, de ex. evit\u00e2nd activit\u0103\u021bile majore de transport \u00een timpul orelor de v\u00e2rf sau orelor de circula\u021bie a popula\u021biei locale \u0219.a.<\/td>\n<td width=\"113\">Compania de construc\u021bii<\/td>\n<td width=\"86\">Lucr\u0103ri de renovare<\/td>\n<\/tr>\n<tr>\n<td width=\"152\">&nbsp;<\/td>\n<td width=\"151\">Securitatea comunit\u0103\u021bii<\/td>\n<td width=\"404\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Ma\u0219inile care transport\u0103 materiale \u0219i echipamente vor fi acoperite corespunz\u0103tor, \u00een vederea evit\u0103rii c\u0103derilor accidentale a echipamentelor \u0219i materialelor transportate.<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Organizarea securit\u0103\u021bii nonstop la \u0219antier (materiale de construc\u021bie \u0219i echipamente \u00een curte), sau asigurarea depozit\u0103rii corespunz\u0103toare a materialelor \u0219i echipamentelor de construc\u021bie pentru a preveni accesul neautorizat.<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Zona \u00eenconjur\u0103toare (curtea cl\u0103dirii) trebuie p\u0103strat\u0103 curat\u0103, f\u0103r\u0103 eliminarea de\u0219eurilor. De\u0219eurile trebuie colectate \u0219i \u00eendep\u0103rtate imediat din curte (depozitate \u00een locuri desemnate pentru depozitare temporar\u0103) pentru a preveni poten\u021bialele r\u0103ni.<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Zona de \u0219antier trebuie s\u0103 fie iluminat\u0103 pe timp de noapte.<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00centre\u021binerea regulat\u0103 a vehiculelor pentru a minimiza riscul de accidente poten\u021bial grave cauzate de defec\u021biuni ale echipamentelor sau defec\u021biuni premature.<\/td>\n<td width=\"113\">Compania de construc\u021bii \u0219i alte companii subcontractate<\/td>\n<td width=\"86\">La transportarea echipamentelor \u0219i materialelor<\/td>\n<\/tr>\n<tr>\n<td width=\"152\">&nbsp;<\/td>\n<td width=\"151\">Securitatea lucr\u0103torilor<\/td>\n<td width=\"404\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Ma\u0219inile vor fi conduse de \u0219oferi cu calific\u0103rile \u0219i certificatele corespunz\u0103toare, instrui\u021bi privind transportarea echipamentelor \u0219i materialelor \u00een condi\u021bii de siguran\u021b\u0103 pentru comunitate \u0219i la momentul \u00eenc\u0103rc\u0103rii \u0219i desc\u0103rc\u0103rii echipamentelor \u0219i materialelor.<\/td>\n<td width=\"113\">Compania de renovare \u0219i alte companii subcontractate<\/td>\n<td width=\"86\">La \u00eenc\u0103rcarea, transportarea \u0219i desc\u0103rcarea echipamentelor \u0219i materialelor<\/td>\n<\/tr>\n<tr>\n<td width=\"152\">&nbsp;<\/td>\n<td width=\"151\">Utilizarea terenurilor private pentru orice lucrare din cadrul proiectului, precum \u0219i pentru depozitarea materialelor sau echipamentelor de construc\u021bie.<\/td>\n<td width=\"404\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Contractorul va lua toate m\u0103surile necesare pentru a preveni utilizarea terenurilor private pentru proiect.<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Pentru a preveni utilizarea terenurilor private pentru proiect, contractorul va efectua o monitorizare regulat\u0103.<\/td>\n<td width=\"113\">Compania de construc\u021bii<\/td>\n<td width=\"86\">Lucr\u0103ri de renovare<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p><strong><em>\u00a0<\/em><\/strong><\/p>\n<p><strong><em>Riscuri de mediu \u0219i sociale \u0219i m\u0103suri de atenuare \u00een etapa opera\u021bional\u0103<\/em><\/strong><\/p>\n<p><strong><em>\u00a0<\/em><\/strong><\/p>\n<table width=\"907\">\n<thead>\n<tr>\n<td width=\"152\"><strong>Activitate<\/strong><\/td>\n<td width=\"151\"><strong>Risc \u0219i impact poten\u021bial<\/strong><\/td>\n<td width=\"404\"><strong>M\u0103suri de prevenire \u0219i minizare propuse<\/strong><\/td>\n<td width=\"113\"><strong>Responsabil de m\u0103suri<\/strong><\/td>\n<td width=\"86\"><strong>Perioada<\/strong><\/td>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td width=\"152\">Operare<\/td>\n<td width=\"151\">Prevenirea situa\u021biilor de urgen\u021b\u0103<\/td>\n<td width=\"404\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Existen\u021ba unor proceduri scrise pentru cazuri de urgen\u021b\u0103. Men\u021binerea sub control a situa\u021biei de urgen\u021b\u0103 \u0219i a riscurilor \u0219i asigurarea personalului competent s\u0103 reac\u021bioneze \u00een caz de urgen\u021b\u0103.<\/td>\n<td width=\"113\">Managementului c\u0103minului<\/td>\n<td width=\"86\">Operare<\/td>\n<\/tr>\n<tr>\n<td width=\"152\">Operare<\/td>\n<td width=\"151\">S\u0103n\u0103tate \u0219i siguran\u021b\u0103<\/td>\n<td width=\"404\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Asigurarea controlului medical periodic al personalului \u0219i evaluarea riscurilor spa\u021biilor de lucru.<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Instruirea personalului, \u00een conformitate cu legea nr. 186 \u0219i asigurarea unui mecanism de sugestii \u0219i propuneri pentru angaja\u021bi, inclusiv privind aspectele SSM.<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Instruirea \u0219i informarea periodic\u0103 a studen\u021bilor privind s\u0103n\u0103tatea \u0219i siguran\u021ba pe durata afl\u0103rii \u00een c\u0103min.<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Oferirea unui mecanism de sugestii pentru studen\u021bi.<\/td>\n<td width=\"113\">Managementul c\u0103minului<\/td>\n<td width=\"86\">Operare<\/td>\n<\/tr>\n<tr>\n<td width=\"152\">Operare<\/td>\n<td width=\"151\">Conflicte sociale<\/td>\n<td width=\"404\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Instruirea \u0219i informarea studen\u021bilor privind normele de conduit\u0103 \u0219i comportament, f\u0103r\u0103 a afecta sau\u00a0 intra \u00een conflict cu persoanele care locuiesc sau lucreaz\u0103 \u00een apropierea c\u0103minului.<\/p>\n<p>\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Asigurarea implement\u0103rii unui mecanism de recalma\u021bii, sugestii \u0219i feedback disponibil at\u00e2t pentru locuitorii c\u0103minului c\u00e2t \u0219i pentru persoanele din apropierea c\u0103minului.<\/td>\n<td width=\"113\">Managementul c\u0103minului<\/p>\n<p>Studen\u021bii reziden\u021bi ai c\u0103minului<\/td>\n<td width=\"86\">Operare<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong><em>\u00a0<\/em><\/strong><\/p>\n<p><strong><em>\u00a0<\/em><\/strong><\/p>\n<p><strong><em>\u00a0<\/em><\/strong><\/p>\n<p><strong><em>Not\u0103:<\/em><\/strong> Prezenta <em>list\u0103 de m\u0103suri<\/em> poate fi revizuit\u0103, ajustat\u0103 \u0219i actualizat\u0103 pe parcursul realiz\u0103rii activit\u0103\u021bilor preconizate.<\/p>\n<p>&nbsp;<\/p>\n<ol start=\"5\">\n<li><a name=\"_Toc147737875\"><\/a><a name=\"_Toc184731092\"><\/a><strong> CADRU DE IMPLEMENTARE<\/strong><\/li>\n<\/ol>\n<p><a name=\"_Toc184731093\"><\/a><a name=\"_Toc147737877\"><\/a><strong>5.1. Cadrul Institu\u021bional al Implement\u0103rii <\/strong><strong>Subproiectului<\/strong><\/p>\n<p>Echipa de Management a Proiectului (EMP) creat\u0103 \u00een cadrul MEC este responsabil\u0103 de implementarea P\u00ceSM. Totu\u0219i, urmare semn\u0103rii contractului de grant cu USM, gestionarea general\u0103 a implement\u0103rii subproiectului va fi responsabilitatea echipei delegate de c\u0103tre USM pentru implementarea subproiectului. Echipa USM de gestionare a subproiectului va fi responsabil\u0103 de planificarea activit\u0103\u021bilor la etapa de proiectare \u00een vederea minimiz\u0103rii riscurilor \u0219i impacturilor de mediu \u0219i sociale \u0219i de monitorizarea Contractorului pe durata desf\u0103\u0219ur\u0103rii lucr\u0103rilor. Echipa de gestionare a c\u0103minului va a sigura m\u0103surile necesare pe durata func\u021bion\u0103rii c\u0103minului. EMP va men\u021bine rolul de ghidare \u0219i monitorizare privind implementarea m\u0103surilor prev\u0103zute \u00een acest PMMS pe durata etapei de \u00eenainte de construc\u021bie \u0219i pe durata desf\u0103\u0219ur\u0103rii lucr\u0103rilor de renovare.<\/p>\n<p><strong>Rolul supraveghetorilor tehnici\u00a0 <\/strong><\/p>\n<p>Vor fi angaja\u021bi mai mul\u021bi consultan\u021bi responsabili de supravegherea tehnic\u0103 \u00een dependen\u021b\u0103 de domeniul lucr\u0103rilor, cum ar fi de exemplu construc\u021bii civile, ap\u0103 \u0219i canalizare \u0219i re\u021bele inginere\u0219ti. Consultan\u021bilor li se vor atribui responsabilit\u0103\u021bi inclusiv de gestionarea poten\u021bialelor riscuri \u0219i impacturi prin aplicarea m\u0103surilor prev\u0103zute \u00een acest PMMS \u0219i PMMS care va fi elaborat de Contractor.<\/p>\n<p>Consultan\u021bii vor realiza printre altele urm\u0103toarele activit\u0103\u021bi:<\/p>\n<ul>\n<li>Vor superviza calitatea lucr\u0103rilor inclusiv, \u00een acord cu Legea nr. 721\/1996 privind calitatea \u00een construc\u021bii, va furniza date necesare pentru stabilirea m\u0103surilor de igien\u0103, s\u0103n\u0103tate \u0219i securitate \u00een munc\u0103, pentru siguran\u021ba \u0219i protec\u021bia mediului (potrivit Cerin\u021bei D) dar \u0219i pentru m\u0103surile privind zgomotul (potrivit Cerin\u021bei F)<\/li>\n<li>Vor furniza date detaliate privind sursele de ap\u0103 \u0219i interferen\u021bele cu re\u021belele actuale (poten\u021biale \u00eentreruperi ale furniz\u0103rii de utilit\u0103\u021bi \u00een zon\u0103)<\/li>\n<li>Vor fi responsabil de organizarea de \u0219antier (incluz\u00e2nd detalii privind managementul de\u0219eurilor, canalizarea pe parcursul lucr\u0103rilor, spa\u021biile de masa \u0219i odihn\u0103, semnaliz\u0103rile de siguran\u021b\u0103 \u0219i s\u0103n\u0103tate, panoul de identificare a investi\u021biei \u0219i cutia pentru peti\u021bii);<\/li>\n<li>Vor verifica respectarea normelor de siguran\u021b\u0103 \u0219i protec\u021bie a muncii pe \u0219antier.<\/li>\n<li>Vor monitoriza impacturile sociale \u0219i de mediu ale lucr\u0103rilor \u0219i implementarea m\u0103surilor de diminuare prev\u0103zute \u00een \u201ePlanul de Management de Mediu \u0219i Social (PMMS) \u2013 Lista de Verificare.\u201d<\/li>\n<li>Vor verifica modul de colectare, \u00eenregistrare \u0219i solu\u021bionare a reclama\u021biilor.<\/li>\n<li>Vor asigura secretariatului recep\u021biei \u0219i \u00eentocmirea actelor de recep\u021bie.<\/li>\n<li>Vor urm\u0103ri solu\u021bionarea obiec\u021biilor cuprinse \u00een anexele la procesul-verbal de recep\u021bie la terminarea lucr\u0103rilor \u0219i realizarea recomand\u0103rilor comisiei de recep\u021bie.<\/li>\n<\/ul>\n<p>Consultantul social \u0219i de mediu ai EMP vor fi implica\u021bi \u00een \u00eent\u00e2lnirile periodice cu antreprenorul\/proiectantul \u0219i vor participa \u00eempreun\u0103 la inspec\u021bii si vizite pe \u0219antier, vor monitoriza implementarea prevederilor PMMS \u0219i vor modifica\/actualiza PMMS (daca va fi nevoie) \u00een baza detaliilor \u0219i specifica\u021biilor ce vor ap\u0103rea pe parcursul fazei de implementare. Consultarea public\u0103 este de asemenea planificat\u0103 \u00eenainte de ini\u021bierea lucr\u0103rilor, permi\u021b\u00e2nd participarea publicului \u00een procesul de consultare.<\/p>\n<p><strong>Rolul speciali\u0219tilor de mediu \u0219i social<\/strong><\/p>\n<p>Speciali\u0219tii de mediu \u0219i social din cadrul EMP vor fi responsabili de coordonarea \u0219i supervizarea m\u0103surilor cuprinse \u00een planurile de mediu \u0219i social precum \u0219i de gestionarea riscurilor de mediu \u0219i social implicate. Speciali\u0219tii vor lucra \u00een colaborare cu personalul cu rol de supervizare implicat \u00een proiect precum \u0219i cu echipa tehnic\u0103 \u0219i vor realiza urm\u0103toarele activit\u0103\u021bi:<\/p>\n<ol>\n<li>diseminarea recomand\u0103rilor de management de mediu \u0219i social existente \u0219i elaborarea de recomand\u0103ri pentru situa\u021biile care sunt reglementate de normele \u00een vigoare, \u00een concordan\u021b\u0103 cu standardele B\u0103ncii pentru implementarea, monitorizarea \u0219i evaluarea m\u0103surilor de atenuare a impactului asupra mediului;<\/li>\n<li>se vor asigura c\u0103 contractele pentru lucr\u0103rile de construire \u0219i furnizare de echipamente includ specifica\u021bii conforme cu normativele \u0219i standardele corespunz\u0103toare;<\/li>\n<li>realizeaz\u0103 periodic vizite la \u0219antier, aprob\u0103 planurile \u0219i monitorizeaz\u0103 respectarea lor.<\/li>\n<li>asigur\u0103 uniformitatea \u00een toate activit\u0103\u021bile legate de preg\u0103tirea \u0219i implementarea PMMS;<\/li>\n<li>revizuie \u0219i vin cu recomand\u0103ri la planul de management de mediu \u0219i social elaborat de contractor \u00eenainte de \u00eenceperea lucr\u0103rilor;<\/li>\n<li>p\u0103streaz\u0103 contact permanent cu speciali\u0219tii \u00een protec\u021bia mediului \u0219i social ai B\u0103ncii Mondiale \u0219i solicit\u0103 sfaturi cu privire la orice problem\u0103 care necesit\u0103 \u00eendrum\u0103ri cu privire la activitatea \u00een domeniu;<\/li>\n<li>ofer\u0103 suport USM \u0219i contractorului privind implicarea p\u0103r\u021bilor implicate \u0219i gestionarea mecanismului de solu\u021bionare a reclama\u021biilor pentru lucr\u0103tori \u0219i comunitate;<\/li>\n<li>ofer\u0103 suport \u00een desf\u0103\u0219urarea instruirilor legate de condi\u021biile de munc\u0103 \u0219i exploatarea sexual\u0103 \u0219i abuz \u0219i agresiunea sexual\u0103;<\/li>\n<li>elaboreaz\u0103 rapoarte periodice \u00een baza constat\u0103rilor de pe \u0219antier, dar \u0219i \u00een baza rapoartelor lunare ale contractorului.<\/li>\n<\/ol>\n<p><strong>Rolul Contractorului<\/strong><\/p>\n<ul>\n<li><a name=\"_Toc50117202\"><\/a><a name=\"_Toc50122643\"><\/a> Responsabilul pentru lucr\u0103ri va fi responsabil pentru implementarea cerin\u021belor PMMS. \u00cen consecin\u021b\u0103, el va elabora un Plan de Management de Mediu \u0219i Social al Contractorului pentru perioada de construc\u021bie (C-ESMP) bazat pe versiunea final\u0103 a PMMS p\u00e2n\u0103 la \u00eenceperea lucr\u0103rilor. C-ESMP va fi aprobat de USM \u00een coordonare cu EMP. Contractorul va implementa ulterior PMMS al Contractorului sub \u00eendrumarea \u0219i monitorizarea USM \u0219i a PMT.<\/li>\n<li>Formeaz\u0103 costul serviciilor \u021bin\u00e2nd cont de m\u0103surile de atenuare a impacturilor de mediu \u0219i sociale prev\u0103zute \u00een acest PMMS, pentru care este responsabil de implementare;<\/li>\n<li>Desf\u0103\u0219oar\u0103 lucr\u0103rile \u00een conformitate cu standardele de mediu \u0219i sociale ale B\u0103ncii Mondiale;<\/li>\n<li>Asigur\u0103 implementarea Planului de management de mediu \u0219i social detaliat elaborat pentru faza de construc\u021bie.<\/li>\n<\/ul>\n<p><em>S\u0103n\u0103tatea Ocupa\u021bional\u0103 \u0219i Siguran\u021ba la Locul De Munc\u0103<\/em><\/p>\n<p>Contractorul are obliga\u021bia s\u0103 asigure toate echipamentele \u0219i materialele de protec\u021bie, iar muncitorii au obliga\u021bia de a utiliza toate aceste echipamente de protec\u021bie \u2013 c\u0103\u0219ti, m\u0103nu\u0219i, ochelari de protec\u021bie acolo unde este cazul \u0219i echipamente de lucru. Toate aceste reguli minime de protec\u021bie, corelate cu evitarea epuiz\u0103rii muncitorilor, au rolul de a preveni problemele legate de ergonomia muncii precum \u0219i alte accidente de munc\u0103 rezultate din manevrarea manual\u0103 repetitiv\u0103 \u0219i excesiv\u0103 a materialelor de renovare.<\/p>\n<p>Recomand\u0103rile pentru preven\u021bia \u0219i controlul acestora includ cunoa\u0219terea cauzelor generale ale accidentelor \u00een construc\u021bii \u0219i minimizarea lor prin:<\/p>\n<ul>\n<li>Instruirea muncitorilor cu privire la ridicarea \u0219i manevrarea materialelor, tehnicile folosite \u00een lucr\u0103rile de repara\u021bie, inclusiv stabilirea de limite de greutate peste care asisten\u021ba mecanic\u0103 este recomandat\u0103.<\/li>\n<li>Planificarea \u0219antierului astfel \u00eenc\u00e2t s\u0103 fie minimizat\u0103 nevoia de deplasare manual\u0103 a obiectelor grele.<\/li>\n<li>Selectarea de utilaje \u0219i proiectarea locurilor de munc\u0103 astfel \u00eenc\u00e2t s\u0103 se reduc\u0103 nevoia de a folosi for\u021ba fizic\u0103.<\/li>\n<li>Implementarea \u00een procesele de munc\u0103 a unor p\u00e2rghii administrative cum ar fi rota\u021bia posturilor \u0219i pauzele pentru odihn\u0103.<\/li>\n<\/ul>\n<p><em>Planul de S\u0103n\u0103tate \u0219i Securitate \u00een Munc\u0103 (PSSM) \u0219i Planul pentru Situa\u021bii de Urgen\u021b\u0103 (PSU) ale Constructorului<\/em><\/p>\n<p>Contractorul va trebui s\u0103 \u00eentocmeasc\u0103 un Plan de S\u0103n\u0103tate \u0219i Securitate \u00een Munc\u0103 (PSSM) \u0219i un Plan pentru Situa\u021bii de Urgen\u021b\u0103 (PSU) pentru a-\u0219i proteja angaja\u021bii pe parcursul lucr\u0103rilor pe care le va desf\u0103\u0219ura. PMMS-C va fi luat \u00een considerare la \u00eentocmirea PSSM \u0219i a PSU ale constructorului. Controalele de mediu \u0219i nivelele de expunere asociate cu protec\u021bia muncitorilor vor fi incluse \u00een PMMS-C. Practicile \u00een munc\u0103 recomandate \u00een PMMS nu pot fi menite s\u0103 compromit\u0103 s\u0103n\u0103tatea \u0219i siguran\u021ba \u00een nici un fel. Fiecare PSS \u0219i PRU vor fi aprobate de dirigintele de \u0219antier \u00eenainte de \u00eenceperea lucr\u0103rilor, astfel \u00eenc\u00e2t sa fie asigurate proceduri \u0219i controale de s\u0103n\u0103tate \u0219i siguran\u021b\u0103 \u00een conformitate cu lucr\u0103rile ce vor fi desf\u0103\u0219urate.<\/p>\n<p>Speciali\u0219tii de mediu \u0219i social ai EMP sunt direct responsabili de implementarea PMMS \u00een toate fazele proiectului. Multe din responsabilit\u0103\u021bile de aplicare a m\u0103surilor de atenuare sunt \u00een responsabilitatea contractorului, \u00eensemn\u00e2nd c\u0103 speciali\u0219tii\u00a0 sociali \u0219i de mediu vor trebui s\u0103 supervizeze \u0219i monitorizeze implementarea lor, fie direct (de exemplu prin vizite la \u0219antier, vizite de monitorizare) sau prin intermediari, cum ar fi USM sau supraveghetorul tehnic.<\/p>\n<p>Banca Mondial\u0103 desf\u0103\u0219oar\u0103 supraveghere \u0219i control general pentru a asigura conformitatea cu standardele de mediu \u0219i sociale \u00een timpul implement\u0103rii subproiectului.<\/p>\n<p><a name=\"_Toc147737879\"><\/a><a name=\"_Toc184731094\"><\/a><strong>5.2. Consolidarea Competen\u021belor \u0219i Instruirea personalului<\/strong><\/p>\n<p>Instruiri ini\u021biale \u0219i periodice specifice vor fi desf\u0103\u0219urate cu echipa USM, Contractorului selectat \u0219i supraveghetorul tehnic privind implementarea PMMS.<\/p>\n<p>Referitor la competen\u021bele speciali\u0219tilor de mediu \u0219i social din echipa de implementare a proiectului coachingul \u0219i trainingul vor fi realizate de BM prin consultan\u021bii social \u0219i de mediu implica\u021bi \u00een elaborarea Planului cadru de monitorizare de mediu \u0219i social\u0103 al proiectului.<\/p>\n<ol start=\"6\">\n<li><a name=\"_Toc184731095\"><\/a> <strong>MONITORIZAREA \u0218I RAPORTAREA PMMS<\/strong><\/li>\n<\/ol>\n<p><strong>Integrarea PMMS \u00een documentele proiectului<\/strong>. Cerin\u021bele PMMS vor fi incluse \u00een contractul de execu\u021bie a lucr\u0103rilor de renovare sub aspectul activit\u0103\u021bilor propuse, at\u00e2t \u00een specifica\u021bii c\u00e2t \u0219i \u00een listele de cantit\u0103\u021bi. Mai mult, i se va solicita contractorului s\u0103 includ\u0103 costurile asociate implement\u0103rii \u0219i monitoriz\u0103rii m\u0103surilor din PMMS \u00een ofertele lor financiare \u0219i s\u0103 respecte cerin\u021bele PMMS \u00een implementarea activit\u0103\u021bilor sub-proiectului.<\/p>\n<p>Implementarea PMMS va fi supervizat\u0103 de Specialistul de mediu \u0219i social \u0219i de membrii EMP periodic (a\u0219a cum este prev\u0103zut \u00een planul de monitorizare), precum \u0219i de c\u0103tre BM (\u00een timpul misiunilor de supervizare) \u0219i de c\u0103tre inspectorii de mediu locali. Drept urmare, speciali\u0219tii social \u0219i de mediu vor prezenta B\u0103ncii de dou\u0103 ori pe an informa\u021bii detaliate privind implementarea PMMS ca parte a rapoartelor de progres.<\/p>\n<p>\u00cen baza planului de realizare a lucr\u0103rilor care va fi prezentat de contractor se va stabili planul de monitorizarea a respect\u0103rii cerin\u021belor de mediu \u0219i sociale, inclusiv prev\u0103zute \u00een acest PMMS. M\u0103surile de gestionare propuse \u00een planul de monitorizare social\u0103 \u0219i de mediu vor fi realizate de entit\u0103\u021bile responsabile pe parcursul implement\u0103rii sub-proiectului, pentru a verifica implementarea corespunz\u0103toare a acestor m\u0103suri.<\/p>\n<p>Monitorizarea va avea \u00een vedere urm\u0103toarele:<\/p>\n<ul>\n<li>va urm\u0103ri \u0219i va raporta eficien\u021ba m\u0103surilor si responsabilit\u0103\u021bilor de atenuare identificate \u0219i realizate;<\/li>\n<li>va informa despre nevoia de extindere, intensificare sau ajustare a m\u0103surilor de atenuare;<\/li>\n<li>va identifica orice noi arii poten\u021bial expuse impactului de mediu si social care nu au fost luate \u00een considerare \u00een PMMS.<\/li>\n<\/ul>\n<p>Monitorizarea va \u00eencepe odat\u0103 cu lucr\u0103rile de renovare \u0219i va fi implementat\u0103 \u00een toate fazele proiectului.<\/p>\n<p>Mai jos este propus un plan de monitorizare social \u0219i de mediu general pentru acest sub-proiect, care va fi ajustat \u00een baza planului de lucru prezentat de Contractor, totodat\u0103, entitatea contractata pentru executarea lucr\u0103rilor \u00eel va avea in vedere \u00een dezvoltarea unui plan al Constructorului (C-PMMS) care va include activit\u0103\u021bi de monitorizare detaliate pentru interven\u021biile specifice din cadrul proiectului conform planific\u0103rii detaliate a proiectului.<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>Planul de Monitorizare de Mediu \u0219i Social<\/strong><\/p>\n<p>&nbsp;<\/p>\n<table width=\"954\">\n<thead>\n<tr>\n<td width=\"180\"><strong>M\u0103suri E&amp;S\/<\/strong><\/p>\n<p><strong>Parametrii<\/strong><\/td>\n<td width=\"283\"><strong>Ac\u021biuni de monitorizare<\/strong><\/td>\n<td width=\"180\"><strong>Frecven\u021ba monitoriz\u0103rii<\/strong><\/td>\n<td width=\"113\"><strong>Cost<\/strong><\/td>\n<td width=\"198\"><strong>Responsabilitatea institu\u021bional\u0103 pentru monitorizare<\/strong><\/td>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td colspan=\"5\" width=\"954\"><strong>Pre-Construc\u021bie<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"180\">Management general E&amp;S<\/td>\n<td width=\"283\">PMMS al Contractorului a fost elaborat \u0219i aprobat<\/td>\n<td width=\"180\">O dat\u0103 (\u00eenainte de lucr\u0103rile de construc\u021bie)<\/td>\n<td width=\"113\">Componenta managementul proiectului<\/td>\n<td width=\"198\">Speciali\u0219tii Mediu \u0219i social ai EMP<\/td>\n<\/tr>\n<tr>\n<td width=\"180\">Proiectare<\/td>\n<td width=\"283\">Designul detaliat \u00eencorporeaz\u0103 perspectivele comunit\u0103\u021bii din consult\u0103ri \u0219i caracteristici specifice de siguran\u021b\u0103 pentru siguran\u021ba comunit\u0103\u021bii;<\/td>\n<td width=\"180\">O dat\u0103 (\u00eenainte de lucr\u0103rile de construc\u021bie)<\/td>\n<td width=\"113\">Din propriile surse ale USM<\/td>\n<td width=\"198\">EMP<\/td>\n<\/tr>\n<tr>\n<td colspan=\"5\" width=\"954\">Lucr\u0103ri de construc\u021bie\/demolare<\/td>\n<\/tr>\n<tr>\n<td rowspan=\"5\" width=\"180\">S\u0103n\u0103tatea \u0219i siguran\u021ba comunit\u0103\u021bii<\/td>\n<td width=\"283\">Elemente de siguran\u021b\u0103 comunitar\u0103 existente pe \u0219antierele de construc\u021bii\/demolare;<\/td>\n<td width=\"180\">O dat\u0103 (\u00eenainte de \u00eenceperea lucr\u0103rilor) \u0219i \u00een timpul vizitelor la \u0219antier<\/td>\n<td width=\"113\">Contract cu firma de construc\u021bii<\/td>\n<td width=\"198\">Speciali\u0219tii Mediu \u0219i social ai EMP<\/p>\n<p>&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"283\">Reclama\u021bii \u00eenregistrate pe \u0219antier\/din alte canale \u0219i accidente \u00eenregistrate \u0219i solu\u021bionarea acestora;<\/td>\n<td width=\"180\">S\u0103pt\u0103m\u00e2nal<\/p>\n<p>&nbsp;<\/td>\n<td width=\"113\">Contract cu firma de construc\u021bii<\/td>\n<td width=\"198\">EMP<\/p>\n<p>&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"283\">Raport privind s\u0103n\u0103tatea \u0219i securitatea comunit\u0103\u021bii;<\/td>\n<td width=\"180\">Lunar<\/p>\n<p>&nbsp;<\/td>\n<td width=\"113\">Contract cu firma de construc\u021bii<\/p>\n<p>Contract cu consultan\u021bii supraveghere<\/td>\n<td width=\"198\">Contractor<\/p>\n<p>Consultan\u021bii supraveghere<\/td>\n<\/tr>\n<tr>\n<td width=\"283\">Ac\u021biuni de con\u0219tientizare a siguran\u021bei comunitare implementate;<\/td>\n<td width=\"180\">O dat\u0103 (\u00eenaintea lucr\u0103rilor de construc\u021bie) \u0219i conform planurilor convenite<\/td>\n<td width=\"113\">Componenta managementul proiectului<\/td>\n<td width=\"198\">Specialist EMP \u00een implicarea comunit\u0103\u021bii\/aspecte sociale<\/td>\n<\/tr>\n<tr>\n<td width=\"283\">Note informative privind programul de lucru distribuite p\u0103r\u021bilor interesate afectate;<\/td>\n<td width=\"180\">O dat\u0103 (\u00eenainte de lucr\u0103rile de construc\u021bie)<\/td>\n<td width=\"113\">Componenta managementul proiectului<\/td>\n<td width=\"198\">Specialist EMP \u00een implicarea comunit\u0103\u021bii\/aspecte sociale<\/td>\n<\/tr>\n<tr>\n<td rowspan=\"2\" width=\"180\">S\u0103n\u0103tatea \u0219i siguran\u021ba \u00een munc\u0103<\/td>\n<td width=\"283\">Elemente de SSM existente la fa\u021ba locului (echipament de protec\u021bie, primul ajutor, list\u0103 de instruire, responsabil SSM, semnalizare, cod de conduit\u0103 etc.) evaluate \u00een timpul vizitelor la fa\u021ba locului;<\/td>\n<td width=\"180\">O dat\u0103 (\u00eenainte de \u00eenceperea lucr\u0103rilor) \u0219i \u00een timpul vizitelor la \u0219antier<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>Zilnic<\/p>\n<p>&nbsp;<\/td>\n<td width=\"113\">Componenta managementul proiectului<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>Contracte pentru lucr\u0103ri \u0219i supraveghere<\/td>\n<td width=\"198\">Speciali\u0219tii de mediu \u0219i social ai EMP<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>Specialistul Contractorului<\/p>\n<p>Consultan\u021bii supraveghere<\/td>\n<\/tr>\n<tr>\n<td width=\"283\">Rapoarte privind s\u0103n\u0103tatea \u0219i securitatea \u00een munc\u0103;<\/td>\n<td width=\"180\">Lunar<\/td>\n<td width=\"113\">Contracte pentru lucr\u0103ri \u0219i supraveghere<\/td>\n<td width=\"198\">Specialistul SSM a Contractorului<\/p>\n<p>Consultan\u021bii supraveghere<\/td>\n<\/tr>\n<tr>\n<td rowspan=\"3\" width=\"180\">Disconfort general generat de praf \u0219i poluare fonic\u0103 la nivelul c\u0103minului\/zonei \u00eenvecinate<\/td>\n<td width=\"283\">Lucr\u0103ri de construc\u021bie \u0219i demolare efectuate \u00een conformitate cu termenele \u0219i orele convenite;<\/td>\n<td width=\"180\">Zilnic<\/td>\n<td width=\"113\">Contactul pentru lucr\u0103ri<\/td>\n<td width=\"198\">Contractor<\/td>\n<\/tr>\n<tr>\n<td width=\"283\">Reclama\u021bii \u00eenregistrate pe \u0219antier\/din alte canale \u0219i accidente \u00eenregistrate \u0219i solu\u021bionarea acestora;<\/td>\n<td width=\"180\">\u00cen timpul vizitelor la fa\u021ba locului \u0219i c\u00e2nd sunt \u00eenregistrate reclama\u021biile<\/td>\n<td width=\"113\">Componenta de management a proiectului<\/p>\n<p>&nbsp;<\/p>\n<p>Contractul pentru lucr\u0103ri<\/td>\n<td width=\"198\">Specialistul EMP social \u0219i implicare a comunit\u0103\u021bii<\/p>\n<p>&nbsp;<\/p>\n<p>Contractor<\/td>\n<\/tr>\n<tr>\n<td width=\"283\">Respectarea m\u0103surilor de atenuare a zgomotului \u0219i a prafului;<\/td>\n<td width=\"180\">Zilnic<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>Pe durata vizitelor la fa\u021ba locului<\/td>\n<td width=\"113\">Contractul pentru lucr\u0103ri<\/p>\n<p>&nbsp;<\/p>\n<p>Componenta de management a proiectului<\/td>\n<td width=\"198\">Contractor<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>Specialistul de mediu a EMP<\/td>\n<\/tr>\n<tr>\n<td width=\"180\">Managementul traficului<\/td>\n<td width=\"283\">Acces separat, semnalizare \u0219i instruire pentru siguran\u021ba \u0219oferului;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>Respectarea masurilor de circulatie;<\/td>\n<td width=\"180\">O dat\u0103 (\u00eenainte de \u00eenceperea lucr\u0103rilor)<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>Pe durata vizitelor la fa\u021ba locului<\/td>\n<td width=\"113\">Contractul pentru lucr\u0103ri<\/p>\n<p>&nbsp;<\/p>\n<p>Componenta de management a proiectului<\/td>\n<td width=\"198\">Contractor<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>EMP<\/td>\n<\/tr>\n<tr>\n<td rowspan=\"3\" width=\"180\">Aflux de for\u021b\u0103 de munc\u0103<\/td>\n<td width=\"283\">Instruire privind Codul de conduit\u0103 (inclusiv VBG) \u0219i Mecanismul de reclama\u021bie a contractorului pentru lucr\u0103tori, efectuate pentru to\u021bi lucr\u0103torii de pe \u0219antier;<\/td>\n<td width=\"180\">O dat\u0103 (\u00eenainte de \u00eenceperea lucr\u0103rilor)<\/td>\n<td width=\"113\">Contractul pentru lucr\u0103ri<\/p>\n<p>&nbsp;<\/td>\n<td width=\"198\">Contractor<\/td>\n<\/tr>\n<tr>\n<td width=\"283\">Rezolvarea nemul\u021bumirilor legate de conduita lucr\u0103torilor (inclusiv GBV) \u00een zona cu studen\u021bi\/comunitate;<\/td>\n<td width=\"180\">Ori de c\u00e2te ori sunt \u00eenregistrate reclama\u021bii<\/td>\n<td width=\"113\">Componenta de management a proiectului<\/td>\n<td width=\"198\">Specialistul EMP social \u0219i implicare a comunit\u0103\u021bii<\/td>\n<\/tr>\n<tr>\n<td width=\"283\">Respectarea Planului de management al muncii anexat contractului;<\/td>\n<td width=\"180\">Pe durata vizitelor la fa\u021ba locului<\/td>\n<td width=\"113\">Componenta de management a proiectului<\/td>\n<td width=\"198\">Specialistul EMP social<\/td>\n<\/tr>\n<tr>\n<td width=\"180\">Colectarea \u0219i transportul de\u0219eurilor de demolare sau periculoase (inclusiv azbest)<\/td>\n<td width=\"283\">Revizuirea listei de transport \u0219i condi\u021biile de la depozit;<\/td>\n<td width=\"180\">\u00cenainte de transportul de\u0219eurilor periculoase<\/td>\n<td width=\"113\">Contractul pentru lucr\u0103ri<\/p>\n<p>&nbsp;<\/p>\n<p>Componenta de management a proiectului<\/td>\n<td width=\"198\">Contractor<\/p>\n<p><u>\u00a0<\/u><\/p>\n<p><u>\u00a0<\/u><\/p>\n<p>Specialistul de mediu al EMP<\/td>\n<\/tr>\n<tr>\n<td width=\"180\">Praf, zgomot \u0219i emisii nocive<\/td>\n<td width=\"283\">Verific\u0103ri vizuale \u0219i conform procedurii de demolare \u0219i de construc\u021bie;<\/td>\n<td width=\"180\">\u00cen timpul fazei de demolare\/construc\u021bie \u0219i activit\u0103\u021bi de cur\u0103\u021benie<\/td>\n<td width=\"113\">Contracte pentru lucr\u0103ri \u0219i supraveghere<\/p>\n<p>&nbsp;<\/p>\n<p>Componenta de management a proiectului<\/td>\n<td width=\"198\">Contractor<\/p>\n<p>Consultan\u021bii supraveghere<\/p>\n<p><u>\u00a0<\/u><\/p>\n<p>&nbsp;<\/p>\n<p>Specialistul de mediu al EMP<\/td>\n<\/tr>\n<tr>\n<td width=\"180\">Bun\u0103 func\u021bionare a utilajelor de construc\u021bii<\/td>\n<td width=\"283\">Verific\u0103ri vizuale \u0219i conform procedurii de demolare \u0219i de construc\u021bie;<\/td>\n<td width=\"180\">\u00cen timpul fazei de demolare\/construc\u021bie \u0219i activit\u0103\u021bi de cur\u0103\u021benie<\/td>\n<td width=\"113\">Contracte pentru lucr\u0103ri \u0219i supraveghere<\/p>\n<p>&nbsp;<\/p>\n<p>Componenta de management a proiectului<\/td>\n<td width=\"198\">Contractor<\/p>\n<p>Consultan\u021bii supraveghere<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>Specialistul de mediu al EMP<\/td>\n<\/tr>\n<tr>\n<td width=\"180\">M\u0103surile de protec\u021bie a siguran\u021bei aplicate lucr\u0103torilor<\/td>\n<td width=\"283\">Verific\u0103ri vizuale;<\/td>\n<td width=\"180\">La \u00eenceputul fiec\u0103rei zile lucr\u0103toare \u00een timpul activit\u0103\u021bilor proiectului<\/td>\n<td width=\"113\">Contract pentru lucr\u0103ri<\/p>\n<p>&nbsp;<\/p>\n<p>Componenta de management a proiectului<\/td>\n<td width=\"198\">Specialistul SSM al Contractului<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>EMP<\/td>\n<\/tr>\n<tr>\n<td width=\"180\">Descoperirea unei resurse culturale fizice, cum ar fi (dar f\u0103r\u0103 a se limita la) situri arheologice, situri istorice, r\u0103m\u0103\u0219i\u021be \u0219i obiecte \u00een timpul s\u0103p\u0103turilor sau al construc\u021biei<\/td>\n<td width=\"283\">Descoperiri raportate \u00een timpul demol\u0103rii\/s\u0103p\u0103turilor;<\/td>\n<td width=\"180\">\u00cen timpul vizitelor la fa\u021ba locului<\/td>\n<td width=\"113\">Contractul pentru lucr\u0103ri<\/p>\n<p>&nbsp;<\/p>\n<p>Componenta de management a proiectului<\/td>\n<td width=\"198\">Contractor<\/p>\n<p>Specialistul de mediu al EMP<\/td>\n<\/tr>\n<tr>\n<td width=\"180\">Impactul azbestului \u00een timpul demol\u0103rii cl\u0103dirii<\/td>\n<td width=\"283\">\u00cenregistr\u0103ri ale cantit\u0103\u021bii de materiale din azbest descoperite;<\/td>\n<td width=\"180\">Ori de c\u00e2te ori se fac astfel de descoperiri<\/td>\n<td width=\"113\">Contract pentru lucr\u0103ri<\/p>\n<p>&nbsp;<\/p>\n<p>Componenta de management a proiectului<\/td>\n<td width=\"198\">Contractor<\/p>\n<p>Specialistul de mediu al EMP<\/td>\n<\/tr>\n<tr>\n<td width=\"180\">Condi\u021bii de munc\u0103 proaste pentru muncitorii implica\u021bi \u00een lucr\u0103ri<\/td>\n<td width=\"283\">Respectarea legisla\u021biei Republicii Moldova \u0219i a cerin\u021belor B\u0103ncii Mondiale, prevenirea discrimin\u0103rii, promovarea egalit\u0103\u021bii de \u0219anse etc.<\/td>\n<td width=\"180\">Lunar<\/td>\n<td width=\"113\">Contract pentru lucr\u0103ri<\/p>\n<p>&nbsp;<\/p>\n<p>Componenta de management a proiectului<\/td>\n<td width=\"198\">Contractor<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>Specialistul de mediu al EMP<\/td>\n<\/tr>\n<tr>\n<td width=\"180\">Impactul incidentelor sau accidentelor<\/td>\n<td width=\"283\">\u00cenregistrarea evenimentului \u0219i raportarea incidentului c\u0103tre autorit\u0103\u021bile \u00eendrept\u0103\u021bite \u0219i EMP;<\/p>\n<p>&nbsp;<\/p>\n<p>Plan de ac\u021biuni corective dup\u0103 incident<\/td>\n<td width=\"180\">Ori de c\u00e2te ori are loc un astfel de eveniment<\/td>\n<td width=\"113\">Contract pentru lucr\u0103ri<\/p>\n<p>&nbsp;<\/p>\n<p>Componenta de management a proiectului<\/td>\n<td width=\"198\">Contractor, Site Manager,<\/p>\n<p>Consultan\u021bi supraveghere<\/p>\n<p>&nbsp;<\/p>\n<p>EMP<\/td>\n<\/tr>\n<tr>\n<td colspan=\"5\" width=\"954\"><strong>Operare<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"180\">De\u0219eurile rezultate din activit\u0103\u021bile c\u0103minelor<\/td>\n<td width=\"283\">Verificarea colect\u0103rii separate a de\u0219eurilor \u00een zona desemnat\u0103;<\/td>\n<td width=\"180\">Lunar<\/td>\n<td width=\"113\">Costul de func\u021bionare a c\u0103minului<\/td>\n<td width=\"198\">Personalul administrativ al c\u0103minului<\/td>\n<\/tr>\n<tr>\n<td width=\"180\">Scurgeri de ape uzate<\/td>\n<td width=\"283\">Verificarea sistemelor de colectare a apelor uzate<\/td>\n<td width=\"180\">Lunar<\/td>\n<td width=\"113\">Costul de func\u021bionare a c\u0103minului<\/td>\n<td width=\"198\">Personalul administrativ al c\u0103minului<\/td>\n<\/tr>\n<tr>\n<td width=\"180\">Lipsa oportunit\u0103\u021bilor pentru grupurile vulnerabile<\/td>\n<td width=\"283\">Au fost implementate consult\u0103ri cu grupurile vulnerabile;<\/td>\n<td width=\"180\">O dat\u0103 (\u00eenainte de achizi\u021bionarea echipamentului\/mobilierului)<\/td>\n<td width=\"113\">Managementul subproiectului<\/td>\n<td width=\"198\">Echipa de gestionare a subproiectului USM<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p><strong><em>Not\u0103:<\/em><\/strong> Planul de monitorizare va fi detaliat \u00een baza planului de lucru aprobat \u0219i va fi revizuit periodic urmare rezultatelor inspect\u0103rilor \u0219i monitoriz\u0103rii<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<ol start=\"7\">\n<li><a name=\"_Toc147737881\"><\/a><a name=\"_Toc184731096\"><\/a> <strong>IMPLICAREA P\u0102R\u021aILOR INTERESATE \u0218I PUBLICAREA INFORMA\u021aIILOR<\/strong><\/li>\n<\/ol>\n<p><a name=\"_Toc184731097\"><\/a><strong>7.1. Identificarea P\u0103r\u021bilor Interesate a Subproiectului<\/strong><\/p>\n<p>Un Plan de Implicare a P\u0103r\u021bilor Interesate (eng. SEP) a fost elaborat pentru Proiect \u0219i este disponibil pentru consultare de c\u0103tre public pe pagina web a MEC. Scopul Planului este de a identifica diferite p\u0103r\u021bi interesate din cadrul proiectului, adic\u0103 p\u0103r\u021bile afectate de proiect \u0219i alte p\u0103r\u021bi interesate, inclusiv grupurile vulnerabile \u0219i dezavantajate. Entit\u0103\u021bile de implementare vor implica p\u0103r\u021bile interesate \u0219i le va oferi suficiente informa\u021bii pe parcursul ciclului de via\u021b\u0103 al proiectului \u0219i subproiectului, \u00eentr-o manier\u0103 adecvat\u0103 naturii intereselor acestora \u0219i poten\u021bialelor riscuri \u0219i impacturi sociale \u0219i de mediu ale subproiectului.<\/p>\n<p>Se preconizeaz\u0103 c\u0103 subproiectul va avea un impact negativ limitat asupra personalului actual al c\u0103minului \u00a0\u0219i asupra propriet\u0103\u021bilor \u00eenvecinate. Cu toate acestea, zgomotul \u0219i praful generate de lucr\u0103rile de renovare \u0219i alte perturb\u0103ri pe care le poate resim\u021bi comunitatea local\u0103 din preajma c\u0103minului \u0219i trebuie stabilit un proces de informare \u0219i implicare pro activ, pentru a \u00een\u021belege preocup\u0103rile, disconfortul \u0219i sugestiile lor \u0219i pentru a atenua pe c\u00e2t posibil impactul negativ. \u00cen ceea ce prive\u0219te studen\u021bii caza\u021bi \u00een c\u0103min, personalul auxiliar, ace\u0219tia vor fi afecta\u021bi temporar de relocare \u0219i de eventuale perturb\u0103ri \u00een timpul lucr\u0103rilor de repara\u021bie.<\/p>\n<p>P\u0103r\u021bile interesate identificate sunt enumerate mai jos:<\/p>\n<ul>\n<li>Studen\u021bi interna\u021bionali \u0219i autohtoni;<\/li>\n<li>Personalul c\u0103minului \u2013 manager, pedagog social \u0219i personal auxiliar;<\/li>\n<li>Utilizatorii \u0219i personalul complexelor (sportiv \u0219i cultural) \u0219i micilor afaceri din vecin\u0103tatea c\u0103minului;<\/li>\n<li>Utilizatorii str\u0103zilor ca c\u0103i de acces din zona c\u0103minului;<\/li>\n<li>Cet\u0103\u021benii poten\u021bial afecta\u021bi de lipsa utilit\u0103\u021bilor \u00een timpul lucr\u0103rilor, muncitorii de la firmele \u00eenvecinate \u0219antierului;<\/li>\n<li>Managementul USM \u0219i echipa de gestionare a subproiectului;<\/li>\n<li>Mass-media, Agen\u021bia de Mediu, Inspectoratul de Protec\u021bie a Mediului, Poli\u021bia Rutier\u0103<\/li>\n<li>Contractorul \u0219i subcontractorii responsabili de lucr\u0103ri \u0219i consultan\u021bii angaja\u021bi pentru asisten\u021b\u0103 tehnic\/ supravegherea tehnic\u0103 a lucr\u0103rilor;<\/li>\n<li>ONG-urile de dezvoltare social\u0103 \u0219i de mediu .<\/li>\n<\/ul>\n<p>USM \u0219i Contractorul va prezenta informa\u021bii despre subproiect pentru a permite celor interesa\u021bi s\u0103 \u00een\u021beleag\u0103 riscurile \u0219i impacturile de mediu \u0219i sociale ale subproiectului, dar \u0219i poten\u021bialele oportunit\u0103\u021bi. USM va oferi celor interesa\u021bi acces la urm\u0103toarele informa\u021bii ce prezint\u0103 interes:<\/p>\n<ul>\n<li>Scopul, natura \u0219i amploarea subproiectului;<\/li>\n<li>Durata activit\u0103\u021bilor propuse pentru subproiect;<\/li>\n<li>Riscurile \u0219i impactul poten\u021biale de mediu \u0219i sociale ale subproiectului \u0219i m\u0103surile propuse de atenuare a acestora;<\/li>\n<li>Mecanismul existent de solu\u021bionare a reclama\u021biilor \u0219i de interac\u021bionare cu p\u0103r\u021bile implicate ale proiectului.<\/li>\n<\/ul>\n<p>Principala responsabilitate pentru implementare a planului de implicare a p\u0103r\u021bilor interesate este a specialistului social al EMP, iar specialistul de mediu al EMP contribuie pentru a asigura o identificare, o analiz\u0103 \u0219i o implicare adecvate ale p\u0103r\u021bilor interesate relevante, precum \u0219i prin prezentarea m\u0103surilor de atenuare legate de aspectele de mediu \u00een timpul procesului de consultare public\u0103.<\/p>\n<p><a name=\"_Toc184731098\"><\/a><strong>7.2. Implicarea P\u0103r\u021bilor Interesate a Subproiectului<\/strong><\/p>\n<p>Ac\u021biunile de implicare prev\u0103zute \u00een cadrul acestui PMMS includ proceduri de informare public\u0103, consult\u0103ri publice, comunicare media \u0219i interac\u021biuni directe cu p\u0103r\u021bile interesate. Ac\u021biunile de comunicare vor fi realizate EMP \u00een colaborare cu echipa de implementare a subproiectului desemnat\u0103 de USM, \u0219i vor include:<\/p>\n<ul>\n<li>Comunicate de pres\u0103 \u0219i anun\u021buri pe social media referitor la etapele importante ale subproiectului, incluz\u00e2nd cerin\u021bele PMMS \u0219i rezultatele eforturilor de monitorizare legate de respectarea cerin\u021belor de mediu \u0219i sociale;<\/li>\n<li>Sec\u021biune pe site-ul USM cuprinz\u00e2nd informa\u021bii despre subproiect \u0219i PMMS.<\/li>\n<\/ul>\n<p>La nivel de \u0219antier se vor realiza ac\u021biuni de interac\u021biune direct\u0103 at\u00e2t cu lucr\u0103torii implica\u021bii \u00een lucr\u0103rile de renovare c\u00e2t \u0219i cu comunitatea din vecin\u0103tatea \u0219antierului, cum ar fi:<\/p>\n<ul>\n<li>Discu\u021bii cu muncitorii de pe \u0219antier, atunci c\u00e2nd vor fi \u00eencepute construc\u021biile pentru a evalua orice riscuri legate de prevederile de s\u0103n\u0103tate \u0219i siguran\u021b\u0103 \u00een munc\u0103, inclusiv exploatarea sexual\u0103 \u0219i abuz \u0219i agresiunea sexual\u0103.<\/li>\n<li>Ac\u021biuni de implicare \u0219i consultare cu vecinii \u0219i institu\u021biile din apropierea \u0219antierului la \u00eenceputul, pe parcursul \u0219i la finalizarea lucr\u0103rilor de construc\u021bii.<\/li>\n<li>Convorbiri directe cu vecinii \u0219antierului, pentru a colecta opiniile acestora cu privire la lucr\u0103rile de repara\u021bie \u0219i pentru a-i \u00eencuraja s\u0103 ofere feedback, deoarece s-a dovedit a fi cea mai eficient\u0103 modalitate de a implica aceast\u0103 categorie de p\u0103r\u021bi interesate \u00een procesul de consultare;<\/li>\n<li>Comunicarea cu institu\u021biile implicate \u00een raportarea \u0219i atenuarea problemelor de protec\u021bie legate de subproiect.<\/li>\n<li>\u00cent\u00e2lniri de informare intre reprezentan\u021bii EMP \u0219i echipele locale de sub-proiect asupra rezultatelor activit\u0103\u021bilor de implicare social\u0103: pl\u00e2ngeri, consult\u0103ri publice, interac\u021biuni cu cet\u0103\u021benii, etc.<\/li>\n<li>Aplicarea mecanismului de solu\u021bionare a reclama\u021biilor \u0219i interac\u021biune cu p\u0103r\u021bile interesate.<\/li>\n<\/ul>\n<p>Ac\u021biunile de implicare vor fi documentate \u00een scris (minute ale \u00eent\u00e2lnirilor, raport\u0103ri, comunicate de pres\u0103) \u0219i, ori de c\u00e2te ori este posibil, se va aplica documentarea foto \u0219i video (consult\u0103ri publice, conversa\u021bii directe etc.).<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<ol start=\"8\">\n<li><a name=\"_Toc147737884\"><\/a><a name=\"_Toc184731099\"><\/a> <strong>MECANISMUL DE SOLU\u021aIONARE A RECLAMA\u021aIILOR<\/strong><\/li>\n<\/ol>\n<p>Transparen\u021ba \u0219i responsabilitatea sunt elemente de baz\u0103 ale Proiectului de reform\u0103 a \u00eenv\u0103\u021b\u0103m\u00e2ntului superior din Moldova (P\u00ceSM). \u00cen acest scop, Mecanismul de Solu\u021bionare a Reclama\u021biilor (eng. GRM) dedicat este elaborat pentru Proiect. Scopul GRM este de a oferi un mecanism de feedback tuturor p\u0103r\u021bilor interesate ale Proiectului pentru a asigura comunicarea bidirec\u021bional\u0103 \u00eentre echipele de implementare a Proiectului \u0219i a subproiectelor \u0219i p\u0103r\u021bile interesate externe pe parcursul tuturor etapelor de implementare a Proiectului. Mecanismul reprezint\u0103 un instrument de evitare \u0219i atenuare a unor poten\u021biale riscuri \u0219i impacturi prin implicarea p\u0103r\u021bilor interesate \u00een procesul de implementare a Proiectului.<\/p>\n<p>GRM va fi gestionat de EMP \u00een timpul implement\u0103rii tuturor componentelor Proiectului, inclusiv primirea \u0219i \u00eenregistrarea, examinarea, rezolvarea, monitorizarea \u0219i raportarea.<\/p>\n<p>Conform mecanismului deja stabilit \u00een cadrul P\u00ceSM, pe parcursul implement\u0103rii acestui subproiect, GRM va fi gestionat la 2 niveluri:<\/p>\n<ol>\n<li><strong>Nivelul subproiectului, inclusiv:<\/strong><\/li>\n<\/ol>\n<ul>\n<li><strong><u>Nivelul de \u0219antier <\/u><\/strong>gestionat de Antreprenorul\/Contractorul care efectueaz\u0103 lucr\u0103rile de reabilitare \u0219i construc\u021bie. Antreprenorul va primi nemul\u021bumirile referitoare la lucr\u0103rile de reabilitare\/construc\u021bii numai \u0219i le va rezolva la nivel de \u0219antier cu informarea managementului subproiectului. Nemul\u021bumirile legate de alte aspecte ale subproiectului sau implement\u0103rii Proiectului primite de Antreprenor vor fi redirec\u021bionate c\u0103tre echipa de management al subproiectului sau EMP.<\/li>\n<li><strong><u>Nivel institu\u021bional <\/u><\/strong>a managementului USM. Echipa de management a subproiectului este responsabil\u0103 de monitorizarea solu\u021bion\u0103rii adres\u0103rilor\/reclama\u021biilor recep\u021bionate de c\u0103tre Contractor \u0219i solu\u021bion\u0103rii nemul\u021bumirilor primite direct de c\u0103tre conducerea subproiectului sau de c\u0103tre conducerea institu\u021biei legate de implementarea P\u00ceSM\/subproiectului. Nemul\u021bumirile (sugestii, solicit\u0103ri, \u00eentreb\u0103ri etc.) pot fi adresate de c\u0103tre toate p\u0103r\u021bile interesate, inclusiv, dar f\u0103r\u0103 a se limita la: profesori, elevi, p\u0103rin\u021bi, comunitate etc. Echipa de management a subproiectului este un punct focal la nivel de subproiect \u0219i monitorizeaz\u0103 rezolvarea tuturor nemul\u021bumirilor primite cu privire la implementarea P\u00ceSM\/subproiectului prin \u021binerea unui registru unic de urm\u0103rire a reclama\u021biilor. Echipa de management a subproiectului poate redirec\u021biona pl\u00e2ngerile c\u0103tre EMP dac\u0103 este nevoie de sprijin sau \u00eendrum\u0103ri suplimentare pentru solu\u021bionarea unei reclama\u021bii.<\/li>\n<\/ul>\n<p>Institu\u021bia USM a desemnat punctul focal \u0219i a stabilit canalele de interac\u021bionare cu p\u0103r\u021bile interesate pentru func\u021bionarea GRM la nivel de subproiect: <a href=\"https:\/\/new80.usm.md\/?page_id=26463\">https:\/\/new80.usm.md\/?page_id=26463<\/a>.<\/p>\n<p>&nbsp;<\/p>\n<p>La nivel de \u0219antier, nemul\u021bumirile\/\u00eentreb\u0103rile\/sugestiile pot fi depuse folosind numerele de telefon men\u021bionate pe panourile de informare, verbal c\u0103tre reprezentan\u021bii antreprenorului sau institu\u021biilor beneficiare sau folosind c\u0103su\u021ba securizat\u0103 de sugestii\/reclama\u021bii care va fi instalat\u0103 la \u0219antier at\u00e2t pentru lucr\u0103torii proiectului c\u00e2t \u0219i pentru alte p\u0103r\u021bi afectate, unde pot fi depuse \u0219i pl\u00e2ngeri\/reclama\u021bii anonime.<\/p>\n<ol>\n<li><strong>Nivel de proiect.<\/strong><\/li>\n<\/ol>\n<p>Acest nivel va aborda nemul\u021bumirile primite de MEC \u0219i EMP. EMP \u021bine un registru unic de urm\u0103rire a nemul\u021bumirilor proiectului pe baza rapoartelor transmise de echipele de management al subproiectului.<\/p>\n<p>La nivel de proiect se pot folosi urm\u0103toarele canale pentru depunerea reclama\u021biilor:<\/p>\n<ul>\n<li><em><u>Online: <\/u><\/em>folosind site-ul web al Ministerului Educa\u021biei \u0219i Cercet\u0103rii (MEC) <a href=\"https:\/\/mecc.gov.md\/ro\/petitii-online\">https:\/\/mecc.gov.md\/ro\/petitii-online<\/a>;<\/li>\n<li><em><u>Prin e-mail:<\/u><\/em> <a href=\"mailto:mhep@mec.gov.md\">mhep@mec.gov.md<\/a><u>; cancelaria<\/u><a href=\"mailto:mecc@mecc.gov.md\">@mec.gov.md<\/a><u>;<\/u><\/li>\n<li><em><u>Prin telefon:<\/u><\/em>+373 (0) 22 23 25 02; +373 (0) 22 22 76 20;<\/li>\n<li><em><u>In persoana:<\/u><\/em> 180, bd. Stefan cel Mare si Sfant, et. 13, birou 1313;<\/li>\n<\/ul>\n<p>1, Pia\u021ba Marii Adun\u0103ri Na\u021bionale, Casa Guvernului, MD-2033.<\/p>\n<ul>\n<li><em><u>Verbal: <\/u><\/em>\u00een timpul \u00eent\u00e2lnirilor, consult\u0103rilor sau altor activit\u0103\u021bi de informare \u0219i implicare. Nemul\u021bumirile depuse verbal vor fi men\u021bionate \u00een procesele-verbale ale \u0219edin\u021belor \u0219i \u00eenregistrator, a\u0219a cum este men\u021bionat mai jos \u00een urm\u0103torul GRM.<\/li>\n<li><em><u>Pentru lucr\u0103torii Proiectului \u0219i nemul\u021bumirile anonime se poate folosi telefonul: +37368055297.<\/u><\/em><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><strong><em>Ghidul complet privind func\u021bionarea GRM al P\u00ceSM este ata\u0219at la SEP ca Anexa C.<\/em><\/strong><\/p>\n<p><strong><em>\u00a0<\/em><\/strong><\/p>\n<p>\u00cen plus, proiectul trateaz\u0103 pl\u00e2ngerile sensibile \u0219i confiden\u021biale, inclusiv cele legate de exploatarea \u0219i abuzul\/h\u0103r\u021buirea sexual\u0103 (SEA\/SH) \u00een conformitate cu Nota de bune practici ale BM FSE privind SEA\/SH.<a href=\"#_ftn2\" name=\"_ftnref2\"><sup>[2]<\/sup><\/a>Pentru VBG, \u0219i \u00een special pentru pl\u00e2ngerile SEA\/SH, exist\u0103 riscuri de stigmatizare, respingere \u0219i represalii \u00eempotriva supravie\u021buitorilor.<\/p>\n<p>Toate datele personale \u0219i pl\u00e2ngerile primite de GRM vor fi tratate \u00eentr-o manier\u0103 confiden\u021bial\u0103, cu excep\u021bia cazului \u00een care reclaman\u021bii sunt de acord cu dezv\u0103luirea informa\u021biilor lor personale. \u00cen special, se va respecta confiden\u021bialitatea problemelor sensibile \u0219i a reclama\u021biilor legate de SEA\/SH ridicate de comunit\u0103\u021bi.<\/p>\n<p>Contractorul ar trebui s\u0103 stabileasc\u0103 mecanismul dedicat pentru transmiterea \u0219i solu\u021bionarea pl\u00e2ngerilor legate de SEA\/SH.<\/p>\n<p><strong>Sistemul de solu\u021bionare a pl\u00e2ngerilor a B\u0103ncii Mondiale<\/strong><\/p>\n<p>Comunit\u0103\u021bile \u0219i persoanele care cred c\u0103 sunt afectate negativ de un proiect sus\u021binut de Banca Mondial\u0103 (BM) pot depune pl\u00e2ngeri la mecanismele existente de solu\u021bionare a reclama\u021biilor la nivel de proiect sau la Serviciul de Remediere a Nemul\u021bumirilor (GRS) al BM. GRS se asigur\u0103 c\u0103 pl\u00e2ngerile primite sunt examinate cu promptitudine pentru a aborda preocup\u0103rile legate de proiect. Comunit\u0103\u021bile \u0219i persoanele afectate de proiect \u00ee\u0219i pot depune pl\u00e2ngerea la Comitetul de inspec\u021bie independent al BM, care determin\u0103 dac\u0103 a avut loc sau s-ar putea produce un prejudiciu ca urmare a nerespect\u0103rii a politicilor \u0219i procedurilor BM. Pentru informa\u021bii despre cum s\u0103 depune\u021bi pl\u00e2ngeri la Serviciul corporativ de solu\u021bionare a pl\u00e2ngerilor (GRS) al B\u0103ncii Mondiale, v\u0103 rug\u0103m s\u0103 vizita\u021bi <a href=\"http:\/\/www.worldbank.org\/en\/projects-operations\/products-and-services\/grievance-redress-\">http:\/\/www.worldbank.org\/en\/projects-operations\/products-and-services\/grievance-redress-<\/a> <a href=\"http:\/\/www.worldbank.org\/en\/projects-operations\/products-and-services\/grievance-redress-service\">serviciu.<\/a><\/p>\n<p>&nbsp;<\/p>\n<p>Pentru informa\u021bii despre cum s\u0103 depune\u021bi reclama\u021bii la Panelul de inspec\u021bie al B\u0103ncii Mondiale, v\u0103 rug\u0103m s\u0103 vizita\u021bi <a href=\"http:\/\/www.inspectionpanel.org.\">www.inspectionpanel.org.<\/a><\/p>\n<ol start=\"9\">\n<li><a name=\"_Toc147737885\"><\/a><a name=\"_Toc184731100\"><\/a> <strong>CONSULTAREA PUBLIC\u0102 A PMMS \u0218I PUBLICAREA INFORMA\u021aIILOR<\/strong><\/li>\n<\/ol>\n<p>Consultarea public\u0103 privind PMMS specific amplasamentului au fost desf\u0103\u0219urate la data de 12.03.2025 \u00een sala senatului USM la care au participat 104 persoane. Concomitent consultantul de mediu \u0219i social P\u00ceSM, dl Mihai Mustea a a presentat comunic\u0103rile privind CMMS, LMP, SEP cu MSR \u0219i Planul de ac\u021biuni VBG-EAS\/HS. Pe rezultatele aspectelor discutat s-a \u00eentocmit Procesul verbal\u00a0 cu anexare listei participan\u021bior \u0219i decisiei de plasare a PMMS pe site-ul USM, av\u00eend posibilitate persoanelor interesate de a se familiariza pe con\u021binutul planului \u0219i de a veni cu Feedbak-uri. Deasemenea s-a decis de aplasa un panou informativ cu instakarea unei boxe pentru sugestii.<\/p>\n<p>&nbsp;<\/p>\n<p>Poza<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<ol start=\"10\">\n<li><a name=\"_Toc184731101\"><\/a> <strong>ANEXE<\/strong><\/li>\n<\/ol>\n<p>&nbsp;<\/p>\n<p><a name=\"_Toc184731102\"><\/a><strong>ANEXA 1. CADRUL GENERAL \u0218I DIREC\u021aII PRIVIND PROTEC\u021aIA MEDIULUI<\/strong><\/p>\n<p>Legisla\u021bia na\u021bional\u0103 de mediu stabile\u0219te principiile generale ale politicii de mediu (poluatorul pl\u0103te\u0219te, monitorizarea integrat\u0103, dezvoltarea durabil\u0103, participarea publicului \u0219i a ONG-urilor, cooperarea interna\u021bional\u0103, reabilitarea zonelor degradate. De asemenea, cadrul legal stipuleaz\u0103 modalit\u0103\u021bile generale de aplicare a acestor principii, cum ar fi: armonizarea politicilor de mediu \u0219i a programelor de dezvoltare economic\u0103 \u0219i social\u0103 a teritoriului, corelarea dintre dezvoltarea special\u0103 \u0219i cea de mediu, utilizarea obligatorie a procedurii de autorizare a mediului pentru activit\u0103\u021bile economice \u0219i sociale cu impact semnificativ asupra mediului, utilizarea stimulentelor economice.<\/p>\n<p><strong>Evaluarea impactului asupra mediului (EIM)<\/strong><\/p>\n<p>Realizarea unei EIM complet pe baza c\u0103ruia s\u0103 fie emis acordul de mediu, este obligatorie pentru toate proiectele enumerate \u00een Anexa I din Legea nr. 86\/2014 privind evaluarea impactului asupra mediului\u00a0 la etapa de planificare a obiectelor \u00een renovare cu ob\u021binerea acordului de mediu. Pentru activit\u0103\u021bile enumerate \u00een anexa 2 la legea 86\/2014, care nu sunt supuse obligatoriu EIM se emite acord de mediu\u00a0 de c\u0103tre Agen\u021bia de mediu. Pentru SP \u00een cauz\u0103 nu se emite acordul de mediu. Rezultatul aplic\u0103rii procedurii de screening este o decizie pe baza c\u0103reia proiectul este sau nu supus procedurii EIM. Reglement\u0103rile actuale impun ca informa\u021biile furnizate de dezvoltatorul procesului de screening s\u0103 includ\u0103 m\u0103surile prev\u0103zute pentru a evita, reduce \u0219i, dac\u0103 este posibil, compensa efectele adverse semnificative.<\/p>\n<p>Investi\u021biile propuse nu ar trebui s\u0103 declan\u0219eze cerin\u021ba unei EIM complete \u00een conformitate cu legea 86\/2014 cu modific\u0103rile \u0219i complet\u0103rile ulterioare.<\/p>\n<p>Nu este permis\u0103 utilizarea de materiale de renovare care sunt periculoase pentru s\u0103n\u0103tatea uman\u0103. De\u0219eurile de materiale care con\u021bin substan\u021be periculoase (ambalaj) vor fi colectate, transportate \u0219i eliminate prin aplicarea unor m\u0103suri speciale de protec\u021bie \u00een conformitate cu standardele de manipulare a de\u0219eurilor periculoase. (conform prevederilor legii nr. 209\/1016 privind de\u0219eurile)\u00a0 cu complet\u0103rile ulterioare.<\/p>\n<p>Lista de recomand\u0103ri de mai jos nu este una exhaustiv\u0103, dar eviden\u021biaz\u0103 cele mai relevante m\u0103suri de atenuare care vor fi luate \u00een considerare \u00een perioada de repara\u021bie. Sec\u021biunile de mai jos includ recomand\u0103ri mai detaliate \u00een func\u021bie de tipul de impact:<\/p>\n<ul>\n<li>Manipularea necorespunz\u0103toare a materialelor periculoase, cum ar fi azbestul \u0219i vopseaua bazat\u0103 pe plumb din transportul \u0219i manipularea lucr\u0103rilor de repara\u021bie, vor fi reduse la minimum cu ap\u0103 \u0219i alte mijloace, precum \u00eenchiderea \u0219antierelor.<\/li>\n<li>Pentru a reduce zgomotul, lucr\u0103rile de repara\u021bie vor fi restric\u021bionate \u00een anumite ore.<\/li>\n<li>Toate de\u0219eurile de renovare \u0219i de\u0219eurile de lemn vor fi depozitate pe \u0219antier.<\/li>\n<li>De\u0219eurile de lemn vor fi depozitate separat \u0219i aranjate pentru a fi reciclate \u00een loc s\u0103 fie eliminate.<\/li>\n<li>Nu va fi permis\u0103 arderea deschis\u0103 \u0219i dumpingul ilegal.<\/li>\n<li>Stivuirea reziduurilor de construc\u021bii pe \u0219antier va fi evitat\u0103, iar de\u0219eurile vor fi eliminate \u00een mod regulat la rampele de desc\u0103rcare autorizate. Se vor asigura cheiuri\/tomberoane o pentru a transfera resturile de la etajele superioare la sol.<\/li>\n<li>\u00centreruperea traficului trebuie evitat\u0103 prin planificarea intern\u0103.<\/li>\n<\/ul>\n<p><strong>EFICIEN\u021a\u0102 ENERGETIC\u0102, IZOLA\u021aIE \u0218I VENTILA\u021aIE<\/strong><\/p>\n<p>\u00cen scopul p\u0103str\u0103rii loca\u021biei ca monument istoric fa\u021bada va fi p\u0103strat\u0103. Izola\u021bia trebuie s\u0103 fie adaptat\u0103 la efectele sezoniere ale vremii, la sarcina termic\u0103 intern\u0103 \u0219i la caracteristicile expunerii. Amplasarea ferestrelor se va stabili \u00een func\u021bie de vedere, ventila\u021bie, lumin\u0103, aport termic, asigurarea intimit\u0103\u021bii \u0219i func\u021biile spa\u021biului interior. Sistemele de \u00eenalt\u0103 eficien\u021b\u0103 pentru \u00eenc\u0103lzirea apei menajere \u0219i pentru \u00eenc\u0103lzirea interioarelor ar trebui s\u0103 fie selectate av\u00e2nd \u00een vedere costurile de \u00eentre\u021binere \u0219i de func\u021bionare pe termen lung. Lucr\u0103rile de instala\u021bii sanitare ar trebui realizate \u00een mod coordonat, pentru a minimiza aceast\u0103 activitate \u0219i pentru a include alimentarea cu ap\u0103 a toaletelor \u0219i camerelor utilitare. O aten\u021bie adecvat\u0103 trebuie acordat\u0103 \u0219i robinetelor care asigur\u0103 economisirea apei, re\u021belelor de alimentare \u0219i altor dispozitive. Materialele de construc\u021bii vor respecta regulamentele na\u021bionale \u0219i standardele acceptate la nivel interna\u021bional cu privire la siguran\u021b\u0103 \u0219i la efectele asupra mediului.<\/p>\n<p><strong>INSTALA\u021aII ELECTRICE<\/strong><\/p>\n<p>Cablurile de intrare ar trebui pozate subteran. Este prudent ca intrarea principal\u0103 \u0219i tabloul principal s\u0103 fie amplasate departe de locurile de desf\u0103\u0219urare a activit\u0103\u021bii \u0219i de a\u0219teptare, pentru a evita c\u00e2mpurile electromagnetice. \u00cemp\u0103m\u00e2ntarea cablurilor defecte de l\u00e2ng\u0103 corpurile de instala\u021bii sanitare reprezint\u0103 o precau\u021bie. Prin selectarea obiectelor de iluminat, l\u0103mpilor, aparatelor \u0219i echipamentelor cele mai eficiente din punct de vedere al consumului de energie se va reduce cererea de energie, \u00eens\u0103 se pot genera c\u00e2mpuri electromagnetice nedorite. Trebuie \u021binut cont de faptul c\u0103 imediata apropiere de corpurile \u0219i l\u0103mpile de iluminat cu halogen, fluorescente, cu \u00eenalt\u0103 eficien\u021b\u0103, plasate pe birou sau plan\u0219eu, poate genera expunere la c\u00e2mpuri electromagnetice d\u0103un\u0103toare.<\/p>\n<p><strong>SELECTAREA MATERIALELOR DE RENOVARE \u0218I A METODELOR DE RENOVARE<\/strong><\/p>\n<p>Se vor selecta bunuri \u0219i servicii ecologice. Se va acorda prioritate produselor care respect\u0103 standardele aplicabile pentru simboluri interna\u021bionale sau na\u021bionale recunoscute. Se va acorda prioritate materialelor \u0219i metodelor tradi\u021bionale, consacrate, \u0219i nu tehnicilor noi, necunoscute. \u0218antierele de construc\u021bii ar trebui s\u0103 fie \u00eemprejmuite, pentru a preveni intrarea publicului \u0219i trebuie instituite m\u0103suri generale de siguran\u021b\u0103. Nepl\u0103cerile temporare cauzate de lucr\u0103rile de construire ar trebui s\u0103 fie minimizate prin opera\u021biuni de planificare \u0219i coordonare cu Contractantul, vecinii \u0219i autorit\u0103\u021bile. \u00cen zonele populate, activit\u0103\u021bile generatoare de zgomot sau vibra\u021bii ar trebui limitate, \u00een sensul realiz\u0103rii strict pe timpul zilei.<\/p>\n<p><strong>GESTIONAREA DE\u0218EURILOR<\/strong><\/p>\n<p>De\u0219eurile din construc\u021bii vor fi manipulate \u00een conformitate cu regulamentele locale \u0219i na\u021bional, conform specifica\u021biilor din PMM \u0219i descrierii de mai sus cu privire la \u0219antier aplicabile \u0103n Moldova. Monitorizarea va c\u0103dea \u00een responsabilitatea dirigin\u021bilor de \u0219antier precum \u0219i a specialistului de mediu care lucreaz\u0103 \u00een cadrul UIP. \u00cen toate cazurile specifice \u00een care Contractantul trebuie s\u0103 demoleze sau s\u0103 elimine materialele care con\u021bin azbest, aceste categorii de lucr\u0103ri vor fi realizate exclusiv cu personal calificat \u0219i \u00een deplin\u0103 conformitate cu legisla\u021bia specific\u0103 \u00een acest domeniu. Anexa 4 prezint\u0103 cerin\u021bele speciale pentru manipularea \u0219i gestionarea materialelor care con\u021bin azbest.<\/p>\n<p><strong>GESTIONAREA TRAFICULUI<\/strong><\/p>\n<p>\u00cen func\u021bie de necesitatea utiliz\u0103rii transportului se pot \u00eenregistra situa\u021bii \u00een care traficul local poate fi perturbat pe parcursul etapei de renovare. \u00cen cazul \u00een care activit\u0103\u021bile de construc\u021bii exercit\u0103 un impact direct asupra drumurilor sau trotuarelor, UIP va redacta un plan pentru gestionarea traficului.<\/p>\n<p><strong>S\u0102N\u0102TATEA \u0218I SECURITATEA LA LOCUL DE MUNC\u0102<\/strong><\/p>\n<p>\u00cen perioada de desf\u0103\u0219urare a lucr\u0103rilor de repara\u021bie este obligatorie utilizarea: c\u0103\u0219tilor, m\u0103nu\u0219ilor, ochelarilor de protec\u021bie, atunci c\u00e2nd este cazul, \u0219i a uniformelor de lucru. Toate aceste reguli minime de protec\u021bie, dublate de evitarea supra-solicit\u0103rii muncitorilor, duc la prevenirea v\u0103t\u0103m\u0103rilor \u0219i a altor accidente de munc\u0103 generate de manipularea repetitiv\u0103, excesiv\u0103 \u0219i manual\u0103 a materialelor de construc\u021bii. Recomand\u0103rile privind prevenirea \u0219i controlul celor de mai sus se refer\u0103 la cunoa\u0219terea celor mai frecvente cauze ale v\u0103t\u0103m\u0103rilor \u00een lucr\u0103rile de construc\u021bii \u0219i dezafectare, prin:<\/p>\n<ul>\n<li>Instruirea muncitorilor cu privire la ridicarea \u0219i manipularea materialelor, la tehnici aplicate \u00een proiectele de construc\u021bii \u0219i dezafectare, inclusiv cu privire la stabilirea de limite de greutate a c\u0103ror dep\u0103\u0219ire presupune utilizarea de asisten\u021b\u0103 mecanizat\u0103.<\/li>\n<li>Organizare de \u0219antier corespunz\u0103toare astfel \u00eenc\u00e2t s\u0103 fie evitat\u0103 manipularea manual\u0103 pe distan\u021be mari a \u00eenc\u0103rc\u0103turilor\/echipamente grele.<\/li>\n<li>Selectarea instrumentelor \u0219i proiectarea activit\u0103\u021bilor astfel \u00eenc\u00e2t s\u0103 se reduc\u0103 nevoia utiliz\u0103rii for\u021bei fizice.<\/li>\n<\/ul>\n<p>Implementarea de controale administrative \u00een cadrul proceselor de lucru, de exemplu rota\u021bia pe post \u0219i pauze de odihn\u0103. <a name=\"_Toc147737886\"><\/a><\/p>\n<p>&nbsp;<\/p>\n<p><a name=\"_Toc184731103\"><\/a><strong>ANEXA 2. CADRUL JURIDIC \u0218I DE REGLEMENTARE NA\u021aIONAL<\/strong><a name=\"_Toc512584040\"><\/a><a name=\"_Toc50117213\"><\/a><a name=\"_Toc50122654\"><\/a><a name=\"_Toc125385838\"><\/a><a name=\"_Toc147737887\"><\/a><\/p>\n<p>Republica Moldova dispune de o nou\u0103 baz\u0103 legislativ\u0103, majoritatea c\u0103reia a fost aliniat\u0103 la <em>acquis-ul comunitar<\/em> al UE, \u00een conformitate cu Acordul de Asociere. O parte din legisla\u021bia principal\u0103 asociat\u0103 cu propunerea de proiect \u0219i activit\u0103\u021bile care vor fi implementate este indicat\u0103 mai jos:<\/p>\n<ul>\n<li>Constitu\u021bia Republicii Moldova (1994);<\/li>\n<li>Legea privind protec\u021bia mediului nr. 1515-XII din 16 iunie (1993);<\/li>\n<li>Legea privind evaluarea impactului asupra mediului nr. 86 din 29.05.2014;<\/li>\n<li>Legea apelor nr. 272 din 23.12.2012;<\/li>\n<li>Codul funciar (1991) 828-XII din 25.12.91; modificat 22 din 15.02.2024 \u00een vigoare 07.03.2025<\/li>\n<li>Codul Urbanismului \u0219i Construc\u021biilor nr 434 din 28.12.2023; modificat prin LP 203 din 25.07.2024 \u00een vigoare 30.01.2025<\/li>\n<li>Legea cu privire la apa potabil\u0103 nr.272-XIV din 10 februarie (1999);<\/li>\n<li>Legea privind supravegherea de stat a s\u0103n\u0103t\u0103\u021bii publice, nr. 10-XVI din 03 februarie 2009;<\/li>\n<li>Legea privind fondul ariilor naturale protejate de stat, nr. 1538-XIII din 25 februarie 1998;<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p>Alte legi relevante SP:<\/p>\n<ul>\n<li>Legea privind activit\u0103\u021bile de acreditare \u0219i de evaluare a conformit\u0103\u021bii nr. 235 din 01.12.2011;<\/li>\n<li>Legea privind accesul la informa\u021bii nr. 982-XIV din 11.05.2000;<\/li>\n<li>Legea privind de\u0219eurile nr. 209 din 29.07.2016;<\/li>\n<li>Legea privind substan\u021bele chimice nr. 277 din 29.11.2018;<\/li>\n<li>Legea privind.calitatea aerului atmosferic, nr. 98 din 14.04.2022<\/li>\n<li>Legea privind ocrotirea monumentelor istorice, modificat\u0103 prin legea nr 132 din 26.05.2023<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><a name=\"_Toc147737900\"><\/a><a name=\"_Toc184731104\"><\/a><strong>ANEXA 3. GHID DE MEDIU PENTRU CONTRACTE DE LUCR\u0102RI CIVILE<\/strong><\/p>\n<p>Contractorul va fi obligat s\u0103 aplice standarde \u0219i proceduri pentru construc\u021bii, care s\u0103 fie viabile din punctul de vedere al mediului \u00eenconjur\u0103tor. Toate contractele de lucr\u0103ri civile vor trebui s\u0103 includ\u0103 urm\u0103toarele prevederi referitoare la protec\u021bia mediului:<\/p>\n<ol>\n<li>Luarea unor m\u0103suri \u0219i precau\u021bii pentru evitarea impactului de mediu advers, precum \u0219i a nepl\u0103cerilor \u0219i \u00eentreruperilor cauzate de execu\u021bia lucr\u0103rilor. Toate acestea vor fi luate prin evitare sau stopare, ori de c\u00e2te ori este posibil, mai degrab\u0103 dec\u00e2t reducerea sau diminuarea impactului generat.<\/li>\n<li>Respectarea tuturor legilor \u0219i reglement\u0103rilor na\u021bionale \u0219i locale. Alocarea responsabilit\u0103\u021bilor de implementare a m\u0103surilor de mediu \u0219i primirea de \u00eendrum\u0103ri \u0219i instruc\u021biuni de la inginer \u0219i de la autorit\u0103\u021bile de mediu.<\/li>\n<li>Minimizarea emisiilor de pulberi pentru evitarea sau minimizarea impactului advers asupra calit\u0103\u021bii aerului.<\/li>\n<li>P\u0103strarea circuitelor pietonale \u0219i rutiere \u0219i a accesului public la amplasamentele \u0219i facilit\u0103\u021bile \u00eenvecinate. Ofer\u0103 semnalistic\u0103, iluminat bran\u0219amente provizorii, pentru siguran\u021b\u0103 \u0219i confort.<\/li>\n<li>Prevenirea sau minimizarea vibra\u021biilor \u0219i zgomotului provenit de la autovehicule, echipamente \u0219i opera\u021biuni de consolidare \u0219i modernizare.<\/li>\n<li>Minimizarea pagubelor \u0219i remedierea vegeta\u021biei, \u00een cazul \u00een care exist\u0103 perturb\u0103ri din cauza lucr\u0103rilor.<\/li>\n<li>Protejarea apelor de suprafa\u021b\u0103 \u0219i a celor subterane, precum \u0219i a calit\u0103\u021bii solului, \u00eempotriva polu\u0103rii. Colectarea \u0219i neutralizarea materialelor pe baz\u0103 de ap\u0103 \u00een mod adecvat.<\/li>\n<\/ol>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><a name=\"_Toc147737901\"><\/a><a name=\"_Toc184731105\"><\/a><strong>ANEXA 4. CERIN\u021aE \u0218I M\u0102SURI\u00a0 DE MANIPULARE A AZBESTULUI.<\/strong><\/p>\n<p>Azbestul constituie un grup de minerale fibroase din categoria silica\u021bilor. \u00cen trecut, era utilizat pe scar\u0103 larg\u0103 pentru produc\u021bia mai multor produse de uz industrial \u0219i gospod\u0103resc datorit\u0103 propriet\u0103\u021bilor sale utile, cum ar fi re\u021binerea focului, capacitatea de izola\u021bie electric\u0103 \u0219i termic\u0103, stabilitatea sa chimic\u0103 \u0219i termic\u0103, precum \u0219i rezisten\u021ba sporit\u0103 la trac\u021biune.<\/p>\n<p>Totu\u0219i, la ora actual\u0103, azbestul este recunoscut ca fiind la originea mai multor afec\u021biuni \u0219i tipuri de cancer \u0219i este considerat a constitui un pericol pentru s\u0103n\u0103tate \u00een cazul \u00een care este inhalat. Datorit\u0103 faptului c\u0103 riscurile fa\u021b\u0103 de starea de s\u0103n\u0103tate, asociate cu expunerea la azbest sunt acum recunoscute la nivel general, organiza\u021biile din domeniul s\u0103n\u0103t\u0103\u021bii \u0219i al protec\u021biei angaja\u021bilor, institutele de cercetare \u0219i unele guverne au instituit interdic\u021bii privind utilizarea comercial\u0103 a azbestului.<\/p>\n<p>\u00cen UE, utilizarea azbestului este interzis\u0103 \u00eenc\u0103 de la 01 ianuarie 2005, pe c\u00e2nd \u00een Republica Moldova un act juridic \u00een acest context nu\u00a0 a fost aprobat La moment a fost trecut prin Guvern un proiect de lege privind importul, fabricarea \u0219i comercializarea foilor de azbest, expediat \u00een adresa Parlamentului.<\/p>\n<p>Conform bunelor practici, trebuie minimizate riscurile de s\u0103n\u0103tate prin evitarea utiliz\u0103rii acestuia \u00een cadrul opera\u021biunilor de renovare a cl\u0103dirilor publice din domeniul educa\u021biei<\/p>\n<p>\u00cen orice situa\u021bie, Banca Mondial\u0103 se a\u0219teapt\u0103 ca beneficiarii fondurilor sale \u0219i al\u021bi beneficiarii s\u0103 utilizeze materiale alternative orice de c\u00e2te ori este posibil.<\/p>\n<p>\u00cen condi\u021biile \u00een are azbestul este utilizat pentru acoperi\u0219uri acesta poate prezenta un risc pentru lucr\u0103tori \u0219i pentru popula\u021bia care locuie\u0219te \u00een apropierea cl\u0103dirilor care au nevoie de repara\u021bii capitale ce implic\u0103 \u00eenlocuirea acoperi\u0219urilor sau demol\u0103ri.<\/p>\n<p>\u00cen acest sens acoperi\u0219ul cu foi cu con\u021binut de azbest trebuie s\u0103 fie \u00eendep\u0103rtate cu aten\u021bie, stocate \u00eentr-o zon\u0103 separat\u0103 \u0219i \u00eenchis\u0103 \u0219i neutralizate (cu consim\u021b\u0103m\u00e2ntul administra\u021biei USM \u0219i a inspectorilor de mediu) \u00eentr-o ramp\u0103 ecologic\u0103 situat\u0103 \u00een zona respectiv\u0103 \u0219i utilizat\u0103 special pentru acest gen de material.<\/p>\n<p>USM trebuie s\u0103 solicite contractantului ca \u00eendep\u0103rtarea foilor de ardezie s\u0103 se desf\u0103\u0219oare \u00eentr-o modalitate care s\u0103 minimizeze expunerea lucr\u0103torilor \u0219i comunit\u0103\u021bii la azbest. \u00cen timpul lucr\u0103rilor de reabilitare, lucr\u0103torii trebuie s\u0103 evite distrugerea pl\u0103cilor de azbest \u0219i s\u0103 le stocheze \u00een mod adecvat pe \u0219antier, p\u00e2n\u0103 \u00een momentul \u00een care sunt neutralizate. Lucr\u0103torii trebuie s\u0103 poarte salopete de protec\u021bie, m\u0103nu\u0219i \u0219i m\u0103\u0219ti pentru c\u0103ile respiratorii \u00een timpul activit\u0103\u021bilor care implic\u0103 manipularea pl\u0103cilor de azbest. Este important\u0103 aceasta nu numai pentru protejarea comunit\u0103\u021bii \u0219i a mediului \u00eenconjur\u0103tor, dar \u0219i pentru a preveni reciclarea informal\u0103 a de\u0219eurilor \u0219i reutilizarea materialului recuperat astfel. \u00cendep\u0103rtarea \u0219i neutralizarea de\u0219eurilor de\u00a0 azbest, precum \u0219i alte m\u0103suri trebuie incluse at\u00e2t \u00een specifica\u021biile tehnice, c\u00e2t \u0219i \u00een devizele estimative de materiale. Contractantul poate dezvolta anumite PMMS-uri specifice fiec\u0103rui amplasament, pentru care exist\u0103 cerin\u021be privitoare la gestionarea de\u0219eurilor de azbest.<\/p>\n<p><strong>MCA NU vor fi utilizate \u00een construc\u021bii noi <\/strong><\/p>\n<p><a href=\"#_ftnref1\" name=\"_ftn1\"><em><strong>[1]<\/strong><\/em><\/a><em>Chiar dac\u0103 \u0219i colegiile pedagogice ar beneficia de acest program, de dragul simplit\u0103\u021bii se nume\u0219te P\u00ce\u00ceSM.<\/em><\/p>\n<p><a href=\"#_ftnref2\" name=\"_ftn2\"><em><strong>[2]<\/strong><\/em><\/a><a href=\"https:\/\/thedocs.worldbank.org\/en\/doc\/741681582580194727-0290022020\/original\/ESFGoodPracticeNoteonGBVinMajorCivilWorksv2.pdf\"><em>https:\/\/thedocs.worldbank.org\/en\/doc\/741681582580194727-0290022020\/original\/ESFGoodPracticeNoteonGBVinMajorCivilWorksv2.pdf<\/em><\/a>[:]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[:ro]\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Ministerul Educa\u021biei \u0219i Cercet\u0103rii \u00a0 Proiectul \u00cenv\u0103\u021b\u0103m\u00e2ntul Superior din Moldova PLAN DE MANAGEMENT SOCIAL \u0218I DE MEDIU SPECIFIC AMPLASAMENTULUI C\u0103minul nr.2 din a Universit\u0103\u021bii de Stat din Moldova Municipiul Chi\u0219in\u0103u, str. Tighina 2 \u00a0 Martie 2025 \u00a0 \u00a0 Cuprins INTRODUCERE \u0218I CONTEXT. 8 1.1.\u00a0\u00a0\u00a0\u00a0 Introducere. 8 1.2.\u00a0\u00a0\u00a0\u00a0 Descrierea General\u0103 a Proiectului 8 1.3.\u00a0\u00a0\u00a0\u00a0 Scopul [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[43],"tags":[],"rttpg_featured_image_url":null,"rttpg_author":{"display_name":"","author_link":"https:\/\/new80.usm.md\/?author=7"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/new80.usm.md\/?cat=43\" rel=\"category\">Rezultate Repara\u021bia capital\u00e2 a c\u00e2minului Nr. 2<\/a>","rttpg_excerpt":"[:ro]\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Ministerul Educa\u021biei \u0219i Cercet\u0103rii \u00a0 Proiectul \u00cenv\u0103\u021b\u0103m\u00e2ntul Superior din Moldova PLAN DE MANAGEMENT SOCIAL \u0218I DE MEDIU SPECIFIC AMPLASAMENTULUI C\u0103minul nr.2 din a Universit\u0103\u021bii de Stat din Moldova Municipiul Chi\u0219in\u0103u, str. Tighina 2 \u00a0 Martie 2025 \u00a0 \u00a0 Cuprins INTRODUCERE \u0218I CONTEXT. 8 1.1.\u00a0\u00a0\u00a0\u00a0 Introducere. 8 1.2.\u00a0\u00a0\u00a0\u00a0 Descrierea General\u0103 a Proiectului 8 1.3.\u00a0\u00a0\u00a0\u00a0 Scopul&hellip;","_links":{"self":[{"href":"https:\/\/new80.usm.md\/index.php?rest_route=\/wp\/v2\/posts\/39381"}],"collection":[{"href":"https:\/\/new80.usm.md\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/new80.usm.md\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/new80.usm.md\/index.php?rest_route=\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/new80.usm.md\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=39381"}],"version-history":[{"count":1,"href":"https:\/\/new80.usm.md\/index.php?rest_route=\/wp\/v2\/posts\/39381\/revisions"}],"predecessor-version":[{"id":39382,"href":"https:\/\/new80.usm.md\/index.php?rest_route=\/wp\/v2\/posts\/39381\/revisions\/39382"}],"wp:attachment":[{"href":"https:\/\/new80.usm.md\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=39381"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/new80.usm.md\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=39381"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/new80.usm.md\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=39381"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}